← Back
Two family brick
SANFORD AVENUE
QUEENS · BIN 4623002
💬 Discuss this project
2021Year Built
3Stories
B1Building Class
R4-1Zoning
2,964 sfGross Floor Area
2Units
Two family brick · Owner of record: 14956 GROUP LLC · 3,435 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.209/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WASOFF PLBG & UTILITY COPlumbing403/22/2026
JIN SUN CONSTRUCTION INCGeneral Contractor303/21/2026
JOSEPH CANTALINOElectrical103/21/2026
RIGHTWAY ELECTRICAL INC 004046General Contractor103/22/2026
Building Lifecycle
All (7)Filed (2)Permit Issued (1)Signed Off (1)Inspection (1)Objection (2)
09/21/2021
Signed off — Alteration
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00205644-I1
09/20/2021
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/08/2021
Filed — Alteration
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00205644-P1
09/01/2021
Permit issued — Curb Cut
Q00205644-I1-CC
07/13/2020
Objection raised — Scope
07/13/2020
Objection resolved — Addressed
07/10/2020
Filed — Alteration
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00205644-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJIN L. LIN09/01/2021
BISPLISSUEDWASOFF PLBG & UTILITY CO08/04/2021
BISPLISSUEDWASOFF PLBG & UTILITY CO07/17/2020
BIS—ISSUEDJIN SUN CONSTRUCTION INC01/03/2020
BIS—ISSUEDD Z IMAGE INC11/13/2019
1 project · most recent 07/07/2021
General Wiring
FiledStatusContractorScope
07/07/2021CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/20/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Curb Cut2
08/27/2026Q00205644-P1Request digital key ↗
08/15/2026Q00205644-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION5
11/05/2021421950455Open ↗
07/16/2021421950455Open ↗
06/15/2021421950455Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
07/17/2020421950455Open ↗
01/06/2020421950455Open ↗
11/14/2019421950455Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/31/2020421950455Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
08/15/2021421950455Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/15/2021421950455Open ↗
▸BISZONING DIAGRAM1
09/30/2019421950455Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
09/30/2019421950455Open ↗
▸Seals & Professional Certifications5
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/14/2019421950455Open ↗
11/14/2019421950455Open ↗
09/30/2019421950455Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026Q00205644-P1Open ↗
08/27/2026Q00205644-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/29/2019421950455Open ↗
▸BISSCHEDULE B - PLUMBING1
07/16/2021421950455Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE SIGNOFF1
11/01/2021421950455Open ↗
▸BISSTREET TREES SITE PLAN1
07/29/2021421950455Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/07/2021421950455Open ↗
08/15/2021421950455Open ↗
07/06/2021421950455Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/14/2019421950455Open ↗
09/30/2019421950455Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/15/2021421950455Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY7
09/07/2021421950455Open ↗
09/07/2021421950455Open ↗
08/17/2021421950455Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/24/2021421950455Open ↗
11/14/2019421950455Open ↗
▸BISHYDRO FLOW TEST LETTER1
09/30/2019421950455Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
09/30/2019421950455Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
11/14/2019421950455Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
08/15/2021421950455Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/07/2021421950455Open ↗
08/15/2021421950455Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
07/16/2021421950455Open ↗
07/29/2019421950455Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/30/2019421950455Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
11/14/2019421950455Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION7
12/01/2021421950455Open ↗
08/15/2021421950455Open ↗
08/15/2021421950455Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET1
07/26/2019421950455Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM3
08/15/2021421950455Open ↗
09/30/2019421950455Open ↗
07/29/2019421950455Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/14/2019421950455Open ↗