← Back
Two family brick
PINSON STREET
QUEENS · BIN 4624497
💬 Discuss this project
2024Year Built
2Stories
B1Building Class
R3XZoning
2,640 sfGross Floor Area
2Units
Two family brick · Owner of record: TP CHAN REAL PROPERTY LLC · 4,400 sf lot · 0.6 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralFire Protection
Floor 212p · 2 filings · 20 docs
Floor 113p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKY HOME GROUP2007/08/2026
GREEN HOME HOLDING INC103/22/2026
GERALD CALIENDO ARCHITECTS103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2025$1.0M—PINSON DEVELOPMENT NY INC. → TP CHAN REAL PROPERTY LLC$382/sf building
02/27/2023$190K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS608/13/2024
SIDERIS KEFALAS ENGINEERS PC212/19/2023
RAS PE CONSULTING ENGINEERS409/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.603/21/2026
GERALD J CALIENDO R A A I A603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IMPACT BUILDERS CORPGeneral Contractor907/08/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
RECORD GROUP INCGeneral Contractor107/08/2026
W.R. PLBG AND HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415408/13/2024
WORLD DESIGN ARCHITECTURE9323404/20/2023
Building Lifecycle
All (105)Filed (12)Permit Issued (7)Signed Off (6)Inspection (10)Objection (40)Special Inspection (30)
10/22/2024
Signed off — New Building
PROPOSED SHARED CURB CUT IN CONJUNCTION WITH NB FILING #Q08023699-I1. TOTAL WIDTH INCLUDING SPLAYS IS 18'-0".
Q08023699-S1
10/16/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/30/2024
Signed off — Alteration
Herewith filing for plumbing systems and for hydraulically calculated sprinkler system (with less than 30 heads) for a proposed 3-Story, 2-Family building. Filed in conjunction with NB# Q08023699.
Q00809674-I1
09/27/2024
Signed off — New Building
PROPOSED SHARED CURB CUT IN CONJUNCTION WITH NB FILING #Q08023699-I1. TOTAL WIDTH INCLUDING SPLAYS IS 18'-0".
Q08023699-S4
09/24/2024
Signed off — New Building
PROPOSED SHARED CURB CUT IN CONJUNCTION WITH NB FILING #Q08023699-I1. TOTAL WIDTH INCLUDING SPLAYS IS 18'-0".
Q08023699-S3
09/24/2024
Signed off — New Building
PROPOSED SHARED CURB CUT IN CONJUNCTION WITH NB FILING #Q08023699-I1. TOTAL WIDTH INCLUDING SPLAYS IS 18'-0".
Q08023699-S5
09/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/18/2024
Signed off — New Building
PROPOSED SHARED CURB CUT IN CONJUNCTION WITH NB FILING #Q08023699-I1. TOTAL WIDTH INCLUDING SPLAYS IS 18'-0".
Q08023699-S2
09/18/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/27/2024
Objection resolved — Addressed
08/22/2024
Objection raised — Scope
08/13/2024
Filed — New Building
PROPOSED SHARED CURB CUT IN CONJUNCTION WITH NB FILING #Q08023699-I1. TOTAL WIDTH INCLUDING SPLAYS IS 18'-0".
Q08023699-P4
04/26/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/12/2024
Permit issued — Curb Cut
Q08023699-S1-CC
01/08/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/08/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/27/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
William Alicea
12/27/2023
Special inspection requirement — Sprinkler Systems
William Alicea
12/27/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
William Alicea
12/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
JEFFREY BELL
12/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
12/27/2023
Special inspection requirement — Maintenance information
JEFFREY BELL
12/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
JEFFREY BELL
12/19/2023
Filed — Alteration
Herewith filing for plumbing systems and for hydraulically calculated sprinkler system (with less than 30 heads) for a proposed 3-Story, 2-Family building. Filed in conjunction with NB# Q08023699.
Q00809674-P1
12/19/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DOYUN KIM
12/19/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
DOYUN KIM
12/19/2023
Special inspection requirement — Sprinkler Systems
DOYUN KIM
12/18/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
DOYUN KIM
12/18/2023
Special inspection requirement — Masonry
DOYUN KIM
12/18/2023
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
DOYUN KIM
12/18/2023
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
12/18/2023
Special inspection requirement — Lowest Floor Elevation
DOYUN KIM
12/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
12/18/2023
Special inspection requirement — Protection of exposed foundation insulation
DOYUN KIM
12/18/2023
Special inspection requirement — Electric vehicle service equipment requirements
DOYUN KIM
12/18/2023
Special inspection requirement — Metering
DOYUN KIM
12/18/2023
Special inspection requirement — Fenestration air leakage
DOYUN KIM
12/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
12/18/2023
Special inspection requirement — Interior lighting power
DOYUN KIM
12/18/2023
Special inspection requirement — Insulation placement and R values
DOYUN KIM
12/18/2023
Special inspection requirement — Air barrier — testing
DOYUN KIM
12/18/2023
Special inspection requirement — Air barrier - visual inspection
DOYUN KIM
12/18/2023
Special inspection requirement — Maintenance information
DOYUN KIM
12/18/2023
Special inspection requirement — Fenestration areas
DOYUN KIM
12/18/2023
Special inspection requirement — Permanent certificate
DOYUN KIM
12/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
12/08/2023
Filed — New Building
PROPOSED SHARED CURB CUT IN CONJUNCTION WITH NB FILING #Q08023699-I1. TOTAL WIDTH INCLUDING SPLAYS IS 18'-0".
Q08023699-P3
11/09/2023
Permit issued — Plumbing
Q00809674-I1-PL
09/28/2023
Permit issued — General Construction
Q08023699-I1-GC
09/11/2023
Filed — New Building
PROPOSED SHARED CURB CUT IN CONJUNCTION WITH NB FILING #Q08023699-I1. TOTAL WIDTH INCLUDING SPLAYS IS 18'-0".
Q08023699-P2
09/11/2023
Special inspection requirement — Concrete - Cast-In-Place
William Alicea
05/17/2023
Permit issued — Foundation
Q08023699-S4-FO-EA
05/17/2023
Permit issued — Structural
Q08023699-S5-ST
05/17/2023
Permit issued — Support of Excavation
Q08023699-S3-SE
05/10/2023
Objection resolved — Addressed
04/25/2023
Objection raised — Other
04/20/2023
Filed — New Building
PROPOSED SHARED CURB CUT IN CONJUNCTION WITH NB FILING #Q08023699-I1. TOTAL WIDTH INCLUDING SPLAYS IS 18'-0".
Q08023699-S4
04/20/2023
Filed — New Building
PROPOSED SHARED CURB CUT IN CONJUNCTION WITH NB FILING #Q08023699-I1. TOTAL WIDTH INCLUDING SPLAYS IS 18'-0".
Q08023699-S3
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offIMPACT BUILDERS CORP02/12/2024
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP11/09/2023
DOB NOWGeneral ConstructionPermit IssuedRECORD GROUP INC09/28/2023
DOB NOWFoundationSigned-offIMPACT BUILDERS CORP05/17/2023
DOB NOWStructuralSigned-offIMPACT BUILDERS CORP05/17/2023
DOB NOWSupport of ExcavationSigned-offIMPACT BUILDERS CORP05/17/2023
DOB NOWConstruction FenceSigned-offIMPACT BUILDERS CORP03/17/2023
1 project · most recent 11/09/2023
General Wiring
FiledStatusContractorScope
11/09/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 08/13/2024
Wood
FiledStatusContractorScope
08/13/2024Signed-offIMPACT BUILDERS CORPWood
1 project · most recent 08/13/2024
Fence
FiledStatusContractorScope
08/13/2024Signed-offIMPACT BUILDERS CORPFence
1 project · most recent 08/13/2024
Earthwork
FiledStatusContractorScope
08/13/2024Signed-offIMPACT BUILDERS CORPEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/16/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/18/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
04/26/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/08/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/08/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
12/27/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWilliam Aliceaspecial
12/27/2023Sprinkler SystemsWilliam Aliceaspecial
12/27/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWilliam Aliceaspecial
12/27/2023HVAC-R and service water heating system controlsJEFFREY BELLenergy_progress
12/27/2023HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
12/27/2023Maintenance informationJEFFREY BELLenergy_progress
12/27/2023HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
12/19/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDOYUN KIMspecial
12/19/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesDOYUN KIMspecial
12/19/2023Sprinkler SystemsDOYUN KIMspecial
12/18/2023Exterior Insulation and Finish Systems (EIFS)DOYUN KIMspecial
12/18/2023MasonryDOYUN KIMspecial
12/18/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)DOYUN KIMspecial
12/18/2023Energy Code Compliance InspectionsDOYUN KIMprogress
12/18/2023Lowest Floor ElevationDOYUN KIMprogress
12/18/2023Fire-Resistance Rated ConstructionDOYUN KIMprogress
12/18/2023Protection of exposed foundation insulationDOYUN KIMenergy_progress
12/18/2023Electric vehicle service equipment requirementsDOYUN KIMenergy_progress
12/18/2023MeteringDOYUN KIMenergy_progress
12/18/2023Fenestration air leakageDOYUN KIMenergy_progress
12/18/2023Fenestration and door U-factor and product ratingsDOYUN KIMenergy_progress
12/18/2023Interior lighting powerDOYUN KIMenergy_progress
12/18/2023Insulation placement and R valuesDOYUN KIMenergy_progress
12/18/2023Air barrier — testing DOYUN KIMenergy_progress
12/18/2023Air barrier - visual inspectionDOYUN KIMenergy_progress
Latest 25 of 46.
▾Documents — 125 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/25/2026Q00809674-P1Request digital key ↗
08/25/2026Q00809674-I1Request digital key ↗
08/24/2026Q08023699-P3Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits6
▸BISBPP-5 - Authorization to the Department of Transportation2
10/23/2024440775225Open ↗
04/05/2023440775225Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
04/05/2023440775225Open ↗
04/05/2023440775225Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/05/2023440775225Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
10/23/2024440775225Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWRestrictive Declaration/Easement 14
08/24/2026Q08023699-P3Open ↗
08/14/2026Q08023699-I1Open ↗
08/13/2026Q08023699-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/24/2026Q08023699-P3Open ↗
08/14/2026Q08023699-I1Open ↗
08/13/2026Q08023699-P4Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/24/2026Q08023699-P3Open ↗
08/14/2026Q08023699-I1Open ↗
08/13/2026Q08023699-P4Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q08023699-I1Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature20
09/25/2026Q08023699-S4Open ↗
08/31/2026Q08023699-P4Open ↗
08/31/2026Q08023699-P4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/25/2026Q08023699-S4Open ↗
09/25/2026Q08023699-S4Open ↗
09/25/2026Q08023699-S4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/25/2026Q00809674-P1Open ↗
08/25/2026Q00809674-I1Open ↗
08/24/2026Q08023699-P2Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/05/2023440775225Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/05/2023440775225Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/24/2026Q08023699-P3Open ↗
08/14/2026Q08023699-I1Open ↗
08/13/2026Q08023699-P4Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/24/2026Q08023699-P3Open ↗
08/15/2026Q08023699-P4Open ↗
08/14/2026Q08023699-I1Open ↗
▸BISSTREET TREE CHECKLIST1
04/18/2023440775225Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026Q08023699-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/14/2026Q08023699-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/14/2026Q08023699-I1Open ↗
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT6
08/24/2026Q08023699-P3Open ↗
08/14/2026Q08023699-I1Open ↗
08/13/2026Q08023699-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q08023699-S3Open ↗
08/13/2026Q08023699-S4Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q08023699-S4Open ↗
08/13/2026Q08023699-S3Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/23/2024440775225Open ↗
▸BISDOB RECORD FOR PROPOSED CC APPROVAL1
04/18/2023440775225Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
04/05/2023440775225Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
10/23/2024440775225Open ↗
▸Filing & Intake Forms2
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/05/2023440775225Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/05/2023440775225Open ↗
▸Other Documents20
▸BISBPP - SUPPORTING DOCUMENTATION5
10/23/2024440775225Open ↗
10/23/2024440775225Open ↗
10/23/2024440775225Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial3
08/24/2026Q08023699-P3Open ↗
08/14/2026Q08023699-I1Open ↗
08/13/2026Q08023699-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/24/2026Q08023699-P3Open ↗
08/14/2026Q08023699-I1Open ↗
08/13/2026Q08023699-P4Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026Q08023699-P3Open ↗
08/15/2026Q08023699-P4Open ↗
08/14/2026Q08023699-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q08023699-S3Open ↗
08/13/2026Q08023699-S4Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP1
04/05/2023440775225Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
04/18/2023440775225Open ↗
▸DOB NOWFinal Survey1
08/14/2026Q08023699-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/14/2026Q08023699-I1Open ↗