2023Year Built
2Stories
A1Building Class
R3AZoning
1,747 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,150 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
StructuralPlumbingFire Protection
Roof1p · 1 filing · 20 docs
Floor 21p · 2 filings · 20 docs
Floor 11 filing · 20 docs
Basement1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAG CONSTRUCTION NYC1807/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DAWN PONISI703/21/2026
A TECH ENGINEERING NYC403/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C.A.G CONSTRUCTION CORPGeneral Contractor707/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738608/22/2024
PARKER AND WEST ENGINEERI5272102/08/2024
Building Lifecycle
All (58)Filed (11)Permit Issued (6)Signed Off (5)Inspection (6)Special Inspection (30)
08/28/2024
Special inspection requirement — Maintenance information
anthony santoro
08/28/2024
Special inspection requirement — Insulation placement and R values
anthony santoro
08/28/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
08/28/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
08/28/2024
Special inspection requirement — Air barrier — testing
anthony santoro
08/28/2024
Special inspection requirement — Permanent certificate
anthony santoro
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
08/28/2024
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
08/28/2024
Special inspection requirement — Subgrade Inspections
anthony santoro
08/28/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
08/28/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
08/28/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
08/28/2024
Special inspection requirement — Mechanical Systems
anthony santoro
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
08/28/2024
Special inspection requirement — Heating Systems
anthony santoro
08/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
08/28/2024
Special inspection requirement — Final
anthony santoro
08/28/2024
Special inspection requirement — Preliminary
anthony santoro
08/28/2024
Special inspection requirement — Footing and Foundation
anthony santoro
08/28/2024
Special inspection requirement — Structural Wood Frame
anthony santoro
08/28/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
08/28/2024
Special inspection requirement — Shutoff dampers
anthony santoro
08/28/2024
Special inspection requirement — Fenestration areas
anthony santoro
08/28/2024
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
08/28/2024
Special inspection requirement — Interior lighting power
anthony santoro
08/28/2024
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
08/28/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
08/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
08/22/2024
Filed — New Building
Plumbing & Drainage work for proposed one family dwelling
S00605833-P4
08/19/2024
Signed off — Alteration
S01000249-I1
08/06/2024
Signed off — Alteration
S00595830-I1
04/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/07/2024
Signed off — New Building
Plumbing & Drainage work for proposed one family dwelling
S00605833-S1
04/05/2024
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00725747-I1
02/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/15/2024
Permit issued — Solar
S01000249-I1-SL
02/08/2024
Filed — Alteration
S01000249-I1
02/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/04/2024
Filed — New Building
Plumbing & Drainage work for proposed one family dwelling
S00605833-P3
12/28/2023
Filed — New Building
Plumbing & Drainage work for proposed one family dwelling
S00605833-P2
12/28/2023
Filed — New Building
Plumbing & Drainage work for proposed one family dwelling
S00605833-P1
12/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/28/2023
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00725747-P1
10/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2023
Signed off — New Building
Plumbing & Drainage work for proposed one family dwelling
S00605833-S2
10/24/2023
Permit issued — Plumbing
S00725747-I1-PL
08/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/30/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/22/2023
Permit issued — Plumbing
S00605833-S1-PL
06/05/2023
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00725747-I1
05/17/2023
Permit issued — Construction Fence
S00605833-S2-FN
05/17/2023
Permit issued — Structural
S00605833-I1-GC-CX
04/12/2022
Permit issued — Foundation
S00605833-I1-GC-CX
10/26/2021
Filed — New Building
Plumbing & Drainage work for proposed one family dwelling
S00605833-S1
10/26/2021
Filed — New Building
Plumbing & Drainage work for proposed one family dwelling
S00605833-S2
10/06/2021
Filed — New Building
Plumbing & Drainage work for proposed one family dwelling
S00605833-I1
09/23/2021
Filed — Alteration
S00595830-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/15/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR10/24/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/22/2023
DOB NOWConstruction FenceSigned-offC.A.G CONSTRUCTION CORP05/17/2023
DOB NOWStructuralPermit IssuedC.A.G CONSTRUCTION CORP05/17/2023
DOB NOWFoundationPermit IssuedC.A.G CONSTRUCTION CORP04/12/2022
1 project · most recent 08/22/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/22/2024Signed-offC.A.G CONSTRUCTION CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Rheem ra1330aj1na 22,560 BTU · Condensing Unit ×2
Heating
Rheem R92PA0601317MSA 56,000 BTU · Furnace ×2
Ventilation
Systemair SER 150 145 CFM ×2
1 project · most recent 08/22/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/22/2024Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
2 projects · most recent 02/08/2024
General Wiring
FiledStatusContractorScope
02/08/2024CompleteSUNRUN SOLAR ELECTL CORP—
09/28/2023CompleteLASER LITE ELECT'L INC.General Wiring
1 project · most recent 08/22/2024
Concrete Wood
FiledStatusContractorScope
08/22/2024Signed-offFLOW-RIGHT PLBG & HTG CORConcrete, Wood
1 project · most recent 08/22/2024
Fence
FiledStatusContractorScope
08/22/2024Signed-offFLOW-RIGHT PLBG & HTG CORFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/30/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
08/28/2024Fenestration air leakageanthony santoroenergy_progress
08/28/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
08/28/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
08/28/2024Duct leakage testing, insulation and designanthony santoroenergy_progress
08/28/2024Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
08/28/2024Maintenance informationanthony santoroenergy_progress
08/28/2024Insulation placement and R valuesanthony santoroenergy_progress
08/28/2024Permanent certificateanthony santoroenergy_progress
08/28/2024Air barrier — testing anthony santoroenergy_progress
08/28/2024Subgrade Inspectionsanthony santorospecial
08/28/2024Concrete - Cast-In-Placeanthony santorospecial
08/28/2024Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
08/28/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
08/28/2024Mechanical Systemsanthony santorospecial
08/28/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
08/28/2024Heating Systemsanthony santorospecial
08/28/2024Fire-Resistance Rated Constructionanthony santoroprogress
08/28/2024Finalanthony santoroprogress
08/28/2024Preliminaryanthony santoroprogress
08/28/2024Footing and Foundationanthony santoroprogress
08/28/2024Structural Wood Frameanthony santoroprogress
08/28/2024Energy Code Compliance Inspectionsanthony santoroprogress
08/28/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
08/28/2024Shutoff dampersanthony santoroenergy_progress
08/28/2024Fenestration areasanthony santoroenergy_progress
Latest 25 of 90.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026S00595830-I1Request digital key ↗
08/23/2026S00725747-P1Request digital key ↗
08/23/2026S00725747-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
09/28/2021540207024Open ↗
09/22/2021540207024Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/22/2021540207024Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00605833-P1Open ↗
08/13/2026S00605833-P4Open ↗
08/13/2026S00605833-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00605833-P1Open ↗
08/13/2026S00605833-I1Open ↗
08/13/2026S00605833-P4Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00605833-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature13
08/31/2026S00605833-P1Open ↗
08/31/2026S00605833-P1Open ↗
08/29/2026S00605833-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026S00595830-I1Open ↗
08/23/2026S00725747-P1Open ↗
08/23/2026S00725747-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026S00605833-P1Open ↗
08/29/2026S00605833-P3Open ↗
08/25/2026S00605833-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/22/2021540207024Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/22/2021540207024Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00605833-P1Open ↗
08/13/2026S00605833-I1Open ↗
08/13/2026S00605833-P4Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00605833-I1Open ↗
08/13/2026S00605833-P1Open ↗
08/13/2026S00605833-P4Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00605833-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00605833-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00605833-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00605833-I1Open ↗
08/13/2026S00605833-S1Open ↗
▸Inspections & Test Reports2
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
09/22/2021540207024Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/22/2021540207024Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
09/28/2021540207024Open ↗
09/22/2021540207024Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01000249-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/22/2021540207024Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification3
08/21/2026S00605833-P4Open ↗
08/21/2026S00605833-P1Open ↗
08/21/2026S00605833-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026S00605833-I1Open ↗
08/13/2026S00605833-P1Open ↗
08/13/2026S00605833-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00605833-P1Open ↗
08/13/2026S00605833-I1Open ↗
08/13/2026S00605833-P4Open ↗
▸BISPROVIDE FORM RP-602.1
09/28/2021540207024Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/22/2021540207024Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00605833-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00605833-I1Open ↗