← Back
Parks / recreation facility
RANDALLS ISLAND
MANHATTAN · BIN 1085645
💬 Discuss this project
0Year Built
—Stories
Q1Building Class
PARKZoning
0 sfGross Floor Area
0Units
6 Open Violations 5 unresolved · 1 paperwork only ▸
Parks / recreation facility · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 9,020,800 sf lot · 0 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 4 docs
Floor 11p · 1 filing · 7 docs
Mezzanine1p · 1 filing · 10 docs
3 jobs · most recent 07/31/2026
General Wiring
FiledStatusContractorScope
07/31/2026Permit IssuedSKF ELECTRICAL CORPGeneral Wiring
02/11/2025Permit IssuedINTER CONNECTION ELETRIC—
02/22/2021CompleteP & M ELECT'L CONTR. CORPGeneral Wiring
Building Lifecycle
All (151)Filed (53)Permit Issued (27)Signed Off (15)Violation (9)Inspection (2)Objection (16)Special Inspection (29)
08/31/2026
Permit issued — General Construction
M01451588-I1-GC
08/13/2026
Permit issued — General Construction
M01435553-I1-GC
08/12/2026
Objection resolved — Resolved
08/06/2026
Objection raised — Other
08/05/2026
Filed — No Work
M01435838-I1
07/30/2026
Permit issued — General Construction
M01435553-I1-GC
07/28/2026
Filed — Alteration
Install of temp tents, platforms, trusses, production equip, no alt to exist structures for ZEDD in the Park. A TPA is required. Prod is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event complete.
M01435553-I1
07/24/2026
Filed — Alteration
TEMPORARY STRUCTURE FOR A FESTIVAL FILED IN CONJUCTION WITH THIS PERMIT. TEMPORARY STRUCTURES INCLUDE TENTS AND PLATFORM.
M01428575-P1
07/24/2026
Permit issued — General Construction
M01428575-I1-GC
07/23/2026
Special inspection requirement — Final
JEFFREY REDER
07/21/2026
Filed — Alteration
TEMPORARY STRUCTURE FOR A FESTIVAL FILED IN CONJUCTION WITH THIS PERMIT. TEMPORARY STRUCTURES INCLUDE TENTS AND PLATFORM.
M01428575-I1
07/13/2026
Permit issued — General Construction
M01428101-I1-GC
07/10/2026
Filed — Alteration
Temporary tents at Icahn stadium for US track and field championships, Removed at the end of the programing. No changes to existing structures, use or egress.
M01428101-I1
07/10/2026
Filed — No Work
M01428523-I1
12/02/2025
Signed off — Alteration
Temporary outdoor inflatable sculptures for a photo shoot in the lawn park area. Removed at the end of the programing. No changes to existing structures, use or egress.
M01316352-I1
11/14/2025
Permit issued — General Construction
M01316352-I1-GC
11/10/2025
Filed — Alteration
Temporary outdoor inflatable sculptures for a photo shoot in the lawn park area. Removed at the end of the programing. No changes to existing structures, use or egress.
M01316352-I1
11/10/2025
Special inspection requirement — Final
ANDY ENGLER ROTH
10/03/2025
Permit issued — General Construction
M01294857-I1-GC
10/01/2025
Filed — Alteration
Install of temp tents, platforms and ancillary structures, no alt to exist structures, for Athlos. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
M01294857-I1
10/01/2025
Filed — No Work
M01292552-I1
09/25/2025
Signed off — Alteration
Install temp tents, prod equip, bleachers ,no alt to exist structures for Cirque du Soleil Luzia NY. TPA permit required. Producer responsible to monitor site safety & implement HWAP. Production equip removed upon event completion
M01157604-I1
07/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2025
Signed off — Alteration
TEMPORARY BROADCAST STAGE USED IN CONJUNCTION WITH TPA EVENT
M01111792-I1
07/07/2025
Permit issued — General Construction
M01247567-I1-GC
07/02/2025
Filed — Alteration
Install of temp platforms, scenic and prod. equip., no alt to exist structures for Daybreak Breakfast Party. TPA required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete
M01247567-I1
06/30/2025
Filed — No Work
M01247618-I1
06/26/2025
Special inspection requirement — Final
DANNY TRUJILLO
05/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/13/2025
Filed — No Work
M01167042-P1
02/13/2025
Special inspection requirement — Final
TIMOTHY FRANKLIN
02/11/2025
Filed — Alteration
Install temp tents, prod equip, bleachers ,no alt to exist structures for Cirque du Soleil Luzia NY. TPA permit required. Producer responsible to monitor site safety & implement HWAP. Production equip removed upon event completion
M01157604-P1
01/21/2025
Filed — No Work
M01167042-I1
01/16/2025
Permit issued — General Construction
M01157604-I1-GC
01/08/2025
Filed — Alteration
Install temp tents, prod equip, bleachers ,no alt to exist structures for Cirque du Soleil Luzia NY. TPA permit required. Producer responsible to monitor site safety & implement HWAP. Production equip removed upon event completion
M01157604-I1
11/26/2024
Signed off — Alteration
Temporary structures for Electric Zoo festival . Structures removed at the end of the programing. No changes to existing structures, use or egress.
M00921913-I1
10/02/2024
Signed off — Alteration
M01107997-I1
09/27/2024
Permit issued — General Construction
M01111792-I1-GC
09/23/2024
Filed — No Work
M01111704-P1
09/20/2024
Permit issued — General Construction
M01107997-I1-GC
09/16/2024
Filed — Alteration
TEMPORARY BROADCAST STAGE USED IN CONJUNCTION WITH TPA EVENT
M01111792-I1
09/16/2024
Filed — No Work
M01111704-I1
09/16/2024
Special inspection requirement — Final
sean obrien
09/13/2024
Filed — Alteration
M01107997-I1
06/28/2024
Filed — Alteration
Installation of temp tents, inflatable, trussing, scenic elements, no alt to exist structures for Pokemon. Go 2024TPA permit required. Producer responsible to monitor site safety & implement HWAP. Production equipment removed upon event completion
M01067584-P1
06/28/2024
Permit issued — General Construction
M01067584-I1-GC
06/28/2024
Special inspection requirement — Final
DANNY TRUJILLO
06/28/2024
Special inspection requirement — Final
DANNY TRUJILLO
06/24/2024
Filed — Alteration
Installation of temp tents, inflatable, trussing, scenic elements, no alt to exist structures for Pokemon. Go 2024TPA permit required. Producer responsible to monitor site safety & implement HWAP. Production equipment removed upon event completion
M01067584-I1
06/20/2024
Filed — No Work
M01068379-I1
04/15/2024
Signed off — Alteration
Installation of temp platforms and canopies, no alt to exist structures for CURLFEST 2023A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
M00893154-I1
04/12/2024
Signed off — Alteration
M00908861-I1
04/12/2024
Signed off — Alteration
Installation of temp tent & platforms, no alt to exist structures for Harlem Festival. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
M00905116-I1
11/14/2023
Permit issued — General Construction
M00955253-I1-GC
11/06/2023
Filed — Alteration
Installation of temporary Circus tents and seating bleachers, no alt to exist structures for Circus Vazquez 2023 Tour. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP.
M00955253-I1
11/01/2023
Filed — No Work
M00955274-I1
09/01/2023
Filed — No Work
M00924890-P1
09/01/2023
Filed — Alteration
Temporary structures for Electric Zoo festival . Structures removed at the end of the programing. No changes to existing structures, use or egress.
M00921913-P1
09/01/2023
Objection raised — Admin
09/01/2023
Objection resolved — Addressed
Latest 60 of 151 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC PARKS DEPARTMENT4809/13/2026
CITY OF NY DEPT OF PARKS5403/21/2026
NYC DEPARTMENT OF PARK RECREAT1303/21/2026
CITY OF NEW YORK DEPT OF PARKS1303/21/2026
DEPT OF DESIGN CONSTRUCTION303/21/2026
CITY OF NY PARK & RECREATION203/21/2026
NYC DEPT OF DESIGN CONSTRUCTIO703/21/2026
CITY OF NY PARKS REC503/21/2026
TRUST FOR GOVERNORS ISLAND203/21/2026
AVON FOUNDATION FOR WOMEN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANDREW FORMICHELLA1608/05/2026
CLARK REDER ENGINEERING207/28/2026
SEAN OBRIEN ARCHITECTURE807/24/2026
SYNC ARCHITECTURE P.C1207/10/2026
URBAN INTEGRATIONS707/02/2025
THETA CONSULTING LLC202/11/2025
ADG ARCHITECTURE AND DESIGN PC309/13/2024
WAYNE RENDELY111/06/2023
SIMPSON GUMPERTZ & HEGER110/21/2022
RAAD110/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS3303/21/2026
ADG103/21/2026
HIGH POINT ENGINEERING103/21/2026
NYCDDC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINICK PRODUCTIONS, LLCGeneral Contractor2508/14/2026
GARNER ENVIRONMENTAL SERVGeneral Contractor707/08/2026
NYFF EVENTS LLCGeneral Contractor709/01/2026
JEFF SKOWRONSKIElectrical103/21/2026
FONTAO MANAGEMENT INCGeneral Contractor104/09/2026
NORMAN TCHERNOFFElectrical103/21/2026
SKOWRONSKI JEFFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RICHARD H. BALSER ENGINEE3028509/01/2023
RAAD7727110/19/2022
CLARK REDER ENGINEERING,6680106/11/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNYFF EVENTS LLC08/31/2026
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC08/13/2026
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC07/30/2026
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC07/24/2026
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC07/13/2026
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC11/14/2025
DOB NOWGeneral ConstructionPermit IssuedFONTAO MANAGEMENT10/03/2025
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC07/07/2025
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC01/16/2025
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC09/27/2024
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC09/20/2024
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC06/28/2024
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC11/14/2023
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC08/25/2023
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC08/01/2023
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC07/21/2023
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC07/14/2023
DOB NOWGeneral ConstructionSigned-offGARNER ENVIRONMENTAL SERV10/28/2022
DOB NOWGeneral ConstructionSigned-offGARNER ENVIRONMENTAL SERV10/28/2022
DOB NOWMechanical SystemsPermit IssuedGARNER ENVIRONMENTAL SERV10/28/2022
DOB NOWStructuralSigned-offWINICK PRODUCTIONS, LLC08/23/2022
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC02/17/2022
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC02/17/2022
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC08/18/2021
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC08/18/2021
DOB NOWStructuralSigned-offWINICK PRODUCTIONS, LLC06/16/2021
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC06/16/2021
BISOTISSUEDWINICK PRODUCTIONS, LLC11/13/2020
BISOTISSUEDPRODUCTION GLUE LLC07/02/2019
BISOTISSUEDPRODUCTION GLUE LLC06/14/2019
BISOTISSUEDWINICK PRODUCTIONS, LLC05/22/2019
BISOTISSUEDARENA EVENT SERVICES INC03/28/2019
BISOTISSUEDWINICK PRODUCTIONS, LLC08/20/2018
BISOTISSUEDAEG PRESENTS LLC07/13/2018
BISOTISSUEDPRODUCTION GLUE LLC06/27/2018
BISOTISSUEDWINICK PRODUCTIONS, LLC05/22/2018
BISOTISSUEDARENA EVENT SERVICES INC03/15/2018
BISOTISSUEDWESTCHESTER TOOL RENTALS09/29/2017
BISOTISSUEDWINICK PRODUCTIONS, LLC08/17/2017
BISOTISSUEDAEG LIVE LLC07/13/2017
+ 37 more permits on file
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
07/23/2026FinalJEFFREY REDERprogress
11/10/2025FinalANDY ENGLER ROTHprogress
06/26/2025FinalDANNY TRUJILLOprogress
02/13/2025FinalTIMOTHY FRANKLINprogress
09/16/2024Finalsean obrienprogress
06/28/2024FinalDANNY TRUJILLOprogress
06/28/2024FinalDANNY TRUJILLOprogress
09/01/2023FinalANDY ENGLER ROTHprogress
09/01/2023Structural Steel - DetailsBalser Richardspecial
08/30/2023FinalANDY ENGLER ROTHprogress
08/30/2023Structural Steel - DetailsBalser Richardspecial
07/17/2023FinalDANNY TRUJILLOprogress
06/20/2023FinalDANNY TRUJILLOprogress
10/19/2022FinalDANIEL LOUISprogress
10/17/2022Mechanical SystemsNICHOLAS AZADIANspecial
10/17/2022FinalNICHOLAS AZADIANprogress
10/13/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Christopher Drutjonsspecial
10/13/2022FinalChristopher Drutjonsprogress
08/29/2022FinalANDY ENGLER ROTHprogress
08/29/2022Structural Steel - DetailsBalser Richardspecial
08/29/2022FinalANDY ENGLER ROTHprogress
08/29/2022Structural Wood FrameBalser Richardprogress
08/29/2022Structural Wood FrameBalser Richardprogress
08/29/2022Structural Cold-Formed SteelBalser Richardspecial
08/29/2022Structural Cold-Formed SteelBalser Richardspecial
Latest 25 of 29.
▾Documents — 1,004 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch28
09/03/2026M00538911-I1Contact architect ↗
09/03/2026M00578045-I1Contact architect ↗
09/02/2026M00679243-I1Contact architect ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly25
09/05/2026M00158399-I1Contact architect ↗
09/05/2026M00171725-I1Contact architect ↗
09/05/2026M00191192-I1Contact architect ↗
Showing 3 of 25 on file for this type
▸Applications & Permits177
▸BISPLAN / WORK APPROVAL APPLICATION89
11/06/2020140976166Open ↗
08/16/2019123770311Open ↗
07/11/2019123777118Open ↗
Showing 3 of 89 on file for this type
▸BISWORK PERMIT APPLICATION88
11/13/2020140976166Open ↗
08/16/2019123770311Open ↗
07/11/2019123689650Open ↗
Showing 3 of 88 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
11/06/2020140976166Open ↗
▸Seals & Professional Certifications377
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION143
02/07/2020123750538Open ↗
02/07/2020123750538Open ↗
11/29/2019123779232Open ↗
Showing 3 of 143 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST72
08/16/2019123770311Open ↗
07/11/2019123777118Open ↗
07/03/2019123689650Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature52
09/05/2026M00171725-I1Open ↗
09/05/2026M00212741-I1Open ↗
09/03/2026M00578045-I1Open ↗
Showing 3 of 52 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT47
11/06/2020140976166Open ↗
08/16/2019123770311Open ↗
07/11/2019123777118Open ↗
Showing 3 of 47 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/27/2026M01067584-P1Open ↗
09/02/2026M00905116-I1Open ↗
09/02/2026M00921913-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026M00921913-I1Open ↗
09/02/2026M00921913-P1Open ↗
09/01/2026M08022397-I1Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/06/2020140976166Open ↗
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/06/2020140976166Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos16
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/20/2018123517220Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
11/23/2020123311308Open ↗
11/23/2020123311308Open ↗
11/19/2020123568433Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs150
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST68
11/23/2020123311308Open ↗
11/19/2020123568433Open ↗
10/30/2020123380661Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter41
09/03/2026M00578045-I1Open ↗
08/29/2026M00908861-I1Open ↗
08/29/2026M00910663-I1Open ↗
Showing 3 of 41 on file for this type
▸BISADMINISTRATIVE OBJECTIONS28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
12/03/2018123517220Open ↗
12/03/2018123517220Open ↗
Showing 2 of 11 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
11/06/2020140976166Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership70
▸BISCOST AFFIDAVIT70
11/06/2020140976166Open ↗
09/20/2018123517220Open ↗
07/09/2018123377149Open ↗
Showing 3 of 70 on file for this type
▸Filing & Intake Forms131
▸BISEFILING COVER SHEET71
08/16/2019123770311Open ↗
07/11/2019123777118Open ↗
07/03/2019123689650Open ↗
Showing 3 of 71 on file for this type
▸BISADDITIONAL INFORMATION45
08/16/2019123770311Open ↗
08/16/2019123770311Open ↗
07/18/2019123777118Open ↗
Showing 3 of 45 on file for this type
▸BISBOROUGH INTAKE FORM13
02/07/2020123750538Open ↗
11/29/2019123779232Open ↗
11/07/2019123689650Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/06/2020140976166Open ↗
Showing 1 of 2 on file for this type
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION15
09/20/2018123517220Open ↗
12/22/2017122900986Open ↗
10/04/2017123326846Open ↗
Showing 3 of 15 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
11/06/2020140976166Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type