← Back
Unlicensed parking lot
ROCKAWAY BOULEVARD
QUEENS · BIN 4625700
💬 Discuss this project
0Year Built
—Stories
G7Building Class
R3-2Zoning
0 sfGross Floor Area
0Units
0 Open Violations
Unlicensed parking lot · Owner of record: BOLLA EM REALTY, LLC · 5,655 sf lot · 0 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (19)Filed (4)Violation (10)Special Inspection (5)
07/08/2026
Filed — Alteration
Q01399752-S2
07/08/2026
Filed — Alteration
Q01399752-S1
05/12/2026
Filed — Alteration
Q01399752-I1
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
05/11/2026
Special inspection requirement — Masonry
05/11/2026
Special inspection requirement — Subgrade Inspections
05/11/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
05/08/2026
Special inspection requirement — Final
Christopher Tartaglia
07/07/2025
Filed — New Building
Q01213712-I1
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOLLA EM REALTY309/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIGH POINT ENGINEERING307/08/2026
CORNERSTONE ENGINEERS AND ARCHITECT107/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH POINT ENGINEERING103/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/11/2026Concrete - Cast-In-Place—special
05/11/2026Masonry—special
05/11/2026Subgrade Inspections—special
05/11/2026Subsurface Conditions – Fill Placement & In-Place Density—special
05/08/2026FinalChristopher Tartagliaprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026Q01213712-I1Request digital key ↗
08/16/2026Q01399752-S1Request digital key ↗
08/16/2026Q01399752-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01213712-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01213712-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026Q01213712-I1Open ↗
08/16/2026Q01399752-I1Open ↗
08/16/2026Q01399752-S2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/19/2026Q01213712-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/19/2026Q01213712-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01213712-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01213712-I1Open ↗