← Back
Zoned residential, not Manhattan
LAKEVIEW BLVD EAST
QUEENS · BIN 4625488
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3AZoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: PHANTOM & Z CAPITAL LLC · 1,013 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof1p · 1 filing · 2 docs
Floor 26p · 2 filings · 20 docs
Floor 15p · 2 filings · 20 docs
Cellar5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PHANTOM Z CAPITAL2604/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMINOV DESIGN ENGINEER, PC606/24/2026
NOVUM ENGINEERING305/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor504/09/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519806/24/2026
Building Lifecycle
All (77)Filed (9)Permit Issued (6)Signed Off (6)Inspection (16)Objection (40)
08/25/2026
Signed off — New Building
PROPOSED A 16'-0" CURB CUT INCLUDING (2) 1'-6" SPLAY ON LAKEVIEW BOULEVARD EAST. WORK FILED SUBSEQUENTLY WITH NB APPLICATION #Q01180150-I1
Q01180150-I1
06/24/2026
Filed — New Building
PROPOSED A 16'-0" CURB CUT INCLUDING (2) 1'-6" SPLAY ON LAKEVIEW BOULEVARD EAST. WORK FILED SUBSEQUENTLY WITH NB APPLICATION #Q01180150-I1
Q01180150-P3
05/21/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/18/2026
Signed off — Alteration
FOUNDATION WORK 2 STORY 2 FAMILY DWELLING.
Q01216248-I1
05/15/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/10/2026
Signed off — New Building
PROPOSED A 16'-0" CURB CUT INCLUDING (2) 1'-6" SPLAY ON LAKEVIEW BOULEVARD EAST. WORK FILED SUBSEQUENTLY WITH NB APPLICATION #Q01180150-I1
Q01180150-S1
04/02/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/31/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/20/2026
Signed off — Alteration
Q01216256-I1
03/20/2026
Permit issued — Curb Cut
Q01180150-S1-CC
03/19/2026
Signed off — Alteration
SOE FILED TO ERECT 2 STORY 2 FAMILY DWELLING.
Q01216235-I1
01/26/2026
Signed off — New Building
PROPOSED A 16'-0" CURB CUT INCLUDING (2) 1'-6" SPLAY ON LAKEVIEW BOULEVARD EAST. WORK FILED SUBSEQUENTLY WITH NB APPLICATION #Q01180150-I1
Q01180150-S3
01/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/17/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/08/2025
Filed — New Building
PROPOSED A 16'-0" CURB CUT INCLUDING (2) 1'-6" SPLAY ON LAKEVIEW BOULEVARD EAST. WORK FILED SUBSEQUENTLY WITH NB APPLICATION #Q01180150-I1
Q01180150-P2
12/07/2025
Filed — New Building
PROPOSED A 16'-0" CURB CUT INCLUDING (2) 1'-6" SPLAY ON LAKEVIEW BOULEVARD EAST. WORK FILED SUBSEQUENTLY WITH NB APPLICATION #Q01180150-I1
Q01180150-P1
10/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/22/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/22/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/03/2025
Permit issued — Mechanical Systems
Q01180150-I1-GC-CX
09/03/2025
Permit issued — Plumbing
Q01180150-S3-PL
06/30/2025
Permit issued — Foundation
Q01216248-I1-FO
06/25/2025
Permit issued — Structural
Q01216256-I1-ST
06/02/2025
Permit issued — Support of Excavation
Q01216235-I1-SE
05/29/2025
Filed — New Building
PROPOSED A 16'-0" CURB CUT INCLUDING (2) 1'-6" SPLAY ON LAKEVIEW BOULEVARD EAST. WORK FILED SUBSEQUENTLY WITH NB APPLICATION #Q01180150-I1
Q01180150-S3
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Scope
05/20/2025
Objection raised — Structural
05/15/2025
Objection raised — Structural
05/15/2025
Objection raised — Admin
05/15/2025
Objection raised — Structural
05/15/2025
Objection raised — Structural
05/15/2025
Objection raised — Structural
05/15/2025
Objection raised — Admin
05/15/2025
Objection raised — Structural
05/15/2025
Objection raised — Structural
05/15/2025
Objection raised — Structural
05/15/2025
Objection resolved — Addressed
05/09/2025
Objection raised — Admin
05/05/2025
Filed — Alteration
FOUNDATION WORK 2 STORY 2 FAMILY DWELLING.
Q01216248-I1
05/05/2025
Filed — Alteration
Q01216256-I1
05/05/2025
Filed — Alteration
SOE FILED TO ERECT 2 STORY 2 FAMILY DWELLING.
Q01216235-I1
04/25/2025
Filed — New Building
PROPOSED A 16'-0" CURB CUT INCLUDING (2) 1'-6" SPLAY ON LAKEVIEW BOULEVARD EAST. WORK FILED SUBSEQUENTLY WITH NB APPLICATION #Q01180150-I1
Q01180150-S1
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offYAFE MEOD CORP03/20/2026
DOB NOWMechanical SystemsPermit IssuedYAFE MEOD CORP09/03/2025
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP09/03/2025
DOB NOWFoundationSigned-offYAFE MEOD CORP06/30/2025
DOB NOWStructuralSigned-offYAFE MEOD CORP06/25/2025
DOB NOWSupport of ExcavationSigned-offYAFE MEOD CORP06/02/2025
1 project · most recent 06/24/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/24/2026Signed-offYAFE MEOD CORPHeating and Air Conditioning Systems
Heat / Cool
Aux ASPR18HPMULO 18,000 BTU · Heat Pump Outdoor ×3
ASPR36HPMULO 36,000 BTU · Heat Pump Outdoor ×3
ASPR42HPMULO 40,000 BTU · Heat Pump Outdoor ×3
1 project · most recent 06/24/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/24/2026Signed-offJMW PLUMBING, INCStorm, Water/Sanitary
1 project · most recent 08/01/2025
General Wiring
FiledStatusContractorScope
08/01/2025CompleteSKY ELECTRIC LLCGeneral Wiring
1 project · most recent 05/05/2025
FiledStatusContractorScope
05/05/2025Signed-offYAFE MEOD CORP1 scope_items
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
05/21/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/15/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/02/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
03/31/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/31/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/17/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/30/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/30/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/22/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
08/06/2026Mechanical SystemsYounes Abouyaalaspecial
08/06/2026Fenestration areasYounes Abouyaalaenergy_progress
08/06/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
08/06/2026Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
08/06/2026Maintenance informationYounes Abouyaalaenergy_progress
08/06/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
08/06/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
08/06/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/06/2026Permanent certificateYounes Abouyaalaenergy_progress
08/06/2026Fenestration air leakageYounes Abouyaalaenergy_progress
08/06/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
08/06/2026Air barrier — testing Younes Abouyaalaenergy_progress
08/06/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
08/06/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
08/06/2026Ventilation and air distribution systemYounes Abouyaalaenergy_progress
08/06/2026Interior lighting powerYounes Abouyaalaenergy_progress
08/06/2026MeteringYounes Abouyaalaenergy_progress
08/06/2026Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
08/06/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/06/2026FinalNAVEEN KUMARprogress
08/06/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
08/06/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/18/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
06/18/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/18/2026Mechanical SystemsYounes Abouyaalaspecial
Latest 25 of 73.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026Q01216235-I1Request digital key ↗
08/20/2026Q01216256-I1Request digital key ↗
08/20/2026Q01216248-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records14
▸DOB NOWRestrictive Declaration/Easement 16
08/18/2026Q01180150-S3Open ↗
08/18/2026Q01180150-S1Open ↗
08/18/2026Q01180150-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/18/2026Q01180150-I1Open ↗
08/18/2026Q01180150-P3Open ↗
08/13/2026Q01180150-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/18/2026Q01180150-I1Open ↗
08/18/2026Q01180150-P3Open ↗
08/13/2026Q01180150-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/18/2026Q01180150-I1Open ↗
08/13/2026Q01180150-P1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature11
09/17/2026Q01180150-P2Open ↗
09/17/2026Q01180150-P2Open ↗
08/26/2026Q01180150-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026Q01216256-I1Open ↗
08/20/2026Q01216248-I1Open ↗
08/18/2026Q01180150-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/17/2026Q01180150-P2Open ↗
08/26/2026Q01180150-I1Open ↗
08/25/2026Q01180150-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01180150-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/18/2026Q01180150-I1Open ↗
08/18/2026Q01180150-P3Open ↗
08/13/2026Q01180150-P1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q01180150-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/18/2026Q01180150-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01180150-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01216248-I1Open ↗
08/13/2026Q01216235-I1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026Q01216248-I1Open ↗
08/13/2026Q01216235-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q01216248-I1Open ↗
08/13/2026Q01216235-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/18/2026Q01180150-P3Open ↗
08/18/2026Q01180150-I1Open ↗
08/13/2026Q01180150-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/18/2026Q01180150-I1Open ↗
08/18/2026Q01180150-P3Open ↗
08/13/2026Q01180150-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/18/2026Q01180150-P3Open ↗
08/18/2026Q01180150-I1Open ↗
08/13/2026Q01180150-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01216235-I1Open ↗
▸DOB NOWFinal Survey1
08/18/2026Q01180150-I1Open ↗