← Back
Zoned residential, not Manhattan
SEELEY LANE
STATEN ISLAND · BIN 5175065
💬 Discuss this project
2025Year Built
—Stories
V0Building Class
R3AZoning
6,593 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned residential, not Manhattan · Owner of record: SEELEY LANE CONSTRUCTION LLC · 6,550 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 227p · 2 filings · 20 docs
Floor 127p · 2 filings · 20 docs
Cellar25p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CEE JAY REAL ESTATE DEVELOPMENT COR2207/28/2026
SKEN SERVICES403/22/2026
CEE JAY REAL ESTATE DEV303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE811/04/2025
A TECH ENGINEERING NYC, PLLC.106/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE403/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEE JAY REAL ESTATE DEVELOPMENTGeneral Contractor907/08/2026
RTR CONSTRUCTION CO INCGeneral Contractor507/28/2026
SKEN SERVICES CORPGeneral Contractor207/09/2026
JUST PLBG & HTG INCPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472411/04/2025
SRA PLANNING & EXPEDITING5677411/04/2025
Building Lifecycle
All (66)Filed (9)Permit Issued (14)Signed Off (2)Violation (4)Inspection (7)Special Inspection (30)
08/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/28/2026
Signed off — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF AN 8.0' HIGH TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00508241-I1
07/27/2026
Permit issued — Construction Fence
S00508241-I1-FN
07/07/2026
Permit issued — Curb Cut
S00789822-I1-CC
12/15/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/11/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
WILLIAM MONTAGUE
12/11/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Preliminary
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Final
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Metering
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
12/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
12/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
12/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
12/11/2025
Special inspection requirement — Protection of exposed foundation insulation
Stanislav Pilipenko
11/04/2025
Filed — New Building
APPLICATION IS FILED FOR PLUMBING WORK ONLY AS ASSOCAITED TO NEW 2-STORY (2) FAMILY, DETACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00824824-P1
07/28/2025
Permit issued — Construction Fence
S00508241-I1-FN
05/29/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/16/2025
Permit issued — Plumbing
S00805066-I1-PL
05/15/2025
Filed — New Building
APPLICATION IS FILED FOR PLUMBING WORK ONLY AS ASSOCAITED TO NEW 2-STORY (2) FAMILY, DETACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00824824-P2
05/14/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
03/27/2025
Violation issued (ECB, closed)
Construction
03/07/2025
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF AN 8.0' HIGH TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00508241-P1
02/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/12/2025
Violation issued (ECB, closed)
Unknown
02/12/2025
Violation issued (ECB, closed)
Construction
02/12/2025
Violation issued (ECB, closed)
Construction
01/07/2025
Permit issued — Plumbing
S00824824-S1-PL
12/11/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/04/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/19/2024
Permit issued — Plumbing
S00824824-S1-PL
10/23/2024
Permit issued — General Construction
S00824824-I1-GC-CX
10/11/2024
Permit issued — Construction Fence
S00508241-I1-FN
11/14/2023
Permit issued — Construction Fence
S00508241-I1-FN
06/02/2023
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00805066-I1
06/01/2023
Filed — New Building
APPLICATION IS FILED FOR PLUMBING WORK ONLY AS ASSOCAITED TO NEW 2-STORY (2) FAMILY, DETACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00824824-S1
03/07/2023
Filed — New Building
APPLICATION IS FILED FOR PLUMBING WORK ONLY AS ASSOCAITED TO NEW 2-STORY (2) FAMILY, DETACHED RESIDENCE AS WELL AS TO OBTAIN NEW CERTIFICATE OF OCCUPANCY. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00824824-I1
11/09/2022
Permit issued — Construction Fence
S00508241-I1-FN
08/24/2022
Signed off — Alteration
S00506286-I1
08/18/2022
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF A 10'-0" CURBCUT ALONG SEELEY LANE, A DISTANCE OF 335.66 FROM AMBOYROAD NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00789822-I1
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offRTR CONSTRUCTION CO INC07/27/2026
DOB NOWCurb CutPermit IssuedSKEN SERVICES CORP07/07/2026
DOB NOWConstruction FenceSigned-offRTR CONSTRUCTION CO INC07/28/2025
DOB NOWPlumbingPermit IssuedMOHAMED ABDELRAZEK05/16/2025
DOB NOWPlumbingPermit IssuedMOHAMED ABDELRAZEK01/07/2025
DOB NOWPlumbingPermit IssuedQUALITY PLUMBING, INC11/19/2024
DOB NOWGeneral ConstructionPermit IssuedTT & T CONSTRUCTION INC10/23/2024
DOB NOWConstruction FenceSigned-offRTR CONSTRUCTION CO INC10/11/2024
DOB NOWConstruction FenceSigned-offSTRUCTURETECH NY11/14/2023
DOB NOWConstruction FenceSigned-offSTRUCTURETECH NY11/09/2022
DOB NOWConstruction FenceSigned-offSTRUCTURETECH NY07/11/2022
DOB NOWGeneral ConstructionSigned-offSTRUCTURETECH NY07/11/2022
DOB NOWGeneral ConstructionSigned-offSTRUCTURETECH NY06/25/2021
DOB NOWConstruction FenceSigned-offSTRUCTURETECH NY04/26/2021
1 project · most recent 11/04/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/04/2025Permit IssuedSKEN SERVICES CORPAir Conditioning Systems, Heating Systems
Cooling
Heating
Rheem ×4
1 project · most recent 06/02/2023
FiledStatusContractorScope
06/02/2023——25 heads
2 projects · most recent 11/04/2025
Water/Sanitary Gas Storm Plumbing-Sprinkler
FiledStatusContractorScope
11/04/2025Permit IssuedJUST PLBG & HTG INCGas, Storm, Water/Sanitary
06/02/2023Permit IssuedJUST PLBG & HTG INCPlumbing-Sprinkler, Water/Sanitary
1 project · most recent 01/30/2025
FiledStatusContractorScope
01/30/2025Permit IssuedEVS ELECTRIC CORP2 meters, 2 new_meters
1 project · most recent 11/04/2025
Concrete Wood
FiledStatusContractorScope
11/04/2025Permit IssuedJUST PLBG & HTG INCConcrete, Wood
1 project · most recent 03/07/2025
Fence
FiledStatusContractorScope
03/07/2025Signed-offRTR CONSTRUCTION CO INCFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/15/2025Fail-Final CND-Occupancy InspectionFailView ↗
05/29/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/11/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
12/11/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
12/11/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
12/11/2025Wood – Prefabricated I-JoistsStanislav Pilipenkospecial
12/11/2025Subsurface Conditions – Fill Placement & In-Place DensityWILLIAM MONTAGUEspecial
12/11/2025Mechanical SystemsStanislav Pilipenkospecial
12/11/2025Subgrade InspectionsStanislav Pilipenkospecial
12/11/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
12/11/2025Structural Wood FrameStanislav Pilipenkoprogress
12/11/2025PreliminaryStanislav Pilipenkoprogress
12/11/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
12/11/2025Footing and FoundationStanislav Pilipenkoprogress
12/11/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
12/11/2025FinalStanislav Pilipenkoprogress
12/11/2025MeteringStanislav Pilipenkoenergy_progress
12/11/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
12/11/2025Maintenance informationStanislav Pilipenkoenergy_progress
12/11/2025Interior lighting powerStanislav Pilipenkoenergy_progress
12/11/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
12/11/2025Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
12/11/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
12/11/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
12/11/2025Permanent certificateStanislav Pilipenkoenergy_progress
12/11/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
12/11/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
12/11/2025Fenestration areasStanislav Pilipenkoenergy_progress
Latest 25 of 57.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026S00506286-I1Request digital key ↗
08/24/2026S00789822-I1Request digital key ↗
08/23/2026S00805066-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
08/09/2022540200147Open ↗
05/27/2021540200147Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/16/2022540200147Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026S00824824-P1Open ↗
08/13/2026S00824824-P2Open ↗
08/13/2026S00824824-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00824824-I1Open ↗
08/13/2026S00824824-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00824824-I1Open ↗
08/13/2026S00824824-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/27/2021540200147Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00824824-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026S00508241-I1Open ↗
08/20/2026S00508241-P1Open ↗
08/19/2026S00824824-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/30/2026S00824824-P1Open ↗
09/01/2026S00824824-P2Open ↗
09/01/2026S00824824-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026S00824824-P2Open ↗
09/01/2026S00824824-P2Open ↗
08/23/2026S00824824-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/27/2021540200147Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/27/2021540200147Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00824824-P1Open ↗
08/13/2026S00824824-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026S00824824-P1Open ↗
08/13/2026S00824824-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00824824-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00824824-I1Open ↗
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
05/27/2021540200147Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/16/2022540200147Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
05/27/2021540200147Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
08/16/2022540200147Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/27/2021540200147Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION2
03/16/2022540200147Open ↗
03/16/2022540200147Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00824824-I1Open ↗
08/13/2026S00824824-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00824824-I1Open ↗
08/13/2026S00824824-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026S00824824-P1Open ↗
08/19/2026S00824824-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
03/16/2022540200147Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/16/2022540200147Open ↗