← Back
One family attached or semi-detached
OLYMPIA BOULEVARD
STATEN ISLAND · BIN 5175776
💬 Discuss this project
2024Year Built
2Stories
A5Building Class
R3-1Zoning
1,222 sfGross Floor Area
1Units
One family attached or semi-detached · Owner of record: LANGERE VENTURE LLC · 1,980 sf lot · 0.62 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Floor 36p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC511/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROGERS CALVANICO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STOUT HOMES INCGeneral Contractor804/09/2026
DUO PLUMBING & HTG CORP.Plumbing107/08/2026
R&M PIPING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472211/21/2025
A TECH ENGINEERING NYC, P6738205/09/2025
Building Lifecycle
All (59)Filed (5)Permit Issued (8)Signed Off (3)Inspection (11)Objection (2)Special Inspection (30)
04/27/2026
Signed off — New Building
Plumbing application filed in conjunction with new building application for new residence.
S00968950-I1
04/02/2026
Signed off — New Building
Plumbing application filed in conjunction with new building application for new residence.
S00968950-S1
03/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2026
Special inspection requirement — Deep Foundation Elements
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
02/23/2026
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Final
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Lowest Floor Elevation
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
02/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Maintenance information
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Metering
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Protection of exposed foundation insulation
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
02/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
02/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
02/23/2026
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
01/14/2026
Signed off — New Building
Plumbing application filed in conjunction with new building application for new residence.
S00968950-S4
01/09/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/21/2025
Filed — New Building
Plumbing application filed in conjunction with new building application for new residence.
S00968950-P2
10/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2025
Permit issued — Curb Cut
S00968950-S4-CC
06/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2025
Filed — New Building
Plumbing application filed in conjunction with new building application for new residence.
S00968950-P1
05/07/2025
Filed — New Building
Plumbing application filed in conjunction with new building application for new residence.
S00968950-S4
05/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/27/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/21/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/27/2025
Permit issued — Plumbing
S20590556-S1-PL
11/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/26/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/21/2024
Permit issued — Plumbing
S00968950-S1-PL
04/04/2024
Permit issued — Structural
S00968950-I1-MS
04/04/2024
Permit issued — Structural
S00968950-I1-EA
04/03/2024
Permit issued — Foundation
S00968950-I1-GC
04/03/2024
Permit issued — Earth Work
S00968950-I1-FO
04/03/2024
Permit issued — Structural
S00968950-I1-ST
03/20/2024
Filed — New Building
Plumbing application filed in conjunction with new building application for new residence.
S00968950-S1
02/29/2024
Objection resolved — Addressed
01/08/2024
Objection raised — Scope
12/12/2023
Filed — New Building
Plumbing application filed in conjunction with new building application for new residence.
S00968950-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSTOUT HOMES INC10/09/2025
DOB NOWPlumbingSigned-offR&M PIPING & HTG INC01/27/2025
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.06/21/2024
DOB NOWStructuralSigned-offSTOUT HOMES INC04/04/2024
DOB NOWStructuralSigned-offSTOUT HOMES INC04/04/2024
DOB NOWFoundationPermit IssuedSTOUT HOMES INC04/03/2024
DOB NOWEarth WorkSigned-offSTOUT HOMES INC04/03/2024
DOB NOWStructuralSigned-offSTOUT HOMES INC04/03/2024
1 project · most recent 11/21/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/21/2025Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 11/12/2024
General Wiring
FiledStatusContractorScope
11/12/2024CompleteLMS ELECTRICAL CORPGeneral Wiring
1 project · most recent 11/21/2025
Wood
FiledStatusContractorScope
11/21/2025Signed-offSTOUT HOMES INCWood
1 project · most recent 11/21/2025
Earthwork
FiledStatusContractorScope
11/21/2025Signed-offSTOUT HOMES INCEarthwork
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
10/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/26/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
02/23/2026Permanent certificateStanislav Pilipenkoenergy_progress
02/23/2026Deep Foundation ElementsStanislav Pilipenkospecial
02/23/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Stanislav Pilipenkospecial
02/23/2026Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
02/23/2026Concrete - Cast-In-PlaceStanislav Pilipenkospecial
02/23/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
02/23/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/23/2026Mechanical SystemsStanislav Pilipenkospecial
02/23/2026FinalStanislav Pilipenkoprogress
02/23/2026Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
02/23/2026Lowest Floor ElevationStanislav Pilipenkoprogress
02/23/2026Energy Code Compliance InspectionsStanislav Pilipenkoprogress
02/23/2026Structural Wood FrameStanislav Pilipenkoprogress
02/23/2026Footing and FoundationStanislav Pilipenkoprogress
02/23/2026HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
02/23/2026Maintenance informationStanislav Pilipenkoenergy_progress
02/23/2026Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
02/23/2026Fenestration areasStanislav Pilipenkoenergy_progress
02/23/2026MeteringStanislav Pilipenkoenergy_progress
02/23/2026Protection of exposed foundation insulationStanislav Pilipenkoenergy_progress
02/23/2026Insulation placement and R valuesStanislav Pilipenkoenergy_progress
02/23/2026Interior lighting powerStanislav Pilipenkoenergy_progress
02/23/2026Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
02/23/2026Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
02/23/2026Air barrier — testing Stanislav Pilipenkoenergy_progress
Latest 25 of 61.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/19/2026S00968950-S1Request digital key ↗
08/19/2026S00968950-P2Request digital key ↗
08/19/2026S00968950-S4Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00968950-P2Open ↗
08/13/2026S00968950-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00968950-P2Open ↗
08/13/2026S00968950-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00968950-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWSpecial Inspector Seal & Signature9
08/28/2026S00968950-I1Open ↗
08/28/2026S00968950-I1Open ↗
08/28/2026S00968950-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026S00968950-P2Open ↗
08/19/2026S00968950-P1Open ↗
08/19/2026S00968950-S4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026S00968950-I1Open ↗
08/28/2026S00968950-I1Open ↗
08/25/2026S00968950-P2Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00968950-I1Open ↗
08/13/2026S00968950-P2Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00968950-P2Open ↗
08/13/2026S00968950-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00968950-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00968950-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00968950-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026S00968950-P2Open ↗
08/13/2026S00968950-I1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026S00968950-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00968950-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S00968950-I1Open ↗
▸Other Documents9
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/19/2026S00968950-I1Open ↗
08/13/2026S00968950-I1Open ↗
08/13/2026S00968950-P2Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00968950-P2Open ↗
08/13/2026S00968950-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026S00968950-P2Open ↗
08/19/2026S00968950-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00968950-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026S00968950-I1Open ↗