← Back
Condo, residential unit in 1-3 story building
Cypress Crest Condominium
RICHMOND AVENUE · BIN 5171185
💬 Discuss this project
1986Year Built
2Stories
R3Building Class
R3-2Zoning
101,352 sfGross Floor Area
94Units
5 Open Violations ▸FDNY Report ↗
Condo, residential unit in 1-3 story building · Owner of record: CYPRESS CREST CONDOMINIUM CORP · 215,583 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC109/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272109/24/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
12/11/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01290610-I1
09/29/2025
Permit issued — Solar
S01290610-I1-SL
09/24/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01290610-I1
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
09/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/19/2025
Special inspection requirement — Final
Walid Abdulla
09/19/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC09/29/2025
2 projects · most recent 09/24/2025
General Wiring
FiledStatusContractorScope
09/24/2025CompleteSUNRUN SOLAR ELECTL CORP—
09/13/2025CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/19/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/19/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/19/2025Energy Code Compliance InspectionsWalid Abdullaprogress
09/19/2025FinalWalid Abdullaprogress
09/19/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026S01290610-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026S01290610-I1Open ↗
08/29/2026S01290610-I1Open ↗
08/29/2026S01290610-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026S01290610-I1Open ↗
08/29/2026S01290610-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01290610-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01290610-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01290610-I1Open ↗