← Back
Public elementary, junior or senior high
MILFORD DRIVE
STATEN ISLAND · BIN 5171567
💬 Discuss this project
2021Year Built
4Stories
W1Building Class
R3-2Zoning
101,934 sfGross Floor Area
1Units
5 Open Violations ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 69,324 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
General
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 6 docs
Floor 41 filing · 6 docs
Floor 31 filing · 6 docs
Floor 21 filing · 6 docs
Floor 11 filing · 6 docs
Mezzanine1 filing · 6 docs
Cellar1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DCAS409/13/2026
NYC SCHOOL CONSTRUCTION AUTHORITY403/22/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
MORGANTI GROUP403/22/2026
DEPARTMENT OF EDUCATION103/22/2026
SCHOOL CONSTRUCTION AUTHORITY2703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS KIM206/12/2026
PAUL PERDEK, PROF. ENG. PLLC106/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAD & D'APRILE INCGeneral Contractor303/21/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor207/08/2026
ARKADY KATSElectrical103/21/2026
MULTI-PHASE ELEC'L SVCSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244106/11/2026
MUNICIPAL TESTING LABORAT230106/08/2021
Building Lifecycle
All (28)Filed (3)Permit Issued (3)Signed Off (1)Violation (15)Inspection (4)Objection (2)
06/17/2026
Permit issued — General Construction
S01401319-S1-GC-CX
06/16/2026
Permit issued — Solar
S01401319-I1-SL
06/12/2026
Filed — Alteration
INSTALLATION OF SHALLOW CONCRETE FOUNDATIONS AND ALUMINUM CANOPY STRUCTURE LOCATED ON ACCESSORY OFF-SITE PARKING LOT OF EXISTING BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
S01401319-S1
06/11/2026
Filed — Alteration
INSTALLATION OF SHALLOW CONCRETE FOUNDATIONS AND ALUMINUM CANOPY STRUCTURE LOCATED ON ACCESSORY OFF-SITE PARKING LOT OF EXISTING BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
S01401319-I1
08/08/2025
Violation issued (FDNY_NOV, closed)
04/30/2025
Violation issued (ECB, closed)
Construction
02/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/03/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/14/2023
Violation issued (FDNY_ORDER, closed)
09/14/2023
Violation issued (FDNY_ORDER, closed)
09/10/2023
Violation issued (FDNY_NOV, closed)
08/03/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/16/2023
Violation issued (FDNY_NOV, closed)
05/03/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/08/2022
Signed off — Alteration
IS/HS 86R LLW# 105139: INSTALLATION OF SCAFFOLD INSIDE SHAFT AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
S00531913-I1
12/15/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/02/2021
Inspection — Pass-Final Scaffold Non-Directive 14
Pass
View inspection ↗
11/18/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/07/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Permit issued — Supported Scaffold
S00531913-I1-SF
08/18/2021
Violation issued (ECB, closed)
Construction
08/18/2021
Violation issued (ECB, closed)
Construction
08/18/2021
Violation issued (ECB, closed)
Construction
06/21/2021
Objection raised — Other
06/21/2021
Objection resolved — Addressed
06/08/2021
Filed — Alteration
IS/HS 86R LLW# 105139: INSTALLATION OF SCAFFOLD INSIDE SHAFT AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
S00531913-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBROOKLYN SOLARWORKS LLC06/17/2026
DOB NOWSolarPermit IssuedBROOKLYN SOLARWORKS LLC06/16/2026
DOB NOWSupported ScaffoldPermit IssuedRAD & D'APRILE INC09/15/2021
BIS—ISSUEDTHE MORGANTI GROUP, INC12/28/2023
BIS—ISSUEDTHE MORGANTI GROUP, INC03/21/2023
BIS—ISSUEDTHE MORGANTI GROUP, INC01/11/2023
BIS—ISSUEDTHE MORGANTI GROUP, INC11/04/2022
BISEQISSUEDTHE MORGANTI GROUP, INC07/12/2022
BISPLISSUEDFORSYTHE P&H CORP05/27/2022
BISPLISSUEDFORSYTHE P&H CORP05/26/2022
BISPLISSUEDFORSYTHE P&H CORP05/26/2022
BIS—RE-ISSUEDTHE MORGANTI GROUP, INC03/14/2022
BIS—RE-ISSUEDTHE MORGANTI GROUP, INC03/14/2022
BISOTISSUEDNYC SCHOOL CONSTRUCTION AUTHORIT02/22/2022
BISFSISSUEDJACK PICCINI, INC02/17/2022
BISOTISSUEDTHE MORGANTI GROUP, INC02/17/2022
BISOTISSUEDTHE MORGANTI GROUP, INC12/21/2021
BISOTISSUEDTHE MORGANTI GROUP, INC12/21/2021
BISOTISSUEDTHE MORGANTI GROUP, INC12/21/2021
BISOTISSUEDTHE MORGANTI GROUP, INC12/21/2021
BISOTISSUEDTHE MORGANTI GROUP, INC12/21/2021
BISOTISSUEDTHE MORGANTI GROUP, INC11/03/2021
BISEQISSUEDTHE MORGANTI GROUP, INC07/22/2021
BIS—ISSUEDTHE MORGANTI GROUP, INC03/23/2021
BIS—ISSUEDTHE MORGANTI GROUP, INC03/23/2021
BISOTISSUEDTHE MORGANTI GROUP, INC03/18/2021
BISOTISSUEDTHE MORGANTI GROUP, INC12/23/2020
BISOTISSUEDTHE MORGANTI GROUP, INC12/23/2020
BISOTISSUEDTHE MORGANTI GROUP, INC12/23/2020
BISOTISSUEDTHE MORGANTI GROUP, INC12/11/2020
BISOTISSUEDTHE MORGANTI GROUP, INC12/11/2020
BISOTISSUEDTHE MORGANTI GROUP, INC12/11/2020
BISEQISSUEDTHE MORGANTI GROUP, INC07/29/2020
BISOTISSUEDTHE MORGANTI GROUP, INC07/07/2020
BIS—ISSUEDTHE MORGANTI GROUP, INC07/07/2020
BISOTISSUEDTHE MORGANTI GROUP, INC07/07/2020
BISOTISSUEDTHE MORGANTI GROUP, INC07/07/2020
BIS—ISSUEDTHE MORGANTI GROUP, INC07/07/2020
BISPLISSUEDFORSYTHE P&H CORP06/12/2020
BISPLISSUEDFORSYTHE P&H CORP06/12/2020
+ 12 more permits on file
3 projects · most recent 07/28/2026
General Wiring
FiledStatusContractorScope
07/28/2026CompleteBROOKYLN SOLARWORKS, LLCGeneral Wiring
09/19/2022CompleteMULTI-PHASE ELEC'L SVCSGeneral Wiring
01/20/2020CompleteMULTI-PHASE ELEC'L SVCS1 meters, 1 new_meters
1 project · most recent 06/12/2026
FiledStatusContractorScope
06/12/2026Permit IssuedBROOKLYN SOLARWORKS LLC1 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/09/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/02/2021Pass-Final Scaffold Non-Directive 14PassView ↗
11/18/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Petrides SchoolEducationGround
Project S01401319 Alteration · Permit Entire · 06/11/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026S01401319-S1Request digital key ↗
08/16/2026S01401319-I1Request digital key ↗
08/15/2026S00531913-I1Request digital key ↗
▸Applications & Permits1
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/12/2022500875047Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026S01401319-I1Open ↗
08/16/2026S01401319-S1Open ↗
08/13/2026S00531913-I1Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
07/20/2023500875859Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026S00531913-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/16/2026S01401319-I1Open ↗
08/16/2026S01401319-S1Open ↗
08/13/2026S00531913-I1Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
03/03/2021500875047Open ↗
▸Other Documents2
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal1
08/13/2026S00531913-I1Open ↗
▸DOB NOWNYCSCA Exhibit 21
08/13/2026S00531913-I1Open ↗