ECB12/23/2025AT TIME OF INSPECTION OBSERVED PARTITIONS ERECTED AT MULTIPLE LOCATIONS SEPARATING BAYS. ALSO ELECTRICAL FIXTURES INSTALLED THROUGHOUT, OBTAIN PERMITNothing owed — awaiting certificate of correction
Transportation, public ownership · 19,973 sf lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.