2025Year Built
2Stories
K4Building Class
R3AZoning
2,750 sfGross Floor Area
3Units
2 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · 3,000 sf lot · 0.92 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction24p · 1 filing · 20 docs
Floor 1Under Construction26p · 1 filing · 20 docs
CellarUnder Construction29p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEARS CONSTRUCTION4507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHOK ARCHITECTURE DESIGN, PL/711/18/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEAR'S CONSTRUCTION INCGeneral Contractor1207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHOK ARCHITECTURE DESIGN6027511/18/2024
Building Lifecycle
All (79)Filed (7)Permit Issued (8)Violation (24)Objection (10)Special Inspection (30)
04/17/2026
Violation issued (ECB, closed)
Construction
04/17/2026
Violation issued (ECB, closed)
Construction
04/17/2026
Violation issued (ECB, closed)
Construction
04/17/2026
Violation issued (ECB, closed)
Construction
04/17/2026
Violation issued (ECB, closed)
Construction
11/19/2025
Permit issued — Construction Fence
S00739621-S3-FN
09/16/2025
Permit issued — General Construction
S00739621-I1-GC
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, open)
Unknown
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Site Safety
06/03/2025
Violation issued (ECB, closed)
Site Safety
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, closed)
Unknown
03/11/2025
Permit issued — Foundation
S00739621-S6-FO
02/04/2025
Violation issued (ECB, closed)
Construction
01/31/2025
Permit issued — Structural
S00739621-S4-ST
01/28/2025
Permit issued — Support of Excavation
S00739621-S5-SE
01/28/2025
Violation issued (ECB, closed)
Construction
01/28/2025
Violation issued (ECB, closed)
Construction
12/04/2024
Objection resolved — Addressed
12/03/2024
Violation issued (ECB, closed)
Construction
11/18/2024
Filed — New Building
Cellar Floor has 2 Piece Bathroom. The First Floor has 2 Piece Bathroom and Counter Sink. The Second Floor has Two Dwelling Units Each with Full Bathroom and a Kitchen Sink. Two Residential Dwelling Units Each has a Gas Fired Range.
S00739621-S6
11/18/2024
Objection resolved — Addressed
11/18/2024
Special inspection requirement — Concrete - Cast-In-Place
Ashish Patel
11/18/2024
Special inspection requirement — Final
Ashish Patel
11/18/2024
Special inspection requirement — Footing and Foundation
Ashish Patel
11/08/2024
Objection raised — Other
11/07/2024
Objection raised — Scope
10/31/2024
Filed — New Building
Cellar Floor has 2 Piece Bathroom. The First Floor has 2 Piece Bathroom and Counter Sink. The Second Floor has Two Dwelling Units Each with Full Bathroom and a Kitchen Sink. Two Residential Dwelling Units Each has a Gas Fired Range.
S00739621-S5
10/31/2024
Special inspection requirement — Concrete - Cast-In-Place
Ashish Patel
10/31/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Ashish Patel
10/31/2024
Special inspection requirement — Structural Steel - Welding
Ashish Patel
10/25/2024
Filed — New Building
Cellar Floor has 2 Piece Bathroom. The First Floor has 2 Piece Bathroom and Counter Sink. The Second Floor has Two Dwelling Units Each with Full Bathroom and a Kitchen Sink. Two Residential Dwelling Units Each has a Gas Fired Range.
S00739621-S4
10/23/2024
Special inspection requirement — Final
Ashish Patel
10/23/2024
Special inspection requirement — Structural Steel - Details
Ashish Patel
10/23/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Ashish Patel
10/23/2024
Special inspection requirement — Post-installed Anchors
Ashish Patel
10/23/2024
Special inspection requirement — Sprayed fire-resistant materials
Ashish Patel
10/23/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Ashish Patel
10/23/2024
Special inspection requirement — Structural Steel - Welding
Ashish Patel
10/23/2024
Special inspection requirement — Concrete - Cast-In-Place
Ashish Patel
10/06/2024
Filed — New Building
Cellar Floor has 2 Piece Bathroom. The First Floor has 2 Piece Bathroom and Counter Sink. The Second Floor has Two Dwelling Units Each with Full Bathroom and a Kitchen Sink. Two Residential Dwelling Units Each has a Gas Fired Range.
S00739621-S1
10/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ashish Patel
10/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
10/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
10/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ashish Patel
10/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
10/04/2024
Violation issued (ECB, closed)
Construction
10/04/2024
Violation issued (ECB, closed)
Unknown
10/04/2024
Violation issued (ECB, closed)
Unknown
10/04/2024
Violation issued (ECB, closed)
Construction
10/03/2024
Violation issued (ECB, open)
Construction
09/24/2024
Permit issued — General Construction
S00739621-I1-GC
09/04/2024
Permit issued — Curb Cut
S00739621-S2-CC
09/04/2024
Permit issued — Construction Fence
S00739621-S3-FN
07/15/2024
Filed — New Building
Cellar Floor has 2 Piece Bathroom. The First Floor has 2 Piece Bathroom and Counter Sink. The Second Floor has Two Dwelling Units Each with Full Bathroom and a Kitchen Sink. Two Residential Dwelling Units Each has a Gas Fired Range.
S00739621-S3
03/12/2024
Objection resolved — Addressed
01/10/2024
Filed — New Building
Cellar Floor has 2 Piece Bathroom. The First Floor has 2 Piece Bathroom and Counter Sink. The Second Floor has Two Dwelling Units Each with Full Bathroom and a Kitchen Sink. Two Residential Dwelling Units Each has a Gas Fired Range.
S00739621-S2
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedDEARS CONSTRUCTION11/19/2025
DOB NOWGeneral ConstructionPermit IssuedDEARS CONSTRUCTION09/16/2025
DOB NOWFoundationPermit IssuedDEARS CONSTRUCTION03/11/2025
DOB NOWStructuralPermit IssuedDEARS CONSTRUCTION01/31/2025
DOB NOWSupport of ExcavationSigned-offDEARS CONSTRUCTION01/28/2025
DOB NOWGeneral ConstructionPermit IssuedDEARS CONSTRUCTION09/24/2024
DOB NOWCurb CutPermit IssuedDEARS CONSTRUCTION09/04/2024
DOB NOWConstruction FencePermit IssuedDEARS CONSTRUCTION09/04/2024
1 project · most recent 11/18/2024
Water/Sanitary
FiledStatusContractorScope
11/18/2024——Water/Sanitary
1 project · most recent 11/18/2024
Steel Concrete
FiledStatusContractorScope
11/18/2024Permit IssuedDEAR'S CONSTRUCTION INCSteel, Concrete
1 project · most recent 11/18/2024
Fence
FiledStatusContractorScope
11/18/2024Permit IssuedDEAR'S CONSTRUCTION INCFence
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
11/18/2024Concrete - Cast-In-PlaceAshish Patelspecial
11/18/2024FinalAshish Patelprogress
11/18/2024Footing and FoundationAshish Patelprogress
10/31/2024Concrete - Cast-In-PlaceAshish Patelspecial
10/31/2024Excavations - Sheeting, Shoring, and BracingAshish Patelspecial
10/31/2024Structural Steel - WeldingAshish Patelspecial
10/23/2024FinalAshish Patelprogress
10/23/2024Structural Steel - DetailsAshish Patelspecial
10/23/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Ashish Patelspecial
10/23/2024Post-installed AnchorsAshish Patelspecial
10/23/2024Sprayed fire-resistant materialsAshish Patelspecial
10/23/2024Structural Steel - High Strength BoltingAshish Patelspecial
10/23/2024Structural Steel - WeldingAshish Patelspecial
10/23/2024Concrete - Cast-In-PlaceAshish Patelspecial
10/05/2024HVAC-R and service water heating system controlsAshish Patelenergy_progress
10/05/2024HVAC-R and service water piping design and insulationAshish Patelenergy_progress
10/05/2024Energy Code Compliance InspectionsAshish Patelprogress
10/05/2024HVAC-R and service water heating equipmentAshish Patelenergy_progress
10/05/2024Fire-Resistant Penetrations and JointsAshish Patelspecial
12/30/2022Subgrade InspectionsAshish Patelspecial
12/30/2022Interior lighting powerAshish Patelenergy_progress
12/30/2022Lighting in dwelling unitsAshish Patelenergy_progress
12/30/2022Maintenance informationAshish Patelenergy_progress
12/30/2022Duct leakage testing, insulation and designAshish Patelenergy_progress
12/30/2022Ventilation and air distribution systemAshish Patelenergy_progress
Latest 25 of 48.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026S00739621-S3Request digital key ↗
08/20/2026S00739621-S2Request digital key ↗
08/20/2026S00739621-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
01/29/2024540241898Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00739621-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00739621-I1Open ↗
▸Seals & Professional Certifications57
▸DOB NOWProgress Inspector Seal & Signature28
09/26/2026S00739621-S1Open ↗
09/26/2026S00739621-S1Open ↗
09/26/2026S00739621-S1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/26/2026S00739621-S1Open ↗
08/30/2026S00739621-S6Open ↗
08/25/2026S00739621-S5Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026S00739621-S2Open ↗
08/20/2026S00739621-S1Open ↗
08/20/2026S00739621-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/04/2023540241898Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/04/2023540241898Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00739621-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00739621-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026S00739621-I1Open ↗
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/09/2023540241898Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/29/2024540241898Open ↗
▸BISDOT RAMP APPROVAL.1
01/11/2024540241898Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
12/26/2023540241898Open ↗
▸Other Documents9
▸BISBPP: TOPOGRAPHIC SURVEY1
11/22/2023540241898Open ↗
▸BISWAIVER OF CURB ALIGNMENT IN HARBOR ROAD1
01/29/2024540241898Open ↗
▸BISWAIVER OF CURB ALIGNMENT ON RICHMOND TERRACE1
01/29/2024540241898Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/22/2023540241898Open ↗
▸BISWAIVER OF SIDEWALK ON BOTH STREET.1
01/29/2024540241898Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/09/2023540241898Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026S00739621-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00739621-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00739621-S5Open ↗