| Owner | Filings | Most Recent |
|---|---|---|
| COLONIAL PROPERTIES | 17 | 07/08/2026 |
| PROFESSIONAL 109 | 2 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 06/27/2024 | $1.1M | — | PROFESSIONAL 109 LLC → Private party | $303/sf building |
| 05/16/2022 | $249K | — | KINGSLAND LOT INVESTORS LLC → PROFESSIONAL 109 LLC | — not available |
| 04/07/2022 | $125K | — | — → — | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| CL ENGINEERING P.C. | 5 | 02/08/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| METRO DESIGN CONSULTANTS INC | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PRECISION HOME DEV INC | General Contractor | 7 | 07/08/2026 |
| INFINITI ESC PLUMBING COR | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CL ENGINEERING P.C. | 6781 | 3 | 02/08/2024 |
| TRIANGLE INSPECTION & TES | 7495 | 1 | 06/09/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Signed-off | PRECISION HOME DEV INC | 05/30/2024 |
| DOB NOW | Plumbing | Signed-off | INFINITI ESC PLUMBING COR | 07/12/2023 |
| DOB NOW | Foundation | Permit Issued | PRECISION HOME DEV INC | 06/13/2023 |
| DOB NOW | Construction Fence | Signed-off | PRECISION HOME DEV INC | 12/28/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 02/08/2024 | Signed-off | PRECISION HOME DEV INC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Ventilation Hampton Bay 7114-01 50 CFM · Exhaust Fan ×5 Delta Breeze SMT150 150 BTU · Exhaust Fan ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/08/2024 | Signed-off | INFINITI ESC PLUMBING COR | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/25/2024 | Complete | SKY ELECTRIC LLC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/08/2024 | Signed-off | PRECISION HOME DEV INC | Steel, Wood |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/12/2024 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 03/11/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/27/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/06/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/18/2023 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 09/18/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 09/18/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/18/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 02/14/2024 | Duct leakage testing, insulation and design | CHRISTIAN LOZADA | energy_progress |
| 02/14/2024 | Subsurface Investigations (Borings/Test Pits) | Rajasekhar Sakhamuri | special |
| 02/14/2024 | Subgrade Inspections | CHRISTIAN LOZADA | special |
| 02/14/2024 | Heating Systems | CHRISTIAN LOZADA | special |
| 02/14/2024 | Structural Steel - Details | CHRISTIAN LOZADA | special |
| 02/14/2024 | Excavations - Sheeting, Shoring, and Bracing | CHRISTIAN LOZADA | special |
| 02/14/2024 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | CHRISTIAN LOZADA | special |
| 02/14/2024 | Structural Steel - High Strength Bolting | CHRISTIAN LOZADA | special |
| 02/14/2024 | Structural Cold-Formed Steel | CHRISTIAN LOZADA | special |
| 02/14/2024 | Concrete - Cast-In-Place | CHRISTIAN LOZADA | special |
| 02/14/2024 | Masonry | CHRISTIAN LOZADA | special |
| 02/14/2024 | Mechanical Systems | CHRISTIAN LOZADA | special |
| 02/14/2024 | Fire-Resistant Penetrations and Joints | CHRISTIAN LOZADA | special |
| 02/14/2024 | Energy Code Compliance Inspections | CHRISTIAN LOZADA | progress |
| 02/14/2024 | Fire-Resistance Rated Construction | CHRISTIAN LOZADA | progress |
| 02/14/2024 | Structural Wood Frame | CHRISTIAN LOZADA | progress |
| 02/14/2024 | Footing and Foundation | CHRISTIAN LOZADA | progress |
| 02/14/2024 | Final | CHRISTIAN LOZADA | progress |
| 02/14/2024 | Electric vehicle service equipment requirements | CHRISTIAN LOZADA | energy_progress |
| 02/14/2024 | Air barrier - visual inspection | CHRISTIAN LOZADA | energy_progress |
| 02/14/2024 | HVAC-R and service water heating equipment | CHRISTIAN LOZADA | energy_progress |
| 02/14/2024 | Fenestration areas | CHRISTIAN LOZADA | energy_progress |
| 02/14/2024 | Metering | CHRISTIAN LOZADA | energy_progress |
| 02/14/2024 | Ventilation and air distribution system | CHRISTIAN LOZADA | energy_progress |
| 02/14/2024 | Permanent certificate | CHRISTIAN LOZADA | energy_progress |