← Back
Gas or electric utility
PORTER AVENUE
BROOKLYN · BIN 3338243
💬 Discuss this project
0Year Built
—Stories
U2Building Class
M3-1Zoning
0 sfGross Floor Area
0Units
16 Open Violations 14 unresolved · 2 paperwork only ▸FDNY Report ↗
Gas or electric utility · Owner of record: BROOKLYN UNION GAS COMPANY · 5,137,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof6p · 2 filings · 20 docs
Floor 1Under Construction7p · 4 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NATIONAL GRID2807/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1103/21/2026
CONSTRUCTION PERMIT SERVICES403/21/2026
BARNWELL CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MATCO SERVICE CORPGeneral Contractor304/09/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor207/08/2026
CROSS CHECK MECH. CORPPlumbing207/08/2026
DEANGELO, MATTIAElectrical103/21/2026
BANCKER CONSTRUCTION CORPGeneral Contractor104/09/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OLA CONSULTING ENGINEERS,1955411/06/2025
CROSSCHECK INSPECTION SER544203/26/2024
OBAID MIAN849110/11/2019
Building Lifecycle
All (75)Filed (12)Permit Issued (8)Signed Off (6)Violation (16)Inspection (4)Objection (11)Special Inspection (18)
06/03/2026
Objection raised — Cost
04/28/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Open
03/06/2026
Signed off — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-I1
03/05/2026
Signed off — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-S1
12/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Patrick Lynch
11/06/2025
Filed — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-P3
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Patrick Lynch
10/31/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/06/2025
Permit issued — General Construction
B00833407-I1-GC
09/23/2025
Permit issued — Plumbing
B01107225-I1-PL
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
08/14/2025
Objection raised — Structural
08/14/2025
Objection raised — Structural
08/14/2025
Objection raised — Structural
08/14/2025
Objection raised — Admin
08/14/2025
Objection raised — Scope
08/06/2025
Filed — Alteration CO
B01217787-I1
07/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Patrick Lynch
07/09/2025
Special inspection requirement — Mechanical Systems
Patrick Lynch
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Patrick Lynch
07/09/2025
Special inspection requirement — Final
Patrick Lynch
07/09/2025
Special inspection requirement — Shutoff dampers
Patrick Lynch
07/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Patrick Lynch
07/08/2025
Filed — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-P2
06/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Patrick Lynch
06/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Patrick Lynch
06/09/2025
Special inspection requirement — Mechanical Systems
Patrick Lynch
06/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Patrick Lynch
06/09/2025
Special inspection requirement — Final
Patrick Lynch
06/09/2025
Special inspection requirement — Shutoff dampers
Patrick Lynch
03/07/2025
Permit issued — Plumbing
B01107225-I1-PL
02/19/2025
Permit issued — Mechanical Systems
B01107225-S1-MS
12/20/2024
Signed off — Alteration
B00704610-I1
12/11/2024
Filed — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-I1
12/11/2024
Filed — Alteration
Herewith filing for demo of existing branch natural gas piping and installation of new branch natural gas piping to the new rooftop air handling unit as per the drawings. No change in use, egress or occupancy.
B01107225-S1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/07/2024
Signed off — Alteration
B00704690-I1
05/17/2024
Filed — Alteration
New Emergency Generator for the Meter OPS Building
B00834735-I1
05/17/2024
Filed — Alteration
B00834743-I1
03/26/2024
Filed — Alteration
Concrete pad for M&R and new emergency generator
B00833407-I1
03/22/2024
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
09/11/2023
Signed off — Alteration
INTERIOR BATHROOM RENOVATION METER OPERATIONS BLDG
B00704740-I1
09/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBANCKER CONSTRUCTION CORP10/06/2025
DOB NOWPlumbingSigned-offCROSS CHECK MECH. CORP09/23/2025
DOB NOWPlumbingSigned-offCROSS CHECK MECH. CORP03/07/2025
DOB NOWMechanical SystemsSigned-offMATCO SERVICE CORP02/19/2025
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC06/10/2022
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP04/22/2022
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP04/21/2022
DOB NOWMechanical SystemsSigned-offMATCO SERVICE CORP10/16/2019
BISMHISSUEDEMCOR SERVICES NY/NJ INC08/20/2018
BISBLISSUEDCROSS CHECK MECH. CORP05/15/2017
BISPLISSUEDCROSS CHECK MECH. CORP05/15/2017
BISPLISSUEDWEXLER PLUMBING LLC04/05/2016
BISBLISSUEDWEXLER PLUMBING LLC04/05/2016
BISSPISSUEDA & E MECHANICAL CORP11/28/2008
BISMHISSUEDGODSIL CONSTRUCTION INC11/12/2008
1 project · most recent 05/17/2024
Generators
FiledStatusContractorScope
05/17/2024——Generators
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
11/12/2025Fire-Resistant Penetrations and JointsPatrick Lynchspecial
11/03/2025Fire-Resistant Penetrations and JointsPatrick Lynchspecial
07/09/2025HVAC-R and service water heating system controlsPatrick Lynchenergy_progress
07/09/2025Mechanical SystemsPatrick Lynchspecial
07/09/2025Energy Code Compliance InspectionsPatrick Lynchprogress
07/09/2025FinalPatrick Lynchprogress
07/09/2025Shutoff dampersPatrick Lynchenergy_progress
07/09/2025HVAC-R and service water heating equipmentPatrick Lynchenergy_progress
06/09/2025HVAC-R and service water heating equipmentPatrick Lynchenergy_progress
06/09/2025HVAC-R and service water heating system controlsPatrick Lynchenergy_progress
06/09/2025Mechanical SystemsPatrick Lynchspecial
06/09/2025Energy Code Compliance InspectionsPatrick Lynchprogress
06/09/2025FinalPatrick Lynchprogress
06/09/2025Shutoff dampersPatrick Lynchenergy_progress
03/22/2024Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
02/24/2023Mechanical Systems—special
02/24/2023Final—progress
02/22/2023FinalEUGENE BIFULCOprogress
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
08/29/2026B00704690-I1Request digital key ↗
08/29/2026B00704740-I1Request digital key ↗
08/29/2026B00704610-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00209401-I1Request digital key ↗
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
08/21/2018321760439Open ↗
06/16/2017321160505Open ↗
06/16/2017321160505Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
08/21/2018321760439Open ↗
11/12/2014321160505Open ↗
03/24/2009310212828Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/18/2016321160505Open ↗
▸BISPLAN / WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/28/2008310212828Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/29/2026B00704690-I1Open ↗
08/29/2026B00704740-I1Open ↗
08/29/2026B00704610-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026B01107225-S1Open ↗
09/02/2026B01107225-S1Open ↗
09/02/2026B01107225-S1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
11/16/2018321760439Open ↗
11/08/2018321760439Open ↗
08/21/2018321760439Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01107225-S1Open ↗
09/02/2026B01107225-P2Open ↗
08/27/2026B01107225-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/21/2018321760439Open ↗
11/12/2014321160505Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/21/2018321760439Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/12/2014321160505Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING2
03/24/2009310212828Open ↗
11/05/2008310212828Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/12/2014321160505Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/27/2018321760439Open ↗
▸BISEQUIPMENT USE PERMITS1
11/27/2018321760439Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/12/2014321160505Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/29/2026B00704690-I1Open ↗
08/29/2026B00704740-I1Open ↗
08/29/2026B00704610-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/21/2008310212828Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/12/2014321160505Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/16/2018321760439Open ↗
11/08/2018321760439Open ↗
08/21/2018321760439Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
11/16/2018321760439Open ↗
04/04/2018321160505Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00209401-I1Open ↗
08/23/2026B01107225-S1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/16/2018321760439Open ↗
11/08/2018321760439Open ↗
04/04/2018321160505Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/08/2018321760439Open ↗
06/16/2017321160505Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/12/2014321160505Open ↗
10/21/2008310212828Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
11/08/2018321760439Open ↗
08/21/2018321760439Open ↗
04/04/2018321160505Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM3
11/16/2018321760439Open ↗
11/08/2018321760439Open ↗
04/04/2018321160505Open ↗
▸BISEFILING COVER SHEET2
08/21/2018321760439Open ↗
11/12/2014321160505Open ↗
▸BISADDITIONAL INFORMATION1
07/22/2016321160505Open ↗