← Back
One story retail building
MAURICE AVENUE
QUEENS · BIN 4623252
💬 Discuss this project
2021Year Built
1Stories
K1Building Class
M1-1Zoning
12,697 sfGross Floor Area
1Units
0 Open Violations
One story retail building · Owner of record: MAURICE AVENUE SHOPPES LLC · 14,320 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof12p · 10 filings · 20 docs
Floor 1Under Construction42p · 6 filings · 20 docs
3 jobs · most recent 04/13/2026
Ventilation Systems Heating and Air Conditioning Systems Heating Systems Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
04/13/2026Signed-offCOSMOPOLITAN INTERIORS INHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lennox model LGH120H4M 10 BTU · Rooftop Unit ×2
Ventilation
Accurex model XDGX-P112-H12-MF 2,490 CFM · Makeup Air ×2
11/10/2025Permit IssuedUS LEVIN GRP CORPHeating Systems
Heating
———Air Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Carrier 48HcEd08 7 tons · Condensing Unit ×1
Ventilation
Captiveaire D76 750 CFM ×1
DU12HFA 375 CFM · Kitchen Exhaust ×1
DU50HFA 1,000 CFM · Kitchen Exhaust ×1
Greenheck SP-80-VG 50 CFM · Exhaust Fan ×1
1 job · most recent 11/10/2025
Sprinkler System
FiledStatusContractorScope
11/10/2025Permit IssuedORBIT SPRINKLER CORPSprinkler System
4 jobs · most recent 04/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/13/2026Permit IssuedPHD SERVICES CORPGas, Water/Sanitary
11/10/2025Signed-offALTAIR PLUMBING AND HEATGas, Water/Sanitary
02/27/2025Signed-offALTAIR PLUMBING AND HEATWater/Sanitary
———Gas, Water/Sanitary
19 jobs · most recent 05/05/2026
General Wiring
FiledStatusContractorScope
05/05/2026Permit IssuedAP ELECTL SER & MAIN INCGeneral Wiring
06/04/2025CompleteALFO ELECTRIC CORPGeneral Wiring
07/25/2022CompleteALL AROUND ELECTRIC CORP.General Wiring
06/27/2022CompleteTRIZA ELECTRICAL CORPGeneral Wiring
06/23/2022CompleteV-MAR ELECTRIC LTD.General Wiring
05/03/2022CompleteJEM ELEC'L CONTR. CORPGeneral Wiring
01/25/2022CompleteEMPIRE STATE ELECTL CORP—
01/25/2022CompleteEMPIRE STATE ELECTL CORP—
01/19/2022CompleteS.A.L. ELECTRIC CO INC.General Wiring
12/16/2021CompleteJONG HYUN KIM—
12/16/2021CompleteJONG HYUN KIM—
11/29/2021CompleteATMOS ELECTRIC SVCE CORP—
11/29/2021CompleteATMOS ELECTRIC SVCE CORP—
11/23/2021CompleteJEM ELEC'L CONTR. CORPGeneral Wiring
08/19/2021CompleteSIGNS CAD CORP—
Building Lifecycle
All (300)Filed (72)Permit Issued (68)Signed Off (33)Violation (3)Inspection (34)Objection (60)Special Inspection (30)
09/08/2026
Permit issued — Sprinklers
Q01177599-S2-EW-SP
09/02/2026
Permit issued — Mechanical Systems
Q01177599-S3-MS
09/01/2026
Permit issued — General Construction
Q01177599-I1-GC
08/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/13/2026
Filed — Alteration
mechanical work for Atomic Wings. installation of new mechanical hood, ducts, exhaust fan as per plan. no change in use, egress or occupancy.
Q01211462-P6
04/01/2026
Filed — Alteration
mechanical work for Atomic Wings. installation of new mechanical hood, ducts, exhaust fan as per plan. no change in use, egress or occupancy.
Q01211462-P5
03/27/2026
Filed — Alteration
mechanical work for Atomic Wings. installation of new mechanical hood, ducts, exhaust fan as per plan. no change in use, egress or occupancy.
Q01211462-P4
03/16/2026
Permit issued — Plumbing
Q01211462-S1-PL
03/09/2026
Filed — Alteration
mechanical work for Atomic Wings. installation of new mechanical hood, ducts, exhaust fan as per plan. no change in use, egress or occupancy.
Q01211462-P3
02/19/2026
Signed off — Alteration
mechanical work for Atomic Wings. installation of new mechanical hood, ducts, exhaust fan as per plan. no change in use, egress or occupancy.
Q01211462-I1
12/19/2025
Filed — Alteration
mechanical work for Atomic Wings. installation of new mechanical hood, ducts, exhaust fan as per plan. no change in use, egress or occupancy.
Q01211462-P2
12/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
AKM RAHMAN
12/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
AKM RAHMAN
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
12/19/2025
Special inspection requirement — Maintenance information
AKM RAHMAN
12/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AKM RAHMAN
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
12/19/2025
Special inspection requirement — Final
AKM RAHMAN
12/19/2025
Special inspection requirement — Shutoff dampers
AKM RAHMAN
12/19/2025
Special inspection requirement — Duct leakage testing, insulation and design
AKM RAHMAN
12/19/2025
Special inspection requirement — Mechanical Systems
AKM RAHMAN
12/17/2025
Special inspection requirement — Maintenance information
AKM RAHMAN
12/17/2025
Special inspection requirement — Duct leakage testing, insulation and design
AKM RAHMAN
12/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AKM RAHMAN
12/17/2025
Special inspection requirement — Shutoff dampers
AKM RAHMAN
12/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
AKM RAHMAN
12/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
AKM RAHMAN
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
12/17/2025
Special inspection requirement — Mechanical Systems
AKM RAHMAN
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
12/17/2025
Special inspection requirement — Final
AKM RAHMAN
12/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/10/2025
Filed — Alteration
Installation of New Plumbing Connections as part of Interior Renovation of tenant space. No change in egress , zoning, use, or occupancy.
Q01177599-P1
11/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/18/2025
Permit issued — Plumbing
Q01177531-S1-PL
07/09/2025
Permit issued — General Construction
Q01177531-I1-GC
07/03/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
06/06/2025
Permit issued — Plumbing
Q01211462-S1-PL
06/04/2025
Permit issued — General Construction
Q01211462-I1-GC
05/21/2025
Filed — Alteration
mechanical work for Atomic Wings. installation of new mechanical hood, ducts, exhaust fan as per plan. no change in use, egress or occupancy.
Q01211462-P1
05/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/02/2025
Objection resolved — Addressed
04/21/2025
Filed — Alteration
mechanical work for Atomic Wings. installation of new mechanical hood, ducts, exhaust fan as per plan. no change in use, egress or occupancy.
Q01211462-S1
04/21/2025
Filed — Alteration
mechanical work for Atomic Wings. installation of new mechanical hood, ducts, exhaust fan as per plan. no change in use, egress or occupancy.
Q01211462-S2
04/17/2025
Filed — Alteration
mechanical work for Atomic Wings. installation of new mechanical hood, ducts, exhaust fan as per plan. no change in use, egress or occupancy.
Q01211462-I1
04/17/2025
Permit issued — General Construction
Q01177599-I1-GC
04/17/2025
Objection resolved — Addressed
04/16/2025
Special inspection requirement — Final
AKM RAHMAN
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
AKM RAHMAN
04/02/2025
Permit issued — Sprinklers
Q01177599-S2-EW-SP
03/26/2025
Permit issued — Plumbing
Q01177599-S1-PL
03/21/2025
Objection resolved — Addressed
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PTMA 5200 KINGS HIGHWAY22009/10/2026
PROSPECT CAPITAL RESTAURANTS507/08/2026
J CONSTRUCTION303/22/2026
THE J COMPAMNIES LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mark Montoya603/21/2026
W J PROFESSIONAL EXPEDITING1403/21/2026
ARCHETYPE CONSULTANTS2203/21/2026
A1 EXPEDITING SERVICE CORP.1903/21/2026
JKW ENGINEERING PC1803/21/2026
PEROTTO CONSULTING MANAGEMENT1203/21/2026
JP EXPEDITE603/21/2026
SPRING SCAFFOLDING LLC203/21/2026
NEW YORK SIGN CONSULTANTS603/21/2026
YOUN DESIGN CORP803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIGNS CADScaffold907/08/2026
MICHELLE KUO CORPGeneral Contractor707/08/2026
HTC CONSTRUCTION MANAGEMENTGeneral Contractor707/08/2026
CUSTOM COMMERCIAL CONSTRUCTIONGeneral Contractor707/08/2026
THE J CONSTRUCTION CO LLCGeneral Contractor607/08/2026
ALTAIR PLUMBING AND HEATPlumbing507/08/2026
PHD SERVICES CORPPlumbing506/28/2026
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
US LEVIN GRP CORPGeneral Contractor409/10/2026
MAUCERI SIGNScaffold307/08/2026
STAT FIRE SPRINKLER NYC CFire Protection307/08/2026
UPRIGHT FIRE PROTCTN LLCFire Protection207/08/2026
ORBIT SPRINKLER CORPFire Protection209/09/2026
METRO MECHANICAL GROUP INPlumbing207/08/2026
TRI STATE PLBG & HTG INCPlumbing207/08/2026
NEPTUNE SIGNS AWNINGSScaffold207/08/2026
PAUL SIGNSScaffold207/08/2026
NEW YORK CARRIER TRADINGGeneral Contractor203/21/2026
NEW YORK CONSTRUCTION ASSGeneral Contractor203/21/2026
JEM ELEC'L CONTR. CORPElectrical203/22/2026
UNITECH DESIGNScaffold107/08/2026
DMITRIY PORTNOVElectrical103/21/2026
EMPIRE STATE ELECTL CORPElectrical103/22/2026
XH&RC PLBG AND HTG INCFire Protection107/08/2026
BUILT NYG INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASR ENGINEERING PC8404212/19/2025
ECOPLUSDESIGN2887611/10/2025
SCO ENGINEERING PLLC9678102/24/2025
MJ ENGINEERING & DESIGN55461310/05/2023
CATALPA SPECIAL INSPECTIO2004408/25/2023
JKW ENGINEERING, P.C.1856308/25/2022
FLUSHING ENGINEERING SERV4373103/01/2022
KL INNOVATIVE DESIGN INC7225302/21/2022
INTEGRITY CONSULTING SERV666202/03/2022
MEP INSPECTIONS, INC1102201/04/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedORBIT SPRINKLER CORP09/08/2026
DOB NOWMechanical SystemsPermit IssuedUS LEVIN GRP CORP09/02/2026
DOB NOWGeneral ConstructionPermit IssuedUS LEVIN GRP CORP09/01/2026
DOB NOWPlumbingPermit IssuedPHD SERVICES CORP03/16/2026
DOB NOWPlumbingSigned-offALTAIR PLUMBING AND HEAT07/18/2025
DOB NOWGeneral ConstructionPermit IssuedUS LEVIN GRP CORP07/09/2025
DOB NOWPlumbingPermit IssuedPHD SERVICES CORP06/06/2025
DOB NOWGeneral ConstructionSigned-offCOSMOPOLITAN INTERIORS IN06/04/2025
DOB NOWGeneral ConstructionPermit IssuedUS LEVIN GRP CORP04/17/2025
DOB NOWSprinklersPermit IssuedORBIT SPRINKLER CORP04/02/2025
DOB NOWPlumbingSigned-offALTAIR PLUMBING AND HEAT03/26/2025
DOB NOWPlumbingSigned-offMETRO MECHANICAL GROUP IN01/31/2023
DOB NOWPlumbingSigned-offDW PLUMBING INC07/13/2022
DOB NOWPlumbingSigned-offHP SERVICES INC06/22/2022
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C04/13/2022
DOB NOWMechanical SystemsSigned-off18-15 REALTY LLC04/07/2022
DOB NOWGeneral ConstructionSigned-off18-15 REALTY LLC04/06/2022
DOB NOWMechanical SystemsSigned-offNEW YORK CARRIER TRADING03/14/2022
DOB NOWMechanical SystemsSigned-off18-15 REALTY LLC03/11/2022
DOB NOWPlumbingSigned-offDW PLUMBING INC03/10/2022
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C03/09/2022
DOB NOWSprinklersSigned-offH.J. FLOOD INC.02/01/2022
DOB NOWSignSigned-offPAUL SIGNS, INC01/13/2022
DOB NOWSignSigned-offPAUL SIGNS, INC01/13/2022
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC01/03/2022
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC12/30/2021
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC12/30/2021
DOB NOWGeneral ConstructionSigned-offHTC CONSTRUCTION MANAGEME12/15/2021
DOB NOWSignSigned-offUNITECH DESIGN INC11/24/2021
DOB NOWGeneral ConstructionSigned-offCUSTOM COMMERCIAL CONSTRU11/05/2021
DOB NOWSprinklersSigned-offH.J. FLOOD INC.11/05/2021
DOB NOWStructuralSigned-offCUSTOM COMMERCIAL CONSTRU11/05/2021
DOB NOWMechanical SystemsSigned-offCUSTOM COMMERCIAL CONSTRU11/05/2021
DOB NOWMechanical SystemsSigned-offTHE J CONSTRUCTION CO LLC11/04/2021
DOB NOWGeneral ConstructionSigned-offBUILT NYG INC10/26/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/19/2021
DOB NOWGeneral ConstructionSigned-off18-15 REALTY LLC10/19/2021
DOB NOWGeneral ConstructionSigned-offHTC CONSTRUCTION MANAGEME09/29/2021
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP09/10/2021
DOB NOWGeneral ConstructionSigned-off18-15 REALTY LLC09/03/2021
+ 14 more permits on file
▾Field Inspections (DOB CAP) — 34
DateTypeResultReport
08/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/21/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/28/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2022Pass-Final Sign Permit InspectionPassView ↗
03/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/07/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/15/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
Latest 25 of 34.
▾Special Inspection Requirements (DOB NOW) — 135
DateRequirementInspectorRole
12/19/2025Shutoff dampersAKM RAHMANenergy_progress
12/19/2025Maintenance informationAKM RAHMANenergy_progress
12/19/2025HVAC-R and service water heating system controlsAKM RAHMANenergy_progress
12/19/2025FinalAKM RAHMANprogress
12/19/2025Mechanical SystemsAKM RAHMANspecial
12/19/2025Energy Code Compliance InspectionsAKM RAHMANprogress
12/19/2025Fire-Resistant Penetrations and JointsAKM RAHMANspecial
12/19/2025HVAC-R and service water heating equipmentAKM RAHMANenergy_progress
12/19/2025Duct leakage testing, insulation and designAKM RAHMANenergy_progress
12/19/2025HVAC-R and service water piping design and insulationAKM RAHMANenergy_progress
12/17/2025Mechanical SystemsAKM RAHMANspecial
12/17/2025Shutoff dampersAKM RAHMANenergy_progress
12/17/2025Duct leakage testing, insulation and designAKM RAHMANenergy_progress
12/17/2025Energy Code Compliance InspectionsAKM RAHMANprogress
12/17/2025FinalAKM RAHMANprogress
12/17/2025HVAC-R and service water heating equipmentAKM RAHMANenergy_progress
12/17/2025HVAC-R and service water heating system controlsAKM RAHMANenergy_progress
12/17/2025Fire-Resistant Penetrations and JointsAKM RAHMANspecial
12/17/2025HVAC-R and service water piping design and insulationAKM RAHMANenergy_progress
12/17/2025Maintenance informationAKM RAHMANenergy_progress
04/16/2025Energy Code Compliance InspectionsAKM RAHMANprogress
04/16/2025FinalAKM RAHMANprogress
02/11/2025Sprinkler SystemsSeungchul Okspecial
02/06/2025Fire-Resistance Rated ConstructionSeungchul Okprogress
02/06/2025Fire-Resistance Rated ConstructionSeungchul Okprogress
Latest 25 of 135.
▾Documents — 388 on file (BIS + DOB NOW)
▸Plans & Drawings83
▸DOB NOWPlans/Sketch61
08/29/2026Q00602838-I1Request digital key ↗
08/29/2026Q00603623-I1Request digital key ↗
08/27/2026Q00478306-P3Request digital key ↗
Showing 3 of 61 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
08/26/2026Q00253942-P4Request digital key ↗
08/26/2026Q00253942-P3Request digital key ↗
08/26/2026Q00253942-P7Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
08/26/2026Q00253942-P5Request digital key ↗
08/26/2026Q00253942-P4Request digital key ↗
08/26/2026Q00253942-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sign3
08/27/2026Q00413631-I1Request digital key ↗
08/27/2026Q00413639-I1Request digital key ↗
08/27/2026Q00413665-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/27/2026Q00253982-P2Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/27/2026Q00551237-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00414057-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION16
06/24/2021420666461Open ↗
05/27/2021420666461Open ↗
05/03/2021420666461Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION5
04/27/2023420666461Open ↗
10/01/2021420666461Open ↗
12/23/2020420666461Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
11/04/2021420666461Open ↗
10/27/2021420666461Open ↗
10/26/2021420666461Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM3
07/06/2021420666461Open ↗
03/10/2021420666461Open ↗
11/09/2020420666461Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/09/2020420666461Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/09/2020420666461Open ↗
▸BISVERIFY TAX LOT1
09/28/2023420666461Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
11/09/2020420666461Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/13/2023420666461Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/09/2020420666461Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications173
▸DOB NOWDPL-1: Design Professional Seal & Signature74
08/27/2026Q00413639-I1Open ↗
08/27/2026Q00414057-I1Open ↗
08/27/2026Q00413665-I1Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWProgress Inspector Seal & Signature58
09/20/2026Q00478292-P1Open ↗
09/20/2026Q00478292-P1Open ↗
09/16/2026Q00574597-I1Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
09/24/2026Q00253942-P4Open ↗
09/20/2026Q00478292-P1Open ↗
09/02/2026Q00253942-P2Open ↗
Showing 3 of 37 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
11/27/2020420666461Open ↗
11/25/2020420666461Open ↗
11/25/2020420666461Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment5
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/16/2021420666461Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/16/2021420666461Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/11/2023420666461Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
11/09/2020420666461Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
01/13/2023420666461Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/09/2020420666461Open ↗
▸BISSTREET TREE CHECKLIST1
11/09/2020420666461Open ↗
▸BISSTREET TREE SIGNOFF1
09/27/2023420666461Open ↗
▸BISSTREET TREES SITE PLAN1
09/27/2023420666461Open ↗
▸DOB NOWStreet Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance23
▸DOB NOWEN2: As Built Energy Analysis.8
08/27/2026Q00608984-I1Open ↗
Showing 1 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/27/2020420666461Open ↗
11/25/2020420666461Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/16/2021420666461Open ↗
▸BISINTERIOR LIGHTING POWER1
12/16/2021420666461Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/16/2021420666461Open ↗
▸BISFENESTRATION AREAS1
12/16/2021420666461Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
12/16/2021420666461Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/09/2020420666461Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/16/2021420666461Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/13/2023420666461Open ↗
▸BIS* HVAC INSULATION AND SEALING1
12/16/2021420666461Open ↗
▸BISLIGHTING CONTROLS1
12/16/2021420666461Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
12/16/2021420666461Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/16/2021420666461Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/16/2021420666461Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY10
11/09/2020420666461Open ↗
11/09/2020420666461Open ↗
11/09/2020420666461Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
11/25/2020420666461Open ↗
11/25/2020420666461Open ↗
11/25/2020420666461Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/25/2020420666461Open ↗
11/09/2020420666461Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/16/2021420666461Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/16/2021420666461Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/16/2021420666461Open ↗
▸BISSOIL REPORT1
11/09/2020420666461Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/09/2020420666461Open ↗
▸BISSOIL PERC. TEST-INDIVID ON-SITE PRIVATE SEWAGE DISP.(SEPTIC)1
12/16/2021420666461Open ↗
▸BISDEEP FOUNDATIONS / PILES1
12/16/2021420666461Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/06/2023420666461Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/16/2021420666461Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
12/08/2021420666461Open ↗
▸Approvals, Objections & Sign-offs15
▸BISSCHEDULE A - OCCUPANCY / USE10
06/24/2021420666461Open ↗
05/03/2021420666461Open ↗
04/27/2021420666461Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/09/2020420666461Open ↗
11/09/2020420666461Open ↗
11/09/2020420666461Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE3
04/27/2023420666461Open ↗
10/01/2021420666461Open ↗
12/23/2020420666461Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION9
07/06/2021420666461Open ↗
03/10/2021420666461Open ↗
11/09/2020420666461Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM3
04/27/2023420666461Open ↗
10/01/2021420666461Open ↗
12/23/2020420666461Open ↗
▸BISEFILING COVER SHEET1
11/08/2019420666461Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents7
▸BISSHUTOFF DAMPERS1
12/16/2021420666461Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
12/16/2021420666461Open ↗
▸BISMAINTENANCE INFORMATION1
12/16/2021420666461Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/16/2021420666461Open ↗
▸BISPLOT DIAGRAM1
11/09/2020420666461Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type