← Back
Miscellaneous vacant land
ROOSEVELT AVENUE
QUEENS · BIN 4624689
💬 Discuss this project
0Year Built
—Stories
V9Building Class
—Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Miscellaneous vacant land · 4,590 sf lot · 0 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RELATED COMPANIES903/21/2026
DANICO SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ECD NY INCGeneral Contractor1007/08/2026
TRIUMPH CONSTRUCTION CORPGeneral Contractor707/31/2026
L.L.G. PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LANGAN ENG, ENV, SURVEYIN1265703/04/2024
MUESER RUTLEDGE CONSULTIN977111/10/2023
ATLANTIC ENGINEERINGLABOR1381210/03/2023
Building Lifecycle
All (19)Filed (12)Signed Off (7)
10/25/2024
Signed off — Alteration
CONSTRUCTION OF A RETAINING WALL AND BRIDGE DECK CONNECTING TO ROOSEVELT AVENUE ABUTMENT.
Q00913686-I1
10/24/2024
Signed off — Alteration
SUPPORT OF EXCAVATION ON VACANT LAND FOR A SOIL MIX WALL TO FACILITATE ROADWAY CONSTRUCTION
Q00897814-I1
10/09/2024
Signed off — Alteration
Q00898207-S1
07/24/2024
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE FOR NB CONSTRUCTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
Q00917444-I1
03/11/2024
Signed off — Alteration
SUPPORT OF EXCAVATION ON VACANT LAND FOR A SOIL MIX WALL TO FACILITATE ROADWAY CONSTRUCTION AND CON EDISON VAULT.
Q00874191-I1
03/04/2024
Filed — Alteration
SUPPORT OF EXCAVATION ON VACANT LAND FOR A SOIL MIX WALL TO FACILITATE ROADWAY CONSTRUCTION AND CON EDISON VAULT.
Q00874191-P4
02/06/2024
Signed off — Alteration
SUPPORT OF EXCAVATION ON VACANT LAND FOR A SOIL MIX WALL TO FACILITATE ROADWAY CONSTRUCTION
Q00897814-S1
01/18/2024
Filed — Alteration
SUPPORT OF EXCAVATION ON VACANT LAND FOR A SOIL MIX WALL TO FACILITATE ROADWAY CONSTRUCTION AND CON EDISON VAULT.
Q00874191-P3
11/27/2023
Signed off — Alteration
SUPPORT OF EXCAVATION FOR SITE REMEDIATION PROJECT ON VACANT LAND. SPECIFICALLY, REINSTALLATION OF ABOUT 105 FEET OF SHEETING ALONG THE NORTHERN SIDE OF THE TRENCH AND INSTALLATION OF ADDITIONAL BRACING WITHIN THE TRENCH AS PER PLANS FILED HEREWITH.
Q00948416-I1
11/10/2023
Filed — Alteration
SUPPORT OF EXCAVATION ON VACANT LAND FOR A SOIL MIX WALL TO FACILITATE ROADWAY CONSTRUCTION
Q00897814-S1
11/01/2023
Filed — Alteration
SUPPORT OF EXCAVATION FOR SITE REMEDIATION PROJECT ON VACANT LAND. SPECIFICALLY, REINSTALLATION OF ABOUT 105 FEET OF SHEETING ALONG THE NORTHERN SIDE OF THE TRENCH AND INSTALLATION OF ADDITIONAL BRACING WITHIN THE TRENCH AS PER PLANS FILED HEREWITH.
Q00948416-I1
10/03/2023
Filed — Alteration
CONSTRUCTION OF A RETAINING WALL AND BRIDGE DECK CONNECTING TO ROOSEVELT AVENUE ABUTMENT.
Q00913686-I1
09/06/2023
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE FOR NB CONSTRUCTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
Q00917444-I1
08/15/2023
Filed — Alteration
SUPPORT OF EXCAVATION ON VACANT LAND FOR A SOIL MIX WALL TO FACILITATE ROADWAY CONSTRUCTION AND CON EDISON VAULT.
Q00874191-P2
08/03/2023
Filed — Alteration
SUPPORT OF EXCAVATION ON VACANT LAND FOR A SOIL MIX WALL TO FACILITATE ROADWAY CONSTRUCTION
Q00897814-I1
08/01/2023
Filed — Alteration
Q00898207-S1
07/27/2023
Filed — Alteration
Q00898207-I1
06/28/2023
Filed — Alteration
SUPPORT OF EXCAVATION ON VACANT LAND FOR A SOIL MIX WALL TO FACILITATE ROADWAY CONSTRUCTION AND CON EDISON VAULT.
Q00874191-P1
05/23/2023
Filed — Alteration
SUPPORT OF EXCAVATION ON VACANT LAND FOR A SOIL MIX WALL TO FACILITATE ROADWAY CONSTRUCTION AND CON EDISON VAULT.
Q00874191-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTRIUMPH CONSTRUCTION CORP07/30/2026
DOB NOWGeneral ConstructionPermit IssuedTRIUMPH CONSTRUCTION CORP08/29/2025
DOB NOWGeneral ConstructionPermit IssuedTRIUMPH CONSTRUCTION CORP09/19/2024
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC01/02/2024
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC12/11/2023
DOB NOWSupport of ExcavationSigned-offECD NY INC11/17/2023
DOB NOWFoundationSigned-offECD NY INC11/16/2023
DOB NOWSupport of ExcavationSigned-offTRIUMPH CONSTRUCTION CORP11/09/2023
DOB NOWGeneral ConstructionPermit IssuedTRIUMPH CONSTRUCTION CORP09/21/2023
DOB NOWConstruction FenceSigned-offECD NY INC09/06/2023
DOB NOWFoundationSigned-offECD NY INC08/24/2023
DOB NOWSupport of ExcavationSigned-offECD NY INC08/03/2023
DOB NOWSupport of ExcavationSigned-offECD NY INC06/05/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/19/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/19/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/28/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/08/2024Excavations - Sheeting, Shoring, and BracingAlan Poeppelspecial
02/21/2024Excavations - Sheeting, Shoring, and BracingAlan Poeppelspecial
01/02/2024Excavations - Sheeting, Shoring, and BracingAlan Poeppelspecial
11/02/2023Excavations - Sheeting, Shoring, and BracingJan Cermakspecial
11/02/2023Subsurface Conditions – Fill Placement & In-Place DensityJan Cermakspecial
10/16/2023Excavations - Sheeting, Shoring, and BracingAlan Poeppelspecial
08/14/2023Excavations - Sheeting, Shoring, and BracingAlan Poeppelspecial
07/24/2023Concrete - Cast-In-PlaceChristopher O'Malleyspecial
07/24/2023Deep Foundation ElementsAlan Poeppelspecial
07/03/2023Structural Steel - DetailsChristopher O'Malleyspecial
06/29/2023FinalChristopher O'Malleyprogress
06/29/2023Footing and FoundationChristopher O'Malleyprogress
06/20/2023Excavations - Sheeting, Shoring, and BracingAlan Poeppelspecial
Nothing on file for this building.