0Year Built
—Stories
V1Building Class
R6BZoning
0 sfGross Floor Area
0Units
Zoned commercial or Manhattan residential · Owner of record: Q.F.D. OF NEW YORK, INC. · 8,750 sf lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLS DESIGNS611/24/2025
DB ENGINEERING SERVICES, PC110/30/2025
EXL STRUCTURAL CONSULTANTS209/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JLS DESIGNS903/21/2026
Building Lifecycle
All (90)Filed (9)Objection (65)Special Inspection (16)
07/27/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Addressed
07/07/2026
Objection resolved — Open
07/07/2026
Special inspection requirement — Concrete - Cast-In-Place
05/05/2026
Objection raised — Other
05/05/2026
Objection raised — Other
04/20/2026
Objection resolved — Resolved
01/21/2026
Objection resolved — Resolved
01/21/2026
Objection resolved — Resolved
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/20/2026
Objection resolved — Addressed
01/06/2026
Objection resolved — Addressed
01/06/2026
Objection resolved — Addressed
01/06/2026
Objection resolved — Addressed
11/28/2025
Objection raised — Structural
11/28/2025
Objection raised — Scope
11/28/2025
Objection raised — Admin
11/28/2025
Objection raised — Other
11/28/2025
Objection raised — Admin
11/28/2025
Objection raised — Scope
11/24/2025
Filed — Alteration
Proposed site and grade work with concrete pads and a privacy fence
Q01314310-I1
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Resolved
11/19/2025
Special inspection requirement — Post-installed Anchors
11/19/2025
Special inspection requirement — Subgrade Inspections
11/19/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
11/05/2025
Special inspection requirement — Concrete - Cast-In-Place
11/05/2025
Special inspection requirement — Masonry
11/05/2025
Special inspection requirement — Final
11/05/2025
Special inspection requirement — Subgrade Inspections
10/31/2025
Objection raised — Electrical
10/31/2025
Objection raised — Fire_Protection
10/31/2025
Objection raised — Zoning
10/31/2025
Objection raised — Electrical
10/31/2025
Objection raised — Inspections
10/31/2025
Objection raised — Scope
10/30/2025
Filed — Alteration
solar installation on E house roof in conjunction with ALT-CO application Q01228506-I1
Q01259817-I1
10/27/2025
Objection raised — Structural
10/16/2025
Objection raised — Other
10/16/2025
Objection raised — Other
10/15/2025
Objection raised — Other
10/14/2025
Objection raised — Other
10/14/2025
Objection raised — Other
10/14/2025
Objection raised — Other
10/14/2025
Objection raised — Other
10/14/2025
Objection raised — Inspections
10/14/2025
Objection raised — Other
10/14/2025
Objection raised — Other
10/14/2025
Objection raised — Other
09/26/2025
Filed — Alteration CO
INSTALLATION OF CONCRETE PADS FOR BESS MEGAPACKS, OTHER MINOR EQUIPMENT AND FOUNDATIONS FOR SOUNDWALL SYSTEM
Q01228506-S2
09/26/2025
Filed — Alteration CO
INSTALLATION OF CONCRETE PADS FOR BESS MEGAPACKS, OTHER MINOR EQUIPMENT AND FOUNDATIONS FOR SOUNDWALL SYSTEM
Q01228506-S1
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
Latest 60 of 90 events.
Nothing on file for this building.
2 projects · most recent 09/26/2025
FiledStatusContractorScope
09/26/2025——1 scope_items
06/23/2025——1 scope_items
1 project · most recent 10/30/2025
FiledStatusContractorScope
10/30/2025——16 panels, 8.64 kw, 700 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/07/2026Concrete - Cast-In-Place—special
11/19/2025Post-installed Anchors—special
11/19/2025Subgrade Inspections—special
11/19/2025Subsurface Conditions – Fill Placement & In-Place Density—special
11/05/2025Concrete - Cast-In-Place—special
11/05/2025Masonry—special
11/05/2025Final—progress
11/05/2025Subgrade Inspections—special
06/23/2025Final—progress
05/21/2025Footing and Foundation—progress
05/21/2025Masonry—special
05/21/2025Structural Steel - Details—special
05/21/2025Post-installed Anchors—special
05/21/2025Structural Steel - High Strength Bolting—special
05/21/2025Final—progress
05/21/2025Final—progress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/19/2026Q01228515-I1Request digital key ↗
08/19/2026Q01231005-I1Request digital key ↗
08/19/2026Q01230875-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
07/18/2025440823959Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/18/2025440823959Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/18/2025440823959Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01228506-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01228506-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/19/2026Q01228515-I1Open ↗
08/19/2026Q01231005-I1Open ↗
08/18/2026Q01228506-S1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/18/2025440823959Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/18/2025440823959Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
07/18/2025440823959Open ↗
▸DOB NOWStreet Tree Checklist1
08/18/2026Q01228506-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01228506-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWOER: Notice to Proceed1
08/18/2026Q01228506-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01228506-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01228506-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/18/2025440823959Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/18/2026Q01228506-I1Open ↗