| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/30/2026 | Permit Issued | GILBANE BUILDING COMPANY | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric 2x PUHY-EP120TSNU-A1 240,000 BTU · Vrf Outdoor ×1 I MXZ-SM48NAMHZ2-U1 48,000 BTU · Heat Pump Outdoor ×1 MXZ-SM48NAMHZ2-U1 3 48,000 BTU · Heat Pump Outdoor ×1 PUHY-EP120TSNU-A1 120,000 BTU · Vrf Outdoor ×1 RN-006-8-0-E619-000 1,100 CFM · Fan Coil Indoor ×3 RN-018-8-0-H619-000 3,700 CFM · Fan Coil Indoor ×3 Heat / Cool Mitsubishi Electric PLFY-EP18NEMU-E1R1 20,000 BTU · Vrf Indoor ×18 PLFY-EP30NEMU-ER1 34,000 BTU · Vrf Indoor ×10 PUHY-EP120TSNU-A1 135,000 BTU · Vrf Outdoor ×6 MXZ-SM48NAMHZ2-U1 48,000 BTU · Heat Pump Outdoor ×4 PEFY-P36NMAU-E4 40,000 BTU · Vrf Indoor ×2 PLFY-EP15NEMU-ER1 17,000 BTU · Vrf Indoor ×2 PVFY-P18NAMU-E1 20,000 BTU · Vrf Indoor ×2 PVFY-P24NAMU-E1 27,000 BTU · Vrf Indoor ×2 PVFY-P30NAMU-E1 34,000 BTU · Vrf Indoor ×2 Heating N/A n/a 87 kW · Electric Heater ×64 Ventilation N/A n/a 1,390 CFM ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/30/2026 | Signed-off | A & F FIRE PROTECTION CO | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/04/2026 | — | — | Water/Sanitary |
| 05/28/2026 | — | — | Storm |
| 04/30/2026 | Signed-off | TRISTATE PLBG SVCS CORP | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | Permit Issued | LIPPOLIS ELECTRIC, INC. | General Wiring |
| 05/03/2023 | Complete | LIPPOLIS ELECTRIC, INC. | 1 meters |
| 05/12/2022 | Cancelled | LOWY & DONNATH INC. | — |
| 05/12/2021 | Complete | P & M ELECT'L CONTR. CORP | General Wiring |
| 04/07/2020 | Complete | E-J ELEC. INSTALLATION CO | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/30/2026 | Permit Issued | GILBANE BUILDING COMPANY | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/30/2026 | Permit Issued | GILBANE BUILDING COMPANY | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/30/2026 | Permit Issued | GILBANE BUILDING COMPANY | Protection and Mechanical Methods |
| Owner | Filings | Most Recent |
|---|---|---|
| DEPARTMENT OF DESIGN CONSTRUCTION | 1 | 09/26/2026 |
| GILBANE | 1 | 03/22/2026 |
| OXFORD PROPERTIES GROUP | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| LORING CONSULTING ENGINEERS, INC. | 1 | 08/04/2026 |
| URBAN INTEGRATIONS | 3 | 07/21/2026 |
| MFS CONSULTING ENGINEERS & SURVEYOR | 5 | 05/28/2026 |
| OVE ARUP & PARTNERS PC | 9 | 04/30/2026 |
| MARVEL ARCHITECTS | 15 | 04/22/2026 |
| AECOM | 1 | 04/03/2026 |
| ARUP | 2 | 11/20/2025 |
| HOWARD I SHAPIRO & ASSOCIATES | 6 | 08/26/2025 |
| CONSULTING ENGINEER | 3 | 06/20/2025 |
| EXDEM ENGINEERING SERVICES | 1 | 05/27/2025 |
| BRAND ACCESS SOLUTIONS | 5 | 11/01/2024 |
| PLAN B ENGINEERING | 5 | 11/03/2023 |
| DESIGN BUILD ENGINEERING PLLC | 1 | 10/28/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| CONVERSANO ASSOCIATES, INC. | 52 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 22 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 12 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 03/21/2026 |
| CITISCAPE CONSULTING LTD | 6 | 03/21/2026 |
| ARCHI PRO GROUP | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SAFWAY ATLANTIC, LLC | General Contractor | 31 | 07/08/2026 |
| GILBANE BUILDING COMPANY | General Contractor | 18 | 07/08/2026 |
| ENERGY FENCING INC | General Contractor | 15 | 06/28/2026 |
| TITAN INDUSTRIAL SVC CORP | General Contractor | 8 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 4 | 07/08/2026 |
| PACE PLUMBING CORP | Fire Protection | 4 | 07/08/2026 |
| A & F FIRE PROTECTION CO | Fire Protection | 2 | 07/08/2026 |
| DARCON CONSTRUCTION INC | General Contractor | 2 | 04/09/2026 |
| WINICK PRODUCTIONS, LLC | General Contractor | 2 | 07/08/2026 |
| CIVETTA MECHANICAL, LLC | Plumbing | 2 | 07/08/2026 |
| GLASS ARMOR OF NEW YORK I | General Contractor | 1 | 09/26/2026 |
| A.F.I. GLASS & ARCHITECTU | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| UNIVERSAL TESTING AND INS | 400 | 31 | 04/30/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | GLASS ARMOR OF NEW YORK I | 09/25/2026 |
| DOB NOW | General Construction | Permit Issued | COLGATE ENTERPRISE CORP | 08/17/2026 |
| DOB NOW | General Construction | Permit Issued | GILBANE BUILDING COMPANY | 06/23/2026 |
| DOB NOW | Plumbing | Signed-off | TRISTATE PLBG SVCS CORP | 04/01/2026 |
| DOB NOW | Construction Fence | Signed-off | ENERGY FENCING INC | 10/06/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SAFWAY ATLANTIC, LLC | 09/29/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SAFWAY ATLANTIC, LLC | 09/25/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | A.F.I. GLASS & ARCHITECTU | 09/03/2025 |
| DOB NOW | General Construction | Signed-off | WINICK PRODUCTIONS, LLC | 08/21/2025 |
| DOB NOW | General Construction | Permit Issued | GILBANE BUILDING COMPANY | 06/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | GILBANE BUILDING COMPANY | 06/23/2025 |
| DOB NOW | Earth Work | Signed-off | GILBANE BUILDING COMPANY | 06/23/2025 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED AUTO SPR.CO.,INC | 06/04/2025 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED AUTO SPR.CO.,INC | 06/04/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SAFWAY ATLANTIC, LLC | 06/03/2025 |
| DOB NOW | Plumbing | Signed-off | TRISTATE PLBG SVCS CORP | 04/01/2025 |
| DOB NOW | Structural | Signed-off | GILBANE BUILDING COMPANY | 02/13/2025 |
| DOB NOW | Plumbing | Signed-off | CIVETTA MECHANICAL, LLC | 02/07/2025 |
| DOB NOW | Construction Fence | Signed-off | ENERGY FENCING INC | 01/15/2025 |
| DOB NOW | Structural | Signed-off | DARCON CONSTRUCTION INC | 01/09/2025 |
| DOB NOW | Sprinklers | Signed-off | MANENGEERING BUREAU, INC | 12/19/2024 |
| DOB NOW | Sprinklers | Signed-off | MANENGEERING BUREAU, INC | 12/17/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SAFWAY ATLANTIC, LLC | 11/01/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SAFWAY ATLANTIC, LLC | 10/02/2024 |
| DOB NOW | Supported Scaffold | Signed-off | SAFWAY ATLANTIC, LLC | 10/02/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SAFWAY ATLANTIC, LLC | 09/27/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SAFWAY ATLANTIC, LLC | 09/27/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SAFWAY ATLANTIC, LLC | 09/27/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SAFWAY ATLANTIC, LLC | 09/26/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | SAFWAY ATLANTIC, LLC | 09/26/2024 |
| DOB NOW | Supported Scaffold | Signed-off | SAFWAY ATLANTIC, LLC | 09/25/2024 |
| DOB NOW | General Construction | Permit Issued | GILBANE BUILDING COMPANY | 09/13/2024 |
| DOB NOW | Mechanical Systems | Signed-off | GILBANE BUILDING COMPANY | 09/13/2024 |
| DOB NOW | General Construction | Signed-off | GILBANE BUILDING COMPANY | 09/12/2024 |
| DOB NOW | Standpipe | Signed-off | MANENGEERING BUREAU, INC | 09/10/2024 |
| DOB NOW | Standpipe | Signed-off | MANENGEERING BUREAU, INC | 09/10/2024 |
| DOB NOW | Construction Fence | Signed-off | ENERGY FENCING INC | 09/09/2024 |
| DOB NOW | General Construction | Signed-off | WINICK PRODUCTIONS, LLC | 08/14/2024 |
| DOB NOW | Plumbing | Signed-off | TRISTATE PLBG SVCS CORP | 04/01/2024 |
| DOB NOW | Construction Fence | Signed-off | ENERGY FENCING INC | 03/14/2024 |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/06/2026 | Pass CND-Occupancy Inspection | Pass | View ↗ |
| 03/11/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/13/2026 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 02/13/2026 | Certified StandPipe - SD - Fire StandPipe - SD - Roughing | Certified | View ↗ |
| 02/13/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 04/03/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 01/03/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/18/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/22/2024 | Pass-Final PL - Underground | Pass | View ↗ |
| 05/20/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 05/09/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 04/05/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/02/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/27/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 11/06/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/03/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/27/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/27/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/08/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/29/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/20/2026 | Final | DANNY TRUJILLO | progress |
| 05/01/2026 | Post-installed Anchors | NELSON LOPEZ | special |
| 05/01/2026 | Fire-Resistant Penetrations and Joints | NELSON LOPEZ | special |
| 04/30/2026 | Mastic and Intumescent Fire-resistant Coatings | NELSON LOPEZ | special |
| 04/30/2026 | Masonry | NELSON LOPEZ | special |
| 04/30/2026 | Excavations - Sheeting, Shoring, and Bracing | NELSON LOPEZ | special |
| 04/30/2026 | Structural Stability – Alterations of existing buildings | NELSON LOPEZ | special |
| 04/30/2026 | Wall Panels, Curtain Walls, and Veneers | NELSON LOPEZ | special |
| 04/30/2026 | Subgrade Inspections | NELSON LOPEZ | special |
| 04/30/2026 | Fire-Resistant Penetrations and Joints | NELSON LOPEZ | special |
| 04/30/2026 | Fire-Resistance Rated Construction | NELSON LOPEZ | progress |
| 04/30/2026 | Concrete - Cast-In-Place | NELSON LOPEZ | special |
| 04/30/2026 | Public Assembly Emergency Lighting | NELSON LOPEZ | progress |
| 04/30/2026 | Sprayed fire-resistant materials | NELSON LOPEZ | special |
| 04/30/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | NELSON LOPEZ | special |
| 04/10/2026 | Public Assembly Emergency Lighting | NELSON LOPEZ | progress |
| 04/06/2026 | Sprayed fire-resistant materials | NELSON LOPEZ | special |
| 04/06/2026 | Fire-Resistant Penetrations and Joints | NELSON LOPEZ | special |
| 04/06/2026 | Mechanical Systems | NELSON LOPEZ | special |
| 04/06/2026 | Post-installed Anchors | NELSON LOPEZ | special |
| 04/06/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 04/06/2026 | Final | NELSON LOPEZ | progress |
| 04/06/2026 | Post-installed Anchors | NELSON LOPEZ | special |
| 04/06/2026 | Fire-Resistant Penetrations and Joints | NELSON LOPEZ | special |