← Back
Two family frame
NICHOLAS AVENUE
STATEN ISLAND · BIN 5175040
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
2,036 sfGross Floor Area
2Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Two family frame · 4,827 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
Architecture
Floor 211p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
130 ARNOLD2107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE706/05/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXIMUM CONTRACTING INCGeneral Contractor507/08/2026
KCM PLUMBING & HEATING COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738306/05/2023
RYAN DESIGN ARCHITECTURE7159306/05/2023
Building Lifecycle
All (63)Filed (7)Permit Issued (4)Signed Off (3)Violation (8)Inspection (7)Objection (4)Special Inspection (30)
08/29/2026
Violation issued (HPD, open)
A
05/07/2025
Violation issued (HPD, closed)
A
05/07/2025
Violation issued (HPD, closed)
A
05/07/2025
Violation issued (HPD, open)
B
05/07/2025
Violation issued (HPD, open)
B
05/07/2025
Violation issued (HPD, open)
B
05/07/2025
Violation issued (HPD, closed)
A
05/07/2025
Violation issued (HPD, open)
B
06/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2023
Filed — New Building
NEW BUILDING TWO FAMILY RESIDENCE
S00554351-P2
05/30/2023
Special inspection requirement — Insulation placement and R values
Daniel Ryan
05/30/2023
Special inspection requirement — Metering
Daniel Ryan
05/30/2023
Special inspection requirement — Electric vehicle service equipment requirements
Daniel Ryan
05/30/2023
Special inspection requirement — Permanent certificate
Daniel Ryan
05/30/2023
Special inspection requirement — Chimneys and vents
Daniel Ryan
05/30/2023
Special inspection requirement — Concrete - Cast-In-Place
Daniel Ryan
05/30/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Daniel Ryan
05/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
05/30/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
05/30/2023
Special inspection requirement — Subgrade Inspections
Daniel Ryan
05/30/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
05/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
05/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
05/30/2023
Special inspection requirement — Air barrier — testing
anthony santoro
05/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Daniel Ryan
05/30/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Ryan
05/30/2023
Special inspection requirement — Interior lighting power
Daniel Ryan
05/30/2023
Special inspection requirement — Air barrier - visual inspection
Daniel Ryan
05/30/2023
Special inspection requirement — Maintenance information
Daniel Ryan
05/30/2023
Special inspection requirement — Fenestration air leakage
Daniel Ryan
05/30/2023
Special inspection requirement — Fenestration areas
Daniel Ryan
04/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/23/2022
Objection raised — Scope
11/23/2022
Objection resolved — Addressed
11/18/2022
Filed — New Building
NEW BUILDING TWO FAMILY RESIDENCE
S00554351-P1
10/28/2022
Special inspection requirement — Fenestration areas
Daniel Ryan
10/28/2022
Special inspection requirement — Concrete - Cast-In-Place
Daniel Ryan
10/28/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Daniel Ryan
10/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
10/28/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
10/28/2022
Special inspection requirement — Subgrade Inspections
Daniel Ryan
10/28/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
10/28/2022
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
10/28/2022
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
09/22/2022
Signed off — Alteration
PLUMBING for new 2 family house
S00554367-I1
07/19/2022
Signed off — Alteration
TEMPORARY FENCE
S00554340-I1
06/24/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/14/2022
Signed off — Alteration
S00554345-I1
06/08/2022
Objection resolved — Addressed
06/06/2022
Objection raised — Scope
05/31/2022
Filed — Alteration
PLUMBING for new 2 family house
S00554367-P1
05/17/2022
Permit issued — Curb Cut
S00554345-I1-CC
03/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/10/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/03/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/27/2021
Permit issued — Plumbing
S00554367-I1-PL
11/24/2021
Permit issued — General Construction
S00554351-I1-GC
11/01/2021
Permit issued — Construction Fence
S00554340-I1-FN
07/16/2021
Filed — Alteration
S00554345-I1
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMAXIMUM CONTRACTING INC05/17/2022
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO12/27/2021
DOB NOWGeneral ConstructionPermit IssuedMAXIMUM CONTRACTING INC11/24/2021
DOB NOWConstruction FenceSigned-offMAXIMUM CONTRACTING INC11/01/2021
3 projects · most recent 09/27/2022
General Wiring
FiledStatusContractorScope
09/27/2022CompleteKWONG MING ELECTRIC INCGeneral Wiring
03/30/2022CompleteHIGH BEAM ELECTRIC CORP.General Wiring
12/02/2021CancelledRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/24/2022Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/10/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/03/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
05/30/2023Insulation placement and R valuesDaniel Ryanenergy_progress
05/30/2023MeteringDaniel Ryanenergy_progress
05/30/2023Electric vehicle service equipment requirementsDaniel Ryanenergy_progress
05/30/2023Permanent certificateDaniel Ryanenergy_progress
05/30/2023Chimneys and ventsDaniel Ryanspecial
05/30/2023Concrete - Cast-In-PlaceDaniel Ryanspecial
05/30/2023Exterior Insulation and Finish Systems (EIFS)Daniel Ryanspecial
05/30/2023Fire-Resistant Penetrations and JointsDaniel Ryanspecial
05/30/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
05/30/2023Subgrade InspectionsDaniel Ryanspecial
05/30/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/30/2023Energy Code Compliance InspectionsDaniel Ryanprogress
05/30/2023Fire-Resistance Rated ConstructionDaniel Ryanprogress
05/30/2023Air barrier — testing anthony santoroenergy_progress
05/30/2023HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
05/30/2023Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
05/30/2023Interior lighting powerDaniel Ryanenergy_progress
05/30/2023Air barrier - visual inspectionDaniel Ryanenergy_progress
05/30/2023Maintenance informationDaniel Ryanenergy_progress
05/30/2023Fenestration air leakageDaniel Ryanenergy_progress
05/30/2023Fenestration areasDaniel Ryanenergy_progress
10/28/2022Fenestration areasDaniel Ryanenergy_progress
10/28/2022Concrete - Cast-In-PlaceDaniel Ryanspecial
10/28/2022Exterior Insulation and Finish Systems (EIFS)Daniel Ryanspecial
10/28/2022Fire-Resistant Penetrations and JointsDaniel Ryanspecial
Latest 25 of 46.
▾Documents — 104 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026S00554340-I1Request digital key ↗
08/25/2026S00554345-I1Request digital key ↗
08/24/2026S00554367-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
07/06/2021540203046Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/02/2021540203046Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00554351-P2Open ↗
08/13/2026S00554351-I1Open ↗
08/13/2026S00554351-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00554351-I1Open ↗
08/13/2026S00554351-P1Open ↗
08/13/2026S00554351-P2Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/02/2021540203046Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00554351-I1Open ↗
▸Seals & Professional Certifications55
▸DOB NOWProgress Inspector Seal & Signature32
08/25/2026S00554351-P1Open ↗
08/25/2026S00554351-P1Open ↗
08/25/2026S00554351-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
08/25/2026S00554351-P1Open ↗
08/25/2026S00554351-P1Open ↗
08/25/2026S00554351-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026S00554345-I1Open ↗
08/24/2026S00554367-I1Open ↗
08/24/2026S00554367-P1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/02/2021540203046Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/02/2021540203046Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00554351-P1Open ↗
08/13/2026S00554351-P2Open ↗
08/13/2026S00554351-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00554351-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00554351-I1Open ↗
08/13/2026S00554351-P1Open ↗
08/13/2026S00554351-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00554351-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00554351-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00554351-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00554351-I1Open ↗
08/13/2026S00554367-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT3
08/13/2026S00554351-I1Open ↗
08/13/2026S00554351-P2Open ↗
08/13/2026S00554351-P1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
07/02/2021540203046Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/02/2021540203046Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00554351-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00554351-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/06/2021540203046Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/02/2021540203046Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/13/2026S00554351-P2Open ↗
08/13/2026S00554351-P1Open ↗
08/13/2026S00554351-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00554351-I1Open ↗
08/13/2026S00554351-P1Open ↗
08/13/2026S00554351-P2Open ↗
▸DOB NOWSURVEY: INITIAL3
08/13/2026S00554351-P2Open ↗
08/13/2026S00554351-P1Open ↗
08/13/2026S00554351-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/02/2021540203046Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00554351-I1Open ↗