← Back
Two family frame
RADIGAN AVENUE
STATEN ISLAND · BIN 5175432
💬 Discuss this project
0Year Built
2Stories
B2Building Class
R3XZoning
2,380 sfGross Floor Area
2Units
Two family frame · 4,071 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
StructuralPlumbingCivil
Floor 24p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Basement5p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT602/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BLUE STAR HOLDING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE STAR GROUP LLCGeneral Contractor707/08/2026
CAPITAL CONTR P&H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738302/08/2023
Building Lifecycle
All (51)Filed (6)Permit Issued (5)Signed Off (2)Inspection (8)Special Inspection (30)
02/14/2023
Signed off — New Building
INSTALLATION OF PLUMBING, STORM, AND GAS FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00685121-S1
02/14/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
02/14/2023
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
02/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
02/14/2023
Special inspection requirement — Interior lighting power
anthony santoro
02/14/2023
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
02/14/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
02/14/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
02/14/2023
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
02/14/2023
Special inspection requirement — Final
anthony santoro
02/14/2023
Special inspection requirement — Ventilation and air distribution system
anthony santoro
02/14/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
02/14/2023
Special inspection requirement — Fenestration areas
anthony santoro
02/14/2023
Special inspection requirement — Air barrier — testing
anthony santoro
02/14/2023
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
02/14/2023
Special inspection requirement — Mechanical Systems
anthony santoro
02/14/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
02/14/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
02/14/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
02/14/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
02/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
02/14/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
02/14/2023
Special inspection requirement — Footing and Foundation
anthony santoro
02/14/2023
Special inspection requirement — Permanent certificate
anthony santoro
02/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
02/14/2023
Special inspection requirement — Maintenance information
anthony santoro
02/14/2023
Special inspection requirement — Air barrier - visual inspection
anthony santoro
02/14/2023
Special inspection requirement — Air barrier continuity plan testing
anthony santoro
02/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
02/14/2023
Special inspection requirement — Lighting in dwelling units
anthony santoro
02/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
02/08/2023
Filed — New Building
INSTALLATION OF PLUMBING, STORM, AND GAS FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00685121-P3
02/08/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/25/2023
Filed — New Building
INSTALLATION OF PLUMBING, STORM, AND GAS FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00685121-P2
01/23/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/17/2023
Signed off — New Building
INSTALLATION OF PLUMBING, STORM, AND GAS FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00685121-S2
01/10/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/27/2022
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
11/17/2022
Permit issued — Earth Work
S00685121-I1-GC-CX
11/02/2022
Permit issued — Earth Work
S00685121-I1-GC-CX
10/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/30/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/01/2022
Permit issued — Curb Cut
S00685121-S2-CC
08/30/2022
Filed — New Building
INSTALLATION OF PLUMBING, STORM, AND GAS FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00685121-S2
08/30/2022
Filed — New Building
INSTALLATION OF PLUMBING, STORM, AND GAS FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00685121-P1
06/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/03/2022
Permit issued — Plumbing
S00685121-S1-PL
06/02/2022
Filed — New Building
INSTALLATION OF PLUMBING, STORM, AND GAS FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00685121-S1
05/23/2022
Permit issued — Foundation
S00685121-I1-GC-CX
03/02/2022
Filed — New Building
INSTALLATION OF PLUMBING, STORM, AND GAS FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00685121-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedBLUE STAR GROUP LLC11/17/2022
DOB NOWEarth WorkPermit IssuedBLUE STAR GROUP LLC11/02/2022
DOB NOWCurb CutSigned-offBLUE STAR GROUP LLC09/01/2022
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP06/03/2022
DOB NOWFoundationPermit IssuedBLUE STAR GROUP LLC05/23/2022
1 project · most recent 02/08/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/08/2023Signed-offCAPITAL CONTR P&H CORPGas, Storm, Water/Sanitary
1 project · most recent 01/13/2023
General Wiring
FiledStatusContractorScope
01/13/2023CompleteTRUE ELECTRIC CORP.General Wiring
1 project · most recent 02/08/2023
Concrete Wood
FiledStatusContractorScope
02/08/2023Permit IssuedBLUE STAR GROUP LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/27/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
10/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/13/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
02/14/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
02/14/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
02/14/2023Insulation placement and R valuesanthony santoroenergy_progress
02/14/2023Duct leakage testing, insulation and designanthony santoroenergy_progress
02/14/2023Lighting in dwelling unitsanthony santoroenergy_progress
02/14/2023Air barrier — testing anthony santoroenergy_progress
02/14/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
02/14/2023Air barrier continuity plan testinganthony santoroenergy_progress
02/14/2023Protection of exposed foundation insulationanthony santoroenergy_progress
02/14/2023Fenestration areasanthony santoroenergy_progress
02/14/2023Air barrier - visual inspectionanthony santoroenergy_progress
02/14/2023Maintenance informationanthony santoroenergy_progress
02/14/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
02/14/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
02/14/2023Permanent certificateanthony santoroenergy_progress
02/14/2023Fenestration air leakageanthony santoroenergy_progress
02/14/2023Interior lighting poweranthony santoroenergy_progress
02/14/2023Ventilation and air distribution systemanthony santoroenergy_progress
02/14/2023Footing and Foundationanthony santoroprogress
02/14/2023Energy Code Compliance Inspectionsanthony santoroprogress
02/14/2023Finalanthony santoroprogress
02/14/2023Fire-Resistance Rated Constructionanthony santoroprogress
02/14/2023Structural Wood Frameanthony santoroprogress
02/14/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
02/14/2023Wood – Prefabricated I-Joistsanthony santorospecial
Latest 25 of 90.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026S00685121-P3Request digital key ↗
08/24/2026S00685121-P2Request digital key ↗
08/24/2026S00685121-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00685121-P2Open ↗
08/13/2026S00685121-I1Open ↗
08/13/2026S00685121-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00685121-P3Open ↗
08/13/2026S00685121-I1Open ↗
08/13/2026S00685121-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00685121-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026S00685121-P3Open ↗
09/02/2026S00685121-P3Open ↗
09/02/2026S00685121-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026S00685121-P3Open ↗
09/02/2026S00685121-P3Open ↗
09/02/2026S00685121-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026S00685121-P2Open ↗
08/24/2026S00685121-P3Open ↗
08/24/2026S00685121-S2Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00685121-P2Open ↗
08/13/2026S00685121-I1Open ↗
08/13/2026S00685121-P3Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00685121-P3Open ↗
08/13/2026S00685121-I1Open ↗
08/13/2026S00685121-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00685121-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00685121-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00685121-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00685121-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026S00685121-P3Open ↗
08/13/2026S00685121-I1Open ↗
08/13/2026S00685121-P2Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00685121-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00685121-I1Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification4
08/24/2026S00685121-I1Open ↗
08/24/2026S00685121-P3Open ↗
08/24/2026S00685121-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026S00685121-P2Open ↗
08/13/2026S00685121-P3Open ↗
08/13/2026S00685121-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00685121-I1Open ↗
08/13/2026S00685121-P2Open ↗
08/13/2026S00685121-P3Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00685121-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00685121-I1Open ↗