Predominantly retail with other uses
HILLSIDE AVENUE
QUEENS · BIN 4624108
💬 Discuss this project
2023Year Built
—Stories
K4Building Class
R3-2Zoning
6,229 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: AACRON REALTY LLC · 3,800 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof5p · 5 filings · 20 docs
Floor 25p · 4 filings · 20 docs
Floor 1Under Construction4p · 3 filings · 20 docs
Cellar5p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AACRON REALTY6507/14/2026
PUREWAL CONTRACTORS404/09/2026
M I T BROTHERS CONSTRUCTI303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/28/2022$650K—RAI KRUPA LLC → AACRON REALTY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOUN DESIGN CORP.106/28/2026
SUNG HO SHIN ARCHITECT, PC201/27/2026
M.S. SAVANI ARCHITECT, PC809/24/2025
LMW ENGINEERING GROUP LLC508/07/2024
ALL CITY ENGINEERING PC406/13/2024
JBA112/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M.S. SAVANI ARCHITECT,P.C.2403/21/2026
KC EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M I T BROTHERS CONSTRUCTIGeneral Contractor1607/08/2026
STRUCTURE R US INCGeneral Contractor603/21/2026
SOLAR PRO INCGeneral Contractor303/21/2026
RRP PLUMBING CORPPlumbing207/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/14/2026
PUREWAL CONTRACTORS INCGeneral Contractor104/09/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUNG HO SHIN ARCHITECT2997201/27/2026
IP CONCRETE TESTING AND I6252409/24/2025
JUST CONSULTING ENGINEERI58651309/24/2025
WORLD DESIGN ARCHITECTURE9323112/18/2023
Building Lifecycle
All (150)Filed (21)Permit Issued (17)Signed Off (10)Violation (9)Inspection (21)Objection (42)Special Inspection (30)
08/10/2026
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01404322-I1
08/06/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
07/13/2026
Permit issued — Sign
Q01404322-I1-SG
06/28/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01404322-I1
04/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/16/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING STORE TO CONVERT IT INTO A NEW RESTAURANT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01300379-I1
04/14/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/01/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/23/2026
Permit issued — Plumbing
Q01300379-S2-PL
03/20/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/09/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/27/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE TO CONVERT IT INTO A NEW RESTAURANT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01300379-S2
12/15/2025
Permit issued — General Construction
Q01300379-I1-GC
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
SUNG HO SHIN
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
10/28/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/22/2025
Objection raised — Other
10/22/2025
Objection raised — Other
10/22/2025
Objection raised — Other
10/10/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE TO CONVERT IT INTO A NEW RESTAURANT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS IS INVOLVED UNDER THIS APPLICATION.
Q01300379-I1
10/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
SUNG HO SHIN
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOJUN WANG
09/26/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
XIAOJUN WANG
09/26/2025
Special inspection requirement — Sprayed fire-resistant materials
XIAOJUN WANG
09/26/2025
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
09/26/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
INDARDEO PARBHUNATH
09/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAOJUN WANG
09/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOJUN WANG
09/26/2025
Special inspection requirement — Insulation placement and R values
XIAOJUN WANG
09/26/2025
Special inspection requirement — Fenestration areas
XIAOJUN WANG
09/26/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
INDARDEO PARBHUNATH
09/26/2025
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
09/26/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
XIAOJUN WANG
09/24/2025
Filed — New Building
THIS APPLICATION IS FILED FOR NEW 2 STORY MIXED-USE BUILDING (U.G. 2 & 6) - 2 COMMERCIAL RETAIL STORES ON 1ST FL AND 2 DWELLING UNITS ON 2ND FL.
Q00765902-P6
09/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOJUN WANG
09/19/2025
Special inspection requirement — Sprayed fire-resistant materials
XIAOJUN WANG
09/19/2025
Special inspection requirement — Fenestration areas
XIAOJUN WANG
09/19/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
INDARDEO PARBHUNATH
09/19/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOJUN WANG
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
09/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAOJUN WANG
09/19/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
INDARDEO PARBHUNATH
09/19/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
XIAOJUN WANG
09/19/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
XIAOJUN WANG
09/19/2025
Special inspection requirement — Insulation placement and R values
XIAOJUN WANG
09/19/2025
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
09/19/2025
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
09/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/17/2025
Filed — New Building
THIS APPLICATION IS FILED FOR NEW 2 STORY MIXED-USE BUILDING (U.G. 2 & 6) - 2 COMMERCIAL RETAIL STORES ON 1ST FL AND 2 DWELLING UNITS ON 2ND FL.
Q00765902-P5
09/15/2025
Filed — New Building
THIS APPLICATION IS FILED FOR NEW 2 STORY MIXED-USE BUILDING (U.G. 2 & 6) - 2 COMMERCIAL RETAIL STORES ON 1ST FL AND 2 DWELLING UNITS ON 2ND FL.
Q00765902-P4
05/12/2025
Filed — New Building
THIS APPLICATION IS FILED FOR NEW 2 STORY MIXED-USE BUILDING (U.G. 2 & 6) - 2 COMMERCIAL RETAIL STORES ON 1ST FL AND 2 DWELLING UNITS ON 2ND FL.
Q00765902-P3
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC07/13/2026
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR03/23/2026
DOB NOWGeneral ConstructionSigned-offPUREWAL CONTRACTORS INC12/15/2025
DOB NOWPlumbingSigned-offRRP PLUMBING CORP04/09/2024
DOB NOWSolarPermit IssuedSOLAR PRO INC02/05/2024
DOB NOWMechanical SystemsSigned-offM I T BROTHERS CONSTRUCTI10/06/2023
DOB NOWStructuralSigned-offM I T BROTHERS CONSTRUCTI09/21/2023
DOB NOWPlumbingSigned-offRRP PLUMBING CORP08/16/2023
DOB NOWGeneral ConstructionPermit IssuedM I T BROTHERS CONSTRUCTI08/15/2023
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.08/07/2023
DOB NOWSupport of ExcavationSigned-offSTRUCTURE R US INC08/02/2023
DOB NOWGeneral ConstructionPermit IssuedM I T BROTHERS CONSTRUCTI07/12/2023
DOB NOWConstruction FenceSigned-offM I T BROTHERS CONSTRUCTI07/12/2023
DOB NOWGeneral ConstructionPermit IssuedM I T BROTHERS CONSTRUCTI05/05/2023
DOB NOWConstruction FenceSigned-offM I T BROTHERS CONSTRUCTI03/23/2023
DOB NOWFoundationSigned-offSTRUCTURE R US INC12/13/2022
DOB NOWConstruction FenceSigned-offM I T BROTHERS CONSTRUCTI10/05/2022
BIS—ISSUEDCREATIVE FOODS CORP.12/11/2007
1 project · most recent 01/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/27/2026Permit IssuedINFINITI ESC PLUMBING CORGas, Water/Sanitary
5 projects · most recent 05/17/2026
General Wiring
FiledStatusContractorScope
05/17/2026CompleteASKO ELEC CONST & MAIN IN—
02/09/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
10/25/2024CompleteJUN SAFETY ELECTRICAL INCGeneral Wiring
09/20/2024CompleteVILLAGE ELECTL CONTRS INCGeneral Wiring
12/11/2023CompleteVILLAGE ELECTL CONTRS INC—
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
08/06/2026Pass-Final Sign Permit InspectionPassView ↗
04/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/20/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/20/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/31/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/30/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 116
DateRequirementInspectorRole
12/11/2025Tenant Protection Plan ComplianceSUNG HO SHINspecial
12/11/2025Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
10/09/2025Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
10/09/2025Tenant Protection Plan ComplianceSUNG HO SHINspecial
09/26/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationINDARDEO PARBHUNATHspecial
09/26/2025Mastic and Intumescent Fire-resistant CoatingsINDARDEO PARBHUNATHspecial
09/26/2025Energy Code Compliance InspectionsXIAOJUN WANGprogress
09/26/2025Fire-Resistance Rated ConstructionXIAOJUN WANGprogress
09/26/2025Wall Panels, Curtain Walls, and VeneersXIAOJUN WANGspecial
09/26/2025Fenestration areasXIAOJUN WANGenergy_progress
09/26/2025Air barrier - visual inspectionXIAOJUN WANGenergy_progress
09/26/2025Insulation placement and R valuesXIAOJUN WANGenergy_progress
09/26/2025Fenestration air leakageXIAOJUN WANGenergy_progress
09/26/2025Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
09/26/2025Exterior Insulation and Finish Systems (EIFS)XIAOJUN WANGspecial
09/26/2025Sprayed fire-resistant materialsXIAOJUN WANGspecial
09/26/2025Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
09/19/2025Mastic and Intumescent Fire-resistant CoatingsINDARDEO PARBHUNATHspecial
09/19/2025Fenestration areasXIAOJUN WANGenergy_progress
09/19/2025Fenestration air leakageXIAOJUN WANGenergy_progress
09/19/2025Air barrier - visual inspectionXIAOJUN WANGenergy_progress
09/19/2025Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
09/19/2025Insulation placement and R valuesXIAOJUN WANGenergy_progress
09/19/2025Fire-Resistance Rated ConstructionXIAOJUN WANGprogress
09/19/2025Energy Code Compliance InspectionsXIAOJUN WANGprogress
Latest 25 of 116.
▾Documents — 256 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/25/2026Q00792299-I1Request digital key ↗
08/25/2026Q00792299-P1Request digital key ↗
08/25/2026Q00789951-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION10
01/12/2026410000706Open ↗
09/26/2025410000706Open ↗
12/05/2022440749736Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
08/27/2025440749736Open ↗
▸BISWORK PERMIT APPLICATION1
12/11/2007410000706Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/28/2024440749736Open ↗
▸Zoning, Tax Lot & Property Records24
▸DOB NOWRestrictive Declaration/Easement 17
08/18/2026Q00765902-P6Open ↗
08/18/2026Q00765902-P5Open ↗
08/18/2026Q00765902-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram7
08/18/2026Q00765902-P3Open ↗
08/18/2026Q00765902-P6Open ↗
08/18/2026Q00765902-P5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/18/2026Q00765902-P6Open ↗
08/18/2026Q00765902-P5Open ↗
08/18/2026Q00765902-P4Open ↗
Showing 3 of 7 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
01/09/2023440749736Open ↗
12/08/2021421792386Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q00765902-I1Open ↗
▸Seals & Professional Certifications98
▸DOB NOWProgress Inspector Seal & Signature42
09/02/2026Q00792299-I1Open ↗
09/02/2026Q00792299-I1Open ↗
08/27/2026Q00789951-I1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
09/02/2026Q00792299-I1Open ↗
08/30/2026Q00789967-I1Open ↗
08/27/2026Q00789951-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/25/2026Q00792299-I1Open ↗
08/25/2026Q00789951-I1Open ↗
08/25/2026Q00790964-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPC FULL REPORT1
01/11/2016410000706Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/13/2022440749736Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/13/2022440749736Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
08/18/2026Q00765902-P6Open ↗
08/18/2026Q00765902-P5Open ↗
08/18/2026Q00765902-P4Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist7
08/18/2026Q00765902-P6Open ↗
08/18/2026Q00765902-P5Open ↗
08/18/2026Q00765902-P4Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
01/09/2023440749736Open ↗
▸BISSTREET TREE SIGNOFF1
04/16/2025440749736Open ↗
▸DOB NOWStreet Trees Site Plan1
08/14/2026Q00765902-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/14/2026Q00765902-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026Q00765902-I1Open ↗
▸Environmental & Asbestos22
▸DOB NOWOER: Notice to Proceed12
08/17/2026Q01300379-S2Open ↗
08/14/2026Q00765902-I1Open ↗
08/14/2026Q00765902-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
08/14/2026Q00765902-I1Open ↗
08/14/2026Q00765902-P1Open ↗
08/13/2026Q00789951-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/11/2007410000706Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
01/08/2025440749736Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
10/13/2022440749736Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis3
08/14/2026Q00765902-I1Open ↗
08/13/2026Q00792299-I1Open ↗
08/13/2026Q00792298-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00792298-I1Open ↗
▸Inspections & Test Reports3
▸BISBPP: FIELD INSPECTION1
01/08/2025440749736Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00789951-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00789951-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
10/07/2015410000706Open ↗
07/15/2015410000706Open ↗
04/18/2015410000706Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/17/2021410000706Open ↗
09/17/2021410000706Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
05/21/2008410000706Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/11/2007410000706Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/27/2025440749736Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00978159-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
12/11/2007410000706Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
08/27/2025440749736Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
01/09/2023440749736Open ↗
12/08/2021421792386Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/13/2022440749736Open ↗
▸Other Documents34
▸DOB NOWSite Survey: Initial7
08/18/2026Q00765902-P5Open ↗
08/18/2026Q00765902-P4Open ↗
08/18/2026Q00765902-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/18/2026Q00765902-P6Open ↗
08/18/2026Q00765902-P5Open ↗
08/18/2026Q00765902-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/18/2026Q00765902-P6Open ↗
08/18/2026Q00765902-P5Open ↗
08/18/2026Q00765902-P4Open ↗
Showing 3 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
08/27/2025440749736Open ↗
05/28/2024440749736Open ↗
10/13/2022440749736Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00789967-I1Open ↗
08/13/2026Q00789951-I1Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
04/16/2025440749736Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
08/27/2025440749736Open ↗
▸BISRP 6021
01/09/2023440749736Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/09/2023440749736Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/08/2021421792386Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
01/08/2025440749736Open ↗
▸BISFINAL ST11
04/16/2025440749736Open ↗
▸DOB NOWFinal Survey1
08/14/2026Q00765902-I1Open ↗