Zoned residential, not Manhattan
HINSDALE STREET
BROOKLYN · BIN 3429657
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6AZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned residential, not Manhattan · Owner of record: HELP HINSDALE C HOUSING DEVELOPMENT FUND CORPORATI · 18,389 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof4p · 2 filings · 19 docs
Bulkhead1p · 1 filing · 15 docs
Floor 6Under Construction62p · 1 filing · 20 docs
Floor 5Under Construction60p · 2 filings · 20 docs
Floor 4Under Construction54p · 1 filing · 20 docs
Floor 3Under Construction66p · 1 filing · 20 docs
Floor 2Under Construction60p · 1 filing · 20 docs
Floor 1Under Construction184p · 1 filing · 20 docs
CellarUnder Construction152p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP807/08/2026
HELP DEVELOPMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VCD1403/21/2026
AE DESIGN SOLUTION803/21/2026
JM ZONING, LLC.1603/21/2026
S R SOLAR DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONADNOCK GEN'L CONT INCGeneral Contractor1507/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor507/08/2026
CMA PLUMBING & HEATING INFire Protection407/08/2026
EMES SOLAR INCGeneral Contractor303/21/2026
WOODHAVEN MASON LLCGeneral Contractor307/08/2026
SULLIVAN GROUP DESIGNGeneral Contractor203/22/2026
SUPREME MECH NYC LLCPlumbing207/08/2026
MONADNOCK CONSTRUCTION INGeneral Contractor104/09/2026
NULINE MCHNCL SRVCSPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031607/08/2026
NKM ENGINEERING PLLC6244112/04/2024
Building Lifecycle
All (157)Filed (30)Permit Issued (27)Signed Off (11)Inspection (19)Objection (40)Special Inspection (30)
08/28/2026
Signed off — New Building
INSTALL SUPPORT OF EXCAVATION AS PER PLANS FILED.
B00873882-S5
08/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Fenestration areas
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Sprayed fire-resistant materials
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Protection of exposed foundation insulation
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
08/19/2026
Special inspection requirement — Air barrier — testing
SAMI HAJJAR P.E
08/13/2026
Objection resolved — Resolved
07/28/2026
Objection raised — Other
07/17/2026
Signed off — Alteration
B01141935-I1
07/08/2026
Filed — New Building
INSTALL SUPPORT OF EXCAVATION AS PER PLANS FILED.
B00873882-A5
06/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2026
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Fenestration areas
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Air barrier — testing
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Protection of exposed foundation insulation
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Sprayed fire-resistant materials
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMI HAJJAR P.E
06/24/2026
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
05/28/2026
Filed — New Building
INSTALL SUPPORT OF EXCAVATION AS PER PLANS FILED.
B00873882-A4
05/05/2026
Signed off — New Building
INSTALL SUPPORT OF EXCAVATION AS PER PLANS FILED.
B00873882-S7
03/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/03/2026
Signed off — New Building
INSTALL SUPPORT OF EXCAVATION AS PER PLANS FILED.
B00873882-S2
03/03/2026
Signed off — New Building
INSTALL SUPPORT OF EXCAVATION AS PER PLANS FILED.
B00873882-S3
03/03/2026
Signed off — New Building
INSTALL SUPPORT OF EXCAVATION AS PER PLANS FILED.
B00873882-S1
02/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/06/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/24/2025
Permit issued — General Construction
B00873882-I1-GC
10/08/2025
Permit issued — Sprinklers
B00873882-S6-EW-SP
10/07/2025
Permit issued — Sprinklers
B00873882-S6-EW-SD
08/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/14/2025
Objection resolved — Addressed
08/07/2025
Objection raised — Other
08/06/2025
Objection resolved — Addressed
07/25/2025
Signed off — Alteration
installation of supported scaffolding
B01120640-I1
07/25/2025
Signed off — Alteration
PROPOSED TO INSTALL NEEDLE BEAM SUPPORTED SCAFFOLD SYSTEM A
B01155244-I1
07/21/2025
Filed — New Building
INSTALL SUPPORT OF EXCAVATION AS PER PLANS FILED.
B00873882-A2
07/17/2025
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
07/17/2025
Special inspection requirement — Standpipe Systems
SAMI HAJJAR P.E
07/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/09/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01076680-I1
06/25/2025
Filed — New Building
INSTALL SUPPORT OF EXCAVATION AS PER PLANS FILED.
B00873882-P9
04/30/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01106948-I1
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC11/24/2025
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN10/08/2025
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN10/07/2025
DOB NOWSupport of ExcavationSigned-offMONADNOCK GEN'L CONT INC04/24/2025
DOB NOWMechanical SystemsSigned-offMONADNOCK GEN'L CONT INC04/22/2025
DOB NOWStructuralPermit IssuedMONADNOCK GEN'L CONT INC04/22/2025
DOB NOWConstruction FenceSigned-offMONADNOCK GEN'L CONT INC04/22/2025
DOB NOWFoundationSigned-offMONADNOCK GEN'L CONT INC04/22/2025
DOB NOWPlumbingSigned-offTOMMASO SAVELLA03/18/2025
DOB NOWSupported ScaffoldSigned-offWOODHAVEN MASON LLC02/19/2025
DOB NOWSupported ScaffoldSigned-offWOODHAVEN MASON LLC02/13/2025
DOB NOWSolarSigned-offEMES SOLAR INC01/22/2025
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC12/02/2024
DOB NOWSupported ScaffoldSigned-offWOODHAVEN MASON LLC11/13/2024
DOB NOWStandpipeSigned-offCMA PLUMBING & HEATING IN10/09/2024
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN10/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC09/06/2024
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC08/08/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/09/2024
DOB NOWPlumbingSigned-offTOMMASO SAVELLA05/30/2024
DOB NOWMechanical SystemsSigned-offMONADNOCK GEN'L CONT INC05/13/2024
DOB NOWConstruction FenceSigned-offMONADNOCK GEN'L CONT INC05/07/2024
DOB NOWSupport of ExcavationSigned-offMONADNOCK GEN'L CONT INC05/06/2024
DOB NOWStructuralPermit IssuedMONADNOCK GEN'L CONT INC05/03/2024
DOB NOWFoundationSigned-offMONADNOCK GEN'L CONT INC05/03/2024
DOB NOWConstruction FenceSigned-offMONADNOCK CONSTRUCTION IN02/09/2024
1 project · most recent 07/08/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2026Permit IssuedMONADNOCK GEN'L CONT INCAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Lg ARNU283M2A4 28,000 CFM · Vrf Indoor ×4
ARNU123TRD4 12,300 CFM · Vrf Indoor ×3
ARNU243M1A4 24,000 CFM · Vrf Indoor ×2
ARNU053SJA4 240 CFM · Vrf Indoor ×1
ARNU073SJA4 7,500 CFM · Vrf Indoor ×1
ARNU073TRD4 7,500 CFM · Vrf Indoor ×1
ARNU093SJA4 9,600 CFM · Vrf Indoor ×1
ARNU123M1A4 12,000 CFM · Vrf Indoor ×1
ARNU123SJA4 9,600 CFM · Vrf Indoor ×1
Heat / Cool
Lg ARUM192BTE5 192,000 BTU · Vrf Outdoor ×8
ARUM096BTE5 96,000 CFM · Vrf Outdoor ×1
ARUM140BTE5 140,000 BTU · Vrf Outdoor ×1
ARUM144BTE5 144,000 BTU · Vrf Outdoor ×1
ARUM168BTE5 168,000 BTU · Vrf Outdoor ×1
ARUM182BTE5 192,000 CFM · Vrf Outdoor ×1
ARUM216BTE5 216,000 BTU · Vrf Outdoor ×1
ARUM241BTE5 241,000 BTU · Vrf Outdoor ×1
ARUM96BTE5 96,000 BTU · Vrf Outdoor ×1
ARUN024GSS4 24,000 BTU · Vrf Outdoor ×1
Heating
Trane UHAA151ATAD 5,119 BTU · Electric Heater ×9
Ventilation
Ventacity VS1000RT 960 CFM · Erv ×3
VS3000RT 1,845 CFM · Erv ×2
__Junk__ DXF-1 4,800 CFM · Exhaust Fan ×1
SAF-1 800 CFM · Exhaust Fan ×1
1 project · most recent 07/08/2026
Sprinkler System
FiledStatusContractorScope
07/08/2026Signed-offCMA PLUMBING & HEATING INSprinkler System
1 project · most recent 07/08/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/08/2026Signed-offSUPREME MECH NYC LLCStorm, Water/Sanitary
7 projects · most recent 01/27/2025
General Wiring
FiledStatusContractorScope
01/27/2025CompleteALLBRIGHT ELECTRIC, INC—
09/23/2024CompleteB.P. ELECTRIC CORP—
09/18/2024CompleteTF ELECTRICAL CORPGeneral Wiring
07/11/2024CompleteSOLAS ELECTRICAL CORP—
06/05/2024CompleteRGF ELECTRIC CORPGeneral Wiring
05/09/2024Permit IssuedRGF ELECTRIC CORP1 meters, 1 new_meters
12/27/2023CancelledAMBER LITE ELECTRIC CORP.1 meters, 1 new_meters
1 project · most recent 07/08/2026
Steel Masonry
FiledStatusContractorScope
07/08/2026Permit IssuedMONADNOCK GEN'L CONT INCSteel, Masonry
1 project · most recent 07/08/2026
Fence
FiledStatusContractorScope
07/08/2026Permit IssuedMONADNOCK GEN'L CONT INCFence
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
06/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/17/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/07/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/02/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/24/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/24/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/17/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 118
DateRequirementInspectorRole
08/19/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
08/19/2026Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
08/19/2026Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
08/19/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
08/19/2026VestibulesSAMI HAJJAR P.Eenergy_progress
08/19/2026Protection of exposed foundation insulationSAMI HAJJAR P.Eenergy_progress
08/19/2026Air barrier — testing SAMI HAJJAR P.Eenergy_progress
08/19/2026Fenestration areasSAMI HAJJAR P.Eenergy_progress
08/19/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
08/19/2026Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
08/19/2026Sprayed fire-resistant materialsSAMI HAJJAR P.Especial
08/19/2026Wall Panels, Curtain Walls, and VeneersSAMI HAJJAR P.Especial
08/19/2026Exterior Insulation and Finish Systems (EIFS)SAMI HAJJAR P.Especial
08/19/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
06/24/2026Sprayed fire-resistant materialsSAMI HAJJAR P.Especial
06/24/2026Fenestration areasSAMI HAJJAR P.Eenergy_progress
06/24/2026Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
06/24/2026Air barrier — testing SAMI HAJJAR P.Eenergy_progress
06/24/2026VestibulesSAMI HAJJAR P.Eenergy_progress
06/24/2026Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
06/24/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
06/24/2026Protection of exposed foundation insulationSAMI HAJJAR P.Eenergy_progress
06/24/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
06/24/2026Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
06/24/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
Latest 25 of 118.
▾Documents — 175 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
08/24/2026B01076680-P1Request digital key ↗
08/24/2026B01076680-I1Request digital key ↗
08/24/2026B01076682-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸Applications & Permits10
▸DOB NOWDEP Stormwater Construction Permit4
08/15/2026B00873882-A5Open ↗
08/13/2026B00873882-P7Open ↗
08/13/2026B00873882-P3Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
02/22/2024340905122Open ↗
12/05/2023340905122Open ↗
▸DOB NOWHPD - Permit Notice2
08/13/2026B00873882-P3Open ↗
08/13/2026B00873882-I1Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/05/2023340905122Open ↗
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
08/13/2026B00873882-I1Open ↗
▸Zoning, Tax Lot & Property Records27
▸DOB NOWRestrictive Declaration/Easement 117
08/15/2026B00873882-A5Open ↗
08/13/2026B00873882-P2Open ↗
08/13/2026B00873882-S4Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/21/2026B00873882-I1Open ↗
08/15/2026B00873882-A5Open ↗
08/13/2026B00873882-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/15/2026B00873882-A5Open ↗
08/13/2026B00873882-I1Open ↗
08/13/2026B00873882-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00873882-I1Open ↗
▸Seals & Professional Certifications64
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/24/2026B01076680-I1Open ↗
08/24/2026B01076682-I1Open ↗
08/23/2026B01141935-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/07/2026B00873882-A5Open ↗
09/07/2026B00873882-A5Open ↗
09/01/2026B00873882-S5Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/29/2026B00873882-P1Open ↗
09/07/2026B00873882-A5Open ↗
09/07/2026B00873882-A5Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/05/2023340905122Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00873882-P7Open ↗
08/13/2026B00873882-P3Open ↗
08/13/2026B00873882-I1Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist4
08/15/2026B00873882-A5Open ↗
08/15/2026B00873882-P3Open ↗
08/14/2026B00873882-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
02/22/2024340905122Open ↗
12/05/2023340905122Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/05/2023340905122Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/22/2024340905122Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00873882-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00873882-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00873882-S4Open ↗
08/13/2026B00873882-S5Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/24/2026B01076680-I1Open ↗
08/23/2026B01141935-I1Open ↗
08/23/2026B01120640-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/23/2026B01141935-I1Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
02/22/2024340905122Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/05/2023340905122Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial4
08/15/2026B00873882-A5Open ↗
08/13/2026B00873882-I1Open ↗
08/13/2026B00873882-P7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/15/2026B00873882-A5Open ↗
08/13/2026B00873882-P3Open ↗
08/13/2026B00873882-P7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/15/2026B00873882-A5Open ↗
08/15/2026B00873882-P3Open ↗
08/14/2026B00873882-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/22/2024340905122Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/22/2024340905122Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00873882-S1Open ↗