← Back
Two family frame
MAGUIRE AVENUE
STATEN ISLAND · BIN 5175418
💬 Discuss this project
2025Year Built
2Stories
B2Building Class
R3XZoning
2,450 sfGross Floor Area
2Units
Two family frame · Owner of record: BOMBAY RADIGAN LLC · 4,171 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE STAR GROUP1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT609/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BLUE STAR HOLDING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE STAR GROUP LLCGeneral Contractor407/08/2026
CAPITAL CONTR P&H CORPPlumbing107/08/2026
R&M PIPING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738209/10/2025
Building Lifecycle
All (56)Filed (6)Permit Issued (5)Signed Off (3)Inspection (12)Special Inspection (30)
02/19/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/29/2025
Signed off — New Building
PROPOSED TEMPORARY CONSTRUCTION FENCE FOR SITE CLEARING AND THE CONSTRUCTION OF TWO NEW DETACHED RESIDENCES. THIS ALSO APPLIES TO 735 MAGUIRE AVENUE.
S00702791-S3
12/29/2025
Signed off — New Building
PROPOSED TEMPORARY CONSTRUCTION FENCE FOR SITE CLEARING AND THE CONSTRUCTION OF TWO NEW DETACHED RESIDENCES. THIS ALSO APPLIES TO 735 MAGUIRE AVENUE.
S00702791-S2
12/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
09/22/2025
Signed off — New Building
PROPOSED TEMPORARY CONSTRUCTION FENCE FOR SITE CLEARING AND THE CONSTRUCTION OF TWO NEW DETACHED RESIDENCES. THIS ALSO APPLIES TO 735 MAGUIRE AVENUE.
S00702791-S4
09/17/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/10/2025
Filed — New Building
PROPOSED TEMPORARY CONSTRUCTION FENCE FOR SITE CLEARING AND THE CONSTRUCTION OF TWO NEW DETACHED RESIDENCES. THIS ALSO APPLIES TO 735 MAGUIRE AVENUE.
S00702791-P1
09/10/2025
Special inspection requirement — Fenestration areas
anthony santoro
09/10/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
09/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
09/10/2025
Special inspection requirement — Mechanical Systems
anthony santoro
09/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
09/10/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
09/10/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
09/10/2025
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
09/10/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
09/10/2025
Special inspection requirement — Final
anthony santoro
09/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
09/10/2025
Special inspection requirement — Footing and Foundation
anthony santoro
09/10/2025
Special inspection requirement — Structural Wood Frame
anthony santoro
09/10/2025
Special inspection requirement — Air barrier — testing
anthony santoro
09/10/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
09/10/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
09/10/2025
Special inspection requirement — Interior lighting power
anthony santoro
09/10/2025
Special inspection requirement — Air barrier continuity plan testing
anthony santoro
09/10/2025
Special inspection requirement — Lighting in dwelling units
anthony santoro
09/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
09/10/2025
Special inspection requirement — Maintenance information
anthony santoro
09/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
09/10/2025
Special inspection requirement — Permanent certificate
anthony santoro
09/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
09/10/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
09/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
09/10/2025
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
09/10/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
09/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
09/10/2025
Special inspection requirement — Ventilation and air distribution system
anthony santoro
09/09/2025
Permit issued — Curb Cut
S00702791-S4-CC
06/19/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/18/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/09/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/02/2025
Permit issued — Plumbing
S64584785-S3-PL
04/08/2025
Filed — New Building
PROPOSED TEMPORARY CONSTRUCTION FENCE FOR SITE CLEARING AND THE CONSTRUCTION OF TWO NEW DETACHED RESIDENCES. THIS ALSO APPLIES TO 735 MAGUIRE AVENUE.
S00702791-S4
03/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/13/2025
Permit issued — Plumbing
S00702791-S3-PL
02/11/2025
Filed — New Building
PROPOSED TEMPORARY CONSTRUCTION FENCE FOR SITE CLEARING AND THE CONSTRUCTION OF TWO NEW DETACHED RESIDENCES. THIS ALSO APPLIES TO 735 MAGUIRE AVENUE.
S00702791-S3
02/10/2025
Permit issued — Mechanical Systems
S00702791-I1-GC-CX
12/30/2024
Permit issued — Construction Fence
S00702791-S2-FN
12/23/2024
Filed — New Building
PROPOSED TEMPORARY CONSTRUCTION FENCE FOR SITE CLEARING AND THE CONSTRUCTION OF TWO NEW DETACHED RESIDENCES. THIS ALSO APPLIES TO 735 MAGUIRE AVENUE.
S00702791-S2
12/23/2024
Filed — New Building
PROPOSED TEMPORARY CONSTRUCTION FENCE FOR SITE CLEARING AND THE CONSTRUCTION OF TWO NEW DETACHED RESIDENCES. THIS ALSO APPLIES TO 735 MAGUIRE AVENUE.
S00702791-S1
03/25/2022
Filed — New Building
PROPOSED TEMPORARY CONSTRUCTION FENCE FOR SITE CLEARING AND THE CONSTRUCTION OF TWO NEW DETACHED RESIDENCES. THIS ALSO APPLIES TO 735 MAGUIRE AVENUE.
S00702791-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBLUE STAR GROUP LLC09/09/2025
DOB NOWPlumbingSigned-offR&M PIPING & HTG INC06/02/2025
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP02/13/2025
DOB NOWMechanical SystemsPermit IssuedBLUE STAR GROUP LLC02/10/2025
DOB NOWConstruction FenceSigned-offBLUE STAR GROUP LLC12/30/2024
1 project · most recent 03/05/2025
General Wiring
FiledStatusContractorScope
03/05/2025CompleteTRUE ELECTRIC CORP.General Wiring
1 project · most recent 09/10/2025
Concrete Wood
FiledStatusContractorScope
09/10/2025Signed-offBLUE STAR GROUP LLCConcrete, Wood
1 project · most recent 09/10/2025
Fence
FiledStatusContractorScope
09/10/2025Signed-offBLUE STAR GROUP LLCFence
1 project · most recent 09/10/2025
Earthwork
FiledStatusContractorScope
09/10/2025Signed-offBLUE STAR GROUP LLCEarthwork
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
02/19/2026Fail-Final CND-Occupancy InspectionFailView ↗
12/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
09/17/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/19/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/18/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/09/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
09/10/2025Fenestration areasanthony santoroenergy_progress
09/10/2025Concrete - Cast-In-Placeanthony santorospecial
09/10/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
09/10/2025Mechanical Systemsanthony santorospecial
09/10/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
09/10/2025Subgrade Inspectionsanthony santorospecial
09/10/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/10/2025Wood – Prefabricated I-Joistsanthony santorospecial
09/10/2025Energy Code Compliance Inspectionsanthony santoroprogress
09/10/2025Finalanthony santoroprogress
09/10/2025Fire-Resistance Rated Constructionanthony santoroprogress
09/10/2025Footing and Foundationanthony santoroprogress
09/10/2025Structural Wood Frameanthony santoroprogress
09/10/2025Air barrier — testing anthony santoroenergy_progress
09/10/2025Air barrier - visual inspectionanthony santoroenergy_progress
09/10/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
09/10/2025Interior lighting poweranthony santoroenergy_progress
09/10/2025Air barrier continuity plan testinganthony santoroenergy_progress
09/10/2025Lighting in dwelling unitsanthony santoroenergy_progress
09/10/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
09/10/2025Maintenance informationanthony santoroenergy_progress
09/10/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
09/10/2025Permanent certificateanthony santoroenergy_progress
09/10/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
09/10/2025Fenestration air leakageanthony santoroenergy_progress
Latest 25 of 31.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026S00702791-S1Request digital key ↗
08/19/2026S00702791-I1Request digital key ↗
08/19/2026S00702791-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
07/11/2025540214935Open ↗
05/10/2022540214935Open ↗
05/06/2022540214935Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
03/11/2022540214935Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00702791-I1Open ↗
08/13/2026S00702791-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00702791-P1Open ↗
08/13/2026S00702791-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00702791-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026S00702791-S1Open ↗
08/19/2026S00702791-I1Open ↗
08/19/2026S00702791-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/28/2026S00702791-P1Open ↗
09/28/2026S00702791-P1Open ↗
09/28/2026S00702791-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/28/2026S00702791-P1Open ↗
09/28/2026S00702791-P1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/11/2022540214935Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/11/2022540214935Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00702791-P1Open ↗
08/13/2026S00702791-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/19/2026S00702791-I1Open ↗
08/19/2026S00702791-P1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00702791-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00702791-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00702791-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026S00702791-I1Open ↗
08/13/2026S00702791-P1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
03/11/2022540214935Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00702791-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/11/2022540214935Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/11/2022540214935Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION2
07/11/2025540214935Open ↗
03/11/2022540214935Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00702791-P1Open ↗
08/13/2026S00702791-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00702791-P1Open ↗
08/13/2026S00702791-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026S00702791-I1Open ↗
08/19/2026S00702791-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00702791-I1Open ↗