Three families
PARKINSON AVENUE
STATEN ISLAND · BIN 5164959
💬 Discuss this project
2022Year Built
3Stories
C0Building Class
R3-2Zoning
3,001 sfGross Floor Area
3Units
Three families · Owner of record: CAJ PROPERTY MANAGEMENT LLC · 5,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivil
Floor 38p · 3 filings · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAJ PROPERTY MANAGEMENT LLC103/22/2026
GRASMERE HOLDING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SCAGLIONE ARCHITECTS809/06/2023
A TECH ENGINEERING NYC, PLLC.205/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALKA CONTRACTING INCGeneral Contractor2407/08/2026
FINE MECHANICAL CORPPlumbing407/08/2026
JESNA CONSTRUCTION MANAGGeneral Contractor307/08/2026
MERCURY FIRE SUPP INCFire Protection207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
NEW AGE ELEC'L CONTRG INCElectrical103/21/2026
NY CODE CONSULTING INCElectrical103/21/2026
ANTHONY SCAGLIONEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROGERS CALVANICO GROUP PL1324409/06/2023
A TECH ENGINEERING NYC, P6738205/21/2021
Building Lifecycle
All (86)Filed (10)Permit Issued (23)Signed Off (6)Inspection (15)Objection (2)Special Inspection (30)
02/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/27/2023
Signed off — Alteration
S00497795-I1
09/19/2023
Signed off — Alteration
Install new plumbing and gas fired fixtures for new three (3) family home.
S00497797-I1
09/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/13/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/11/2023
Signed off — Alteration
S00497818-I1
09/09/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/07/2023
Special inspection requirement — Air barrier — testing
Richard Dailey
09/07/2023
Special inspection requirement — Metering
Richard Dailey
09/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Richard Dailey
09/07/2023
Special inspection requirement — Fenestration air leakage
Richard Dailey
09/07/2023
Special inspection requirement — Fenestration areas
Richard Dailey
09/07/2023
Special inspection requirement — Insulation placement and R values
Richard Dailey
09/07/2023
Special inspection requirement — Lighting in dwelling units
Richard Dailey
09/07/2023
Special inspection requirement — Concrete - Cast-In-Place
Richard Dailey
09/07/2023
Special inspection requirement — Subgrade Inspections
Richard Dailey
09/07/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
09/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Dailey
09/07/2023
Special inspection requirement — Masonry
Richard Dailey
09/07/2023
Special inspection requirement — Wood – Prefabricated I-Joists
Richard Dailey
09/07/2023
Special inspection requirement — Structural Steel - Details
Richard Dailey
09/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Richard Dailey
09/07/2023
Special inspection requirement — Footing and Foundation
Richard Dailey
09/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
Richard Dailey
09/07/2023
Special inspection requirement — Structural Wood Frame
Richard Dailey
09/07/2023
Special inspection requirement — Final
Richard Dailey
09/07/2023
Special inspection requirement — Air barrier - visual inspection
Richard Dailey
09/07/2023
Special inspection requirement — Permanent certificate
Richard Dailey
09/06/2023
Filed — New Building
construct three(3) story masonry - three (3) family fully detached building with four (4) on-site parking spaceS
S00500703-P1
09/05/2023
Special inspection requirement — Permanent certificate
Richard Dailey
09/05/2023
Special inspection requirement — Concrete - Cast-In-Place
Richard Dailey
09/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Dailey
09/05/2023
Special inspection requirement — Masonry
Richard Dailey
09/05/2023
Special inspection requirement — Structural Steel - Details
Richard Dailey
09/05/2023
Special inspection requirement — Subgrade Inspections
Richard Dailey
09/05/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
09/05/2023
Special inspection requirement — Wood – Prefabricated I-Joists
Richard Dailey
09/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Richard Dailey
08/17/2023
Signed off — Alteration
INSTALL 8'-0" HIGH CHAIN LINK CONSTRUCTION FENCE AROUND PERIMETER OF PROPERTY IN CONJUNCTION WITH NB APPLICATION # S00500703-I1
S00648620-I1
08/16/2023
Signed off — Alteration
Application filed to erect an 8.0 foot high chain link construction fence around perimeter of property.
S00485685-I1
08/16/2023
Permit issued — Construction Fence
S00648620-I1-FN
08/15/2023
Permit issued — Structural
S00500703-I1-GC-CX
08/15/2023
Permit issued — Curb Cut
S00497795-I1-CC
08/15/2023
Permit issued — Curb Cut
S00497818-I1-CC
08/10/2023
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00508400-I1
03/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/13/2023
Filed — Alteration
Install new plumbing and gas fired fixtures for new three (3) family home.
S00497797-P1
03/03/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/02/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/28/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/27/2023
Permit issued — Plumbing
S00508400-I1-EW-SP
02/25/2023
Permit issued — Plumbing
S00508400-I1-PL
02/24/2023
Permit issued — Plumbing
S20750873-I1-PL
02/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2022
Permit issued — Structural
S00500703-I1-GC-CX
11/21/2022
Permit issued — Construction Fence
S00485685-I1-FN
07/13/2022
Filed — Alteration
S00497795-I1
07/13/2022
Filed — Alteration
S00497818-I1
07/07/2022
Permit issued — General Construction
S00500703-I1-GC-CX
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offALKA CONTRACTING INC08/16/2023
DOB NOWStructuralPermit IssuedALKA CONTRACTING INC08/15/2023
DOB NOWCurb CutSigned-offALKA CONTRACTING INC08/15/2023
DOB NOWCurb CutSigned-offALKA CONTRACTING INC08/15/2023
DOB NOWPlumbingSigned-offMERCURY FIRE SUPP INC02/27/2023
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP02/25/2023
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP02/24/2023
DOB NOWStructuralPermit IssuedALKA CONTRACTING INC11/21/2022
DOB NOWConstruction FenceSigned-offALKA CONTRACTING INC11/21/2022
DOB NOWGeneral ConstructionPermit IssuedALKA CONTRACTING INC07/07/2022
DOB NOWConstruction FenceSigned-offALKA CONTRACTING INC07/07/2022
DOB NOWSprinklersSigned-offFINE MECHANICAL CORP05/23/2022
DOB NOWSprinklersSigned-offMERCURY FIRE SUPP INC05/19/2022
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP02/24/2022
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC02/09/2022
DOB NOWGeneral ConstructionPermit IssuedALKA CONTRACTING INC02/01/2022
DOB NOWStructuralPermit IssuedALKA CONTRACTING INC01/28/2022
DOB NOWFoundationPermit IssuedALKA CONTRACTING INC01/19/2022
DOB NOWStructuralPermit IssuedALKA CONTRACTING INC01/16/2022
DOB NOWGeneral ConstructionPermit IssuedALKA CONTRACTING INC01/12/2022
DOB NOWStructuralPermit IssuedALKA CONTRACTING INC12/15/2021
DOB NOWConstruction FenceSigned-offJESNA CONSTRUCTION MANAG10/29/2021
DOB NOWConstruction FenceSigned-offJESNA CONSTRUCTION MANAG03/30/2021
1 project · most recent 09/21/2022
General Wiring
FiledStatusContractorScope
09/21/2022CompleteTESTA ELECTRIC CO., INCGeneral Wiring
1 project · most recent 09/06/2023
Masonry
FiledStatusContractorScope
09/06/2023Permit IssuedALKA CONTRACTING INCMasonry
1 project · most recent 09/06/2023
Earthwork
FiledStatusContractorScope
09/06/2023Permit IssuedALKA CONTRACTING INCEarthwork
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
02/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/13/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
09/09/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
03/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/02/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/16/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/14/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
09/07/2023Air barrier — testing Richard Daileyenergy_progress
09/07/2023MeteringRichard Daileyenergy_progress
09/07/2023Fenestration and door U-factor and product ratingsRichard Daileyenergy_progress
09/07/2023Fenestration air leakageRichard Daileyenergy_progress
09/07/2023Fenestration areasRichard Daileyenergy_progress
09/07/2023Insulation placement and R valuesRichard Daileyenergy_progress
09/07/2023Lighting in dwelling unitsRichard Daileyenergy_progress
09/07/2023Concrete - Cast-In-PlaceRichard Daileyspecial
09/07/2023Subgrade InspectionsRichard Daileyspecial
09/07/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/07/2023Fire-Resistant Penetrations and JointsRichard Daileyspecial
09/07/2023MasonryRichard Daileyspecial
09/07/2023Wood – Prefabricated I-JoistsRichard Daileyspecial
09/07/2023Structural Steel - DetailsRichard Daileyspecial
09/07/2023Energy Code Compliance InspectionsRichard Daileyprogress
09/07/2023Footing and FoundationRichard Daileyprogress
09/07/2023Fire-Resistance Rated ConstructionRichard Daileyprogress
09/07/2023Structural Wood FrameRichard Daileyprogress
09/07/2023FinalRichard Daileyprogress
09/07/2023Air barrier - visual inspectionRichard Daileyenergy_progress
09/07/2023Permanent certificateRichard Daileyenergy_progress
09/05/2023Permanent certificateRichard Daileyenergy_progress
09/05/2023Concrete - Cast-In-PlaceRichard Daileyspecial
09/05/2023Fire-Resistant Penetrations and JointsRichard Daileyspecial
09/05/2023MasonryRichard Daileyspecial
Latest 25 of 50.
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026S00485685-I1Request digital key ↗
08/25/2026S00508400-P1Request digital key ↗
08/25/2026S00508400-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
02/11/2021520214429Open ↗
02/27/2015520212243Open ↗
12/01/2014520214429Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
03/09/2021520214429Open ↗
01/16/2015520214429Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
12/01/2014520214429Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026S00500703-I1Open ↗
08/13/2026S00500703-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00500703-I1Open ↗
08/13/2026S00500703-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00500703-I1Open ↗
08/13/2026S00500703-P1Open ↗
▸BISZONING DIAGRAM1
04/01/2015520212243Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
02/27/2015520212243Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00500703-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature14
09/29/2026S00500703-I1Open ↗
09/29/2026S00500703-I1Open ↗
09/29/2026S00500703-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/29/2026S00500703-I1Open ↗
09/29/2026S00500703-I1Open ↗
09/29/2026S00500703-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026S00485685-I1Open ↗
08/25/2026S00508400-P1Open ↗
08/25/2026S00508400-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/27/2015520212243Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/27/2015520212243Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00500703-P1Open ↗
08/13/2026S00500703-I1Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/27/2015520212243Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
02/27/2015520212243Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00500703-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist2
08/13/2026S00500703-I1Open ↗
08/13/2026S00500703-P1Open ↗
▸BISSTREET TREE CHECKLIST1
02/27/2015520212243Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00500703-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00500703-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00500703-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00497797-I1Open ↗
08/13/2026S00500703-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/01/2015520212243Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT2
08/13/2026S00500703-I1Open ↗
08/13/2026S00500703-P1Open ↗
▸BISSoils - Investigations (Borings/Test Pits) - 2008 CODE1
02/27/2015520212243Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/16/2015520214429Open ↗
▸BISSoil Report1
02/27/2015520212243Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00500703-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00500703-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
04/01/2015520212243Open ↗
12/01/2014520214429Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
02/27/2015520212243Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/16/2015520214429Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026S00500703-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026S00500703-I1Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
03/09/2021520214429Open ↗
04/01/2015520212243Open ↗
12/01/2014520214429Open ↗
▸BISEFILING COVER SHEET2
02/27/2015520212243Open ↗
12/01/2014520214429Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial2
08/13/2026S00500703-P1Open ↗
08/13/2026S00500703-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00500703-I1Open ↗
08/13/2026S00500703-P1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
12/23/2014520214429Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/27/2015520212243Open ↗
▸BISPLOT DIAGRAM1
02/27/2015520212243Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
03/09/2021520214429Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00500703-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026S00500703-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00500703-I1Open ↗