0Year Built
—Stories
Z9Building Class
R3AZoning
0 sfGross Floor Area
0Units
Other miscellaneous · Owner of record: J.K. PETROLEUM, INC. · 11,552 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Filed — no permit issued9p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE108/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GRINBERG MANAGEMENT103/21/2026
Building Lifecycle
All (71)Filed (1)Objection (56)Special Inspection (14)
10/20/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/25/2022
Objection raised — Admin
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Other
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Structural
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Scope
08/25/2022
Objection raised — Mechanical
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Other
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Structural
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Scope
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Structural
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Fire_Protection
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Fire_Protection
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Fire_Protection
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Structural
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Fire_Protection
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Inspections
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection raised — Zoning
08/25/2022
Objection raised — Zoning
08/25/2022
Objection resolved — Addressed
08/15/2022
Filed — New Building
New Building- Detached Two-Family House
S00725416-I1
08/12/2022
Special inspection requirement — Concrete - Cast-In-Place
08/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 71 events.
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/20/2023Subsurface Investigations (Borings/Test Pits)—special
08/12/2022Concrete - Cast-In-Place—special
08/12/2022Fire-Resistant Penetrations and Joints—special
08/12/2022Subgrade Inspections—special
08/12/2022Energy Code Compliance Inspections—progress
08/12/2022Fire-Resistance Rated Construction—progress
08/12/2022Air barrier — testing —energy_progress
08/12/2022Fenestration areas—energy_progress
08/12/2022Fenestration air leakage—energy_progress
08/12/2022Electric vehicle service equipment requirements—energy_progress
08/12/2022Interior lighting power—energy_progress
08/12/2022Metering—energy_progress
08/12/2022Fenestration and door U-factor and product ratings—energy_progress
08/12/2022Permanent certificate—energy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026S00725416-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00725416-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00725416-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/24/2026S00725416-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S00725416-I1Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00725416-I1Open ↗