← Back
Two stories - detached, small or mid-size
SHEFFIELD STREET
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5174917
💬 Discuss this project
2021Year Built
2Stories
A1Building Class
R3AZoning
1,764 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,305 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
Plumbing
Basement1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AGP ENTERPRISES1407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT209/20/2021
WILLIAM MONTAGUE ENGINEER101/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VIP EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AGP ENTERPRISES INCGeneral Contractor303/21/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
Building Lifecycle
All (13)Filed (3)Permit Issued (4)Signed Off (2)Inspection (4)
09/27/2021
Signed off — Alteration
PROPOSED INSTALLATION OF NEW 10' CURB CUT.
S00596996-I1
09/23/2021
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/21/2021
Permit issued — Curb Cut
S00596996-I1-CC
09/20/2021
Filed — Alteration
PROPOSED INSTALLATION OF NEW 10' CURB CUT.
S00596996-I1
09/09/2021
Signed off — Alteration
residential sprinkler plans
S00444462-I1
09/03/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/14/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2021
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/09/2021
Permit issued — Plumbing
S00444462-I1-PL
01/06/2021
Permit issued — Plumbing
S95208242-I1-PL
01/05/2021
Filed — Alteration
residential sprinkler plans
S00444462-I1
01/04/2021
Permit issued — Plumbing
S00429957-I1-PL
11/18/2020
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES & NEW GAS FIXTURES FOR 1 FAMILY RESIDENCE.
S00429957-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offAGP ENTERPRISES INC09/21/2021
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.06/09/2021
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC01/06/2021
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.01/04/2021
BIS—ISSUEDAGP ENTERPRISES INC11/23/2020
1 project · most recent 11/18/2020
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/18/2020Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 03/07/2021
General Wiring Lighting
FiledStatusContractorScope
03/07/2021CompleteGB ELECTRICAL CORP.General Wiring, Lighting
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/23/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
09/03/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/14/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/11/2021Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026S00429957-I1Request digital key ↗
08/25/2026S00444462-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026S00596996-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION7
07/22/2021540184717Open ↗
07/22/2021540184717Open ↗
07/16/2021540184717Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/29/2021540184717Open ↗
▸BISWORK PERMIT APPLICATION1
11/23/2020540184717Open ↗
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
11/23/2020540184717Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/21/2020540184717Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/01/2021540184717Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/21/2020540184717Open ↗
▸BISZONING DIAGRAM1
11/16/2020540184717Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/21/2020540184717Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026S00429957-I1Open ↗
08/25/2026S00596996-I1Open ↗
08/13/2026S00444462-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/21/2020540184717Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/21/2020540184717Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/21/2020540184717Open ↗
▸Trade Schedules & Equipment4
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
09/21/2020540184717Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/01/2021540184717Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/01/2021540184717Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
09/21/2020540184717Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN1
09/14/2021540184717Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/23/2020540184717Open ↗
▸BISSTREET TREE CHECKLIST1
09/21/2020540184717Open ↗
▸BISSTREET TREE SIGNOFF1
09/14/2021540184717Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/20/2021540184717Open ↗
11/23/2020540184717Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/20/2021540184717Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/21/2020540184717Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/20/2021540184717Open ↗
11/23/2020540184717Open ↗
09/21/2020540184717Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
09/14/2021540184717Open ↗
11/23/2020540184717Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
09/21/2020540184717Open ↗
▸BISSOIL REPORT1
09/21/2020540184717Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE2
11/12/2020540184717Open ↗
11/13/2020540184717Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
08/23/2021540184717Open ↗
07/22/2021540184717Open ↗
07/16/2021540184717Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/21/2020540184717Open ↗
▸Other Documents2
▸BISSUSTAINABLE ROOF ZONE FORM1
11/16/2020540184717Open ↗
▸BISBPP: FILING REQUIRED1
09/21/2020540184717Open ↗