← Back
Zoned commercial or Manhattan residential
OTSEGO STREET
BROOKLYN · BIN 3429963
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R6Zoning
0 sfGross Floor Area
0Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: RED HOOK BUILDING A OWNER LLC · 31,000 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscape
Roof2p · 1 filing · 20 docs
Bulkhead4p · 2 filings · 20 docs
Floor 83p · 2 filings · 20 docs
Floor 73p · 2 filings · 20 docs
Floor 65p · 2 filings · 20 docs
Floor 54p · 2 filings · 20 docs
Floor 44p · 2 filings · 20 docs
Floor 35p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EXPRESS BUILDERS JB3009/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THORNTON TOMASETTI406/01/2026
JZN ENGINEERING, PC.405/20/2026
A&D ENGINEERING, PLLC403/19/2025
DESIGN BUILD ENGINEERING PLLC103/05/2025
AUFGANG ARCHITECTS112/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXPRESS BUILDERS JB, INCGeneral Contractor507/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681106/01/2026
Building Lifecycle
All (68)Filed (14)Permit Issued (5)Inspection (2)Objection (17)Special Inspection (30)
07/08/2026
Permit issued — Earth Work
B01243772-S1-EA
06/08/2026
Objection resolved — Addressed
06/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SOORJBALLY HARILALL
06/01/2026
Filed — New Building
subsequent document to do sprinkler/standpipe work in conjunction with NB application
B01142698-P2
06/01/2026
Objection resolved — Addressed
05/28/2026
Objection raised — Other
05/27/2026
Special inspection requirement — Final
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Footing and Foundation
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
05/27/2026
Special inspection requirement — Masonry
SOORJBALLY HARILALL
05/26/2026
Objection raised — Other
05/20/2026
Filed — Alteration
SOE to do soil cutting, benching and trench box shoring during the performance of the in site solidification program proposed.
B01243772-P2
05/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SOORJBALLY HARILALL
05/08/2026
Permit issued — Support of Excavation
B01243772-I1-SE
05/05/2026
Filed — Alteration
SOE to do soil cutting, benching and trench box shoring during the performance of the in site solidification program proposed.
B01243772-S1
04/23/2026
Filed — New Building
subsequent document to do sprinkler/standpipe work in conjunction with NB application
B01142698-P1
04/22/2026
Permit issued — Support of Excavation
B01243772-I1-SE
04/22/2026
Permit issued — Construction Fence
B01186890-I1-FN
04/17/2026
Special inspection requirement — Masonry
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Final
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Footing and Foundation
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Final
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Deep Foundation Elements
04/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
07/30/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/17/2025
Objection resolved — Addressed
06/30/2025
Objection raised — Other
06/20/2025
Filed — Alteration
SOE to do soil cutting, benching and trench box shoring during the performance of the in site solidification program proposed.
B01243772-I1
06/16/2025
Objection raised — Other
06/09/2025
Filed — New Building
subsequent document to do sprinkler/standpipe work in conjunction with NB application
B01142698-S7
06/04/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/03/2025
Objection resolved — Addressed
04/01/2025
Permit issued — Construction Fence
B01186890-I1-FN
03/24/2025
Objection raised — Admin
03/24/2025
Objection raised — Energy
03/19/2025
Filed — New Building
subsequent document to do sprinkler/standpipe work in conjunction with NB application
B01142698-S4
03/19/2025
Filed — New Building
subsequent document to do sprinkler/standpipe work in conjunction with NB application
B01142698-S5
03/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2025
Filed — New Building
subsequent document to do sprinkler/standpipe work in conjunction with NB application
B01142698-S6
03/18/2025
Filed — Alteration
Alteration application to do Temporary Standpipe work in conjunction with NB application
B01179104-I1
03/17/2025
Objection resolved — Addressed
03/12/2025
Objection raised — Other
03/05/2025
Filed — Alteration
temp. Construction fence
B01186890-I1
02/24/2025
Objection raised — Other
02/24/2025
Objection raised — Admin
02/18/2025
Filed — New Building
subsequent document to do sprinkler/standpipe work in conjunction with NB application
B01142698-S1
02/18/2025
Filed — New Building
subsequent document to do sprinkler/standpipe work in conjunction with NB application
B01142698-S2
02/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedEXPRESS BUILDERS JB, INC07/08/2026
DOB NOWSupport of ExcavationPermit IssuedEXPRESS BUILDERS JB, INC05/08/2026
DOB NOWSupport of ExcavationPermit IssuedEXPRESS BUILDERS JB, INC04/22/2026
DOB NOWConstruction FencePermit IssuedEXPRESS BUILDERS JB, INC04/22/2026
DOB NOWConstruction FencePermit IssuedEXPRESS BUILDERS JB, INC04/01/2025
1 project · most recent 06/01/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/01/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Amana PTH153J41 14,400 BTU · Ptac ×185
PH123J30 11,600 BTU · Ptac ×68
PTH073J21 7,000 BTU · Ptac ×61
Mitsubishi Electric PMUY-P35NKMU39(-BS) 3 tons · Vrf Outdoor ×1
PuHy-EP192TNU-A(-BS) 16 tons · Vrf Outdoor ×1
PuHy-EP72TNU-A(-BS) 6 tons · Vrf Outdoor ×1
Pumy-EP168TNU-A(-BS) 14 tons · Vrf Outdoor ×1
Pumy-P36NKMU3(-BS) 3 tons · Vrf Outdoor ×1
pmuy-p48nkmu3(-BS) 4 tons · Vrf Outdoor ×1
Ventilation
Mitsubishi Electric U-ERV-COIL-1800 1,620 CFM ×1
U-ERV-COIL-600 560 CFM ×1
1 project · most recent 03/18/2025
FiledStatusContractorScope
03/18/2025——2 outlets
1 project · most recent 06/01/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/01/2026——Gas, Storm, Water/Sanitary
2 projects · most recent 06/01/2026
Concrete
FiledStatusContractorScope
06/01/2026——Concrete
05/20/2026Permit IssuedEXPRESS BUILDERS JB, INC2 scope_items
1 project · most recent 03/05/2025
Fence
FiledStatusContractorScope
03/05/2025Permit IssuedEXPRESS BUILDERS JB, INCFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
06/05/2026Excavations - Sheeting, Shoring, and BracingSOORJBALLY HARILALLspecial
05/27/2026FinalSOORJBALLY HARILALLprogress
05/27/2026Structural Steel - WeldingSOORJBALLY HARILALLspecial
05/27/2026Structural Steel - High Strength BoltingSOORJBALLY HARILALLspecial
05/27/2026Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
05/27/2026Footing and FoundationSOORJBALLY HARILALLprogress
05/27/2026Structural Steel - DetailsSOORJBALLY HARILALLspecial
05/27/2026Post-installed AnchorsSOORJBALLY HARILALLspecial
05/27/2026MasonrySOORJBALLY HARILALLspecial
05/13/2026Excavations - Sheeting, Shoring, and BracingSOORJBALLY HARILALLspecial
04/17/2026MasonrySOORJBALLY HARILALLspecial
04/17/2026Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
04/17/2026FinalSOORJBALLY HARILALLprogress
04/17/2026Footing and FoundationSOORJBALLY HARILALLprogress
04/17/2026FinalSOORJBALLY HARILALLprogress
04/17/2026Structural Steel - WeldingSOORJBALLY HARILALLspecial
04/17/2026Deep Foundation Elements—special
04/17/2026Structural Steel - High Strength BoltingSOORJBALLY HARILALLspecial
04/17/2026Structural Steel - DetailsSOORJBALLY HARILALLspecial
04/17/2026Post-installed AnchorsSOORJBALLY HARILALLspecial
06/04/2025Excavations - Sheeting, Shoring, and Bracing—special
02/12/2025HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
02/12/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
02/12/2025Post-installed AnchorsSOORJBALLY HARILALLspecial
02/12/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
Latest 25 of 51.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/22/2026B01186890-I1Request digital key ↗
08/22/2026B01179104-I1Request digital key ↗
08/17/2026B01142698-S4Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
10/29/2025340916156Open ↗
10/29/2025340916156Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/28/2025340916156Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/17/2026B01142698-S2Open ↗
08/17/2026B01142698-S1Open ↗
08/17/2026B01142698-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/27/2026B01243772-I1Open ↗
08/23/2026B01243772-P2Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/28/2025340916156Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/28/2025340916156Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/31/2026B01243772-S1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREES SITE PLAN1
10/29/2025340916156Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/27/2025340916156Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
02/28/2025340916156Open ↗
▸BISADDITIONAL INFORMATION1
10/29/2025340916156Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/17/2026B01142698-I1Open ↗
▸DOB NOWFlood Plan Emergency Temporary Flood Shields1
08/17/2026B01142698-I1Open ↗