← Back
Unlicensed parking lot
NORTH 9 STREET
BROOKLYN · BIN 3430039
💬 Discuss this project
0Year Built
—Stories
G7Building Class
R6BZoning
0 sfGross Floor Area
0Units
Unlicensed parking lot · Owner of record: GEO STAR ASSOCIATES LLC · 2,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof3p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
152 154 BEDFORD AVE1609/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITYSCAPE ENGINEERING, PLLC403/24/2026
DAMORE STUDIO312/11/2025
COLLADO ENGINEERING112/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1403/21/2026
Building Lifecycle
All (113)Filed (8)Objection (75)Special Inspection (30)
09/21/2026
Objection resolved — Resolved
09/15/2026
Objection raised — Fire_Protection
07/16/2026
Objection resolved — Addressed
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Other
05/22/2026
Objection resolved — Resolved
05/21/2026
Objection resolved — Resolved
04/24/2026
Objection resolved — Resolved
04/01/2026
Objection raised — Other
03/30/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Resolved
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Resolved
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/24/2026
Filed — New Building
PROPOSE 4-STORY MIXED-USE BUILDING AS PER PLAN. OBTAIN NEW C OF O.
B01153900-S7
03/12/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Open
03/05/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
02/17/2026
Objection resolved — Resolved
02/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/03/2026
Objection raised — Other
02/03/2026
Objection raised — Other
02/03/2026
Objection raised — Other
02/03/2026
Objection raised — Other
02/03/2026
Objection raised — Other
02/03/2026
Objection raised — Other
01/27/2026
Objection raised — Structural
01/27/2026
Objection raised — Structural
01/27/2026
Objection raised — Structural
01/27/2026
Objection raised — Admin
01/27/2026
Objection raised — Admin
01/27/2026
Objection raised — Structural
01/27/2026
Objection raised — Structural
01/27/2026
Objection raised — Admin
01/27/2026
Objection raised — Structural
01/27/2026
Objection raised — Structural
01/27/2026
Objection raised — Structural
01/27/2026
Objection raised — Admin
01/14/2026
Filed — New Building
PROPOSE 4-STORY MIXED-USE BUILDING AS PER PLAN. OBTAIN NEW C OF O.
B01153900-S2
01/14/2026
Filed — New Building
PROPOSE 4-STORY MIXED-USE BUILDING AS PER PLAN. OBTAIN NEW C OF O.
B01153900-S1
01/14/2026
Filed — New Building
PROPOSE 4-STORY MIXED-USE BUILDING AS PER PLAN. OBTAIN NEW C OF O.
B01153900-S3
01/13/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
01/13/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
01/13/2026
Special inspection requirement — Post-installed Anchors
01/13/2026
Special inspection requirement — Post-installed Anchors
Latest 60 of 113 events.
Nothing on file for this building.
1 project · most recent 03/24/2026
Sprinkler System
FiledStatusContractorScope
03/24/2026——Sprinkler System
1 project · most recent 03/24/2026
FiledStatusContractorScope
03/24/2026———
1 project · most recent 03/24/2026
Steel Concrete Masonry
FiledStatusContractorScope
03/24/2026——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
02/12/2026HVAC-R and service water heating equipment—energy_progress
02/12/2026HVAC-R and service water piping design and insulation—energy_progress
01/13/2026Subsurface Conditions – Fill Placement & In-Place Density—special
01/13/2026Subsurface Investigations (Borings/Test Pits)—special
01/13/2026Post-installed Anchors—special
01/13/2026Post-installed Anchors—special
01/13/2026Structural Steel - High Strength Bolting—special
01/13/2026Excavations - Sheeting, Shoring, and Bracing—special
01/13/2026Underpinning—special
12/10/2025Maintenance information—energy_progress
12/10/2025HVAC-R and service water heating system controls—energy_progress
12/05/2025Fire-Resistant Penetrations and Joints—special
12/05/2025Energy Code Compliance Inspections—progress
12/05/2025Fire-Resistant Penetrations and Joints—special
12/05/2025Post-installed Anchors—special
12/05/2025Post-installed Anchors—special
12/04/2025Sprinkler Systems—special
09/15/2025Concrete - Cast-In-Place—special
09/15/2025Concrete - Cast-In-Place—special
09/15/2025Structural Steel - Welding—special
09/15/2025Subgrade Inspections—special
09/15/2025Masonry—special
09/15/2025Structural Steel - Details—special
09/15/2025Final—progress
09/15/2025Subgrade Inspections—special
Latest 25 of 37.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/19/2026B01153900-S7Request digital key ↗
08/19/2026B01153900-S4Request digital key ↗
08/15/2026B01153900-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
01/29/2026340920043Open ↗
09/19/2025340920043Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026B01153900-I1Open ↗
08/13/2026B01153900-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01153900-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01153900-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/15/2026B01153900-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/19/2026B01153900-S2Open ↗
08/19/2026B01153900-S1Open ↗
08/19/2026B01153900-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/19/2025340920043Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/19/2025340920043Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026B01153900-I1Open ↗
08/13/2026B01153900-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/15/2026B01153900-I1Open ↗
08/13/2026B01153900-I1Open ↗
▸BISSTREET TREE CHECKLIST1
09/19/2025340920043Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026B01153900-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026B01153900-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01153900-S2Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01153900-S2Open ↗
▸Filing & Intake Forms2
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/19/2025340920043Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/19/2025340920043Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026B01153900-I1Open ↗
08/13/2026B01153900-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/19/2025340920043Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01153900-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B01153900-I1Open ↗