← Back
Two family frame
SHELDON AVENUE
STATEN ISLAND · BIN 5176929
💬 Discuss this project
2025Year Built
2Stories
B2Building Class
R3XZoning
2,700 sfGross Floor Area
2Units
Two family frame · Owner of record: SHELDON SI LLC · 4,000 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Floor 26p · 1 filing · 20 docs
Floor 15p · 2 filings · 20 docs
Basement4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DONATO2007/08/2026
MADONIA DEVELOPMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES V MORRI310/29/2025
A TECH ENGINEERING NYC, PLLC.208/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAMES V MORRI, RA203/21/2026
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MADONIA DEVELOPMENT CORPGeneral Contractor604/09/2026
DONATO, INCPlumbing207/08/2026
CATELLO ELEC'L CONT., INCElectrical103/22/2026
R&M PIPING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738101/15/2025
Building Lifecycle
All (53)Filed (5)Permit Issued (8)Signed Off (3)Inspection (11)Objection (2)Special Inspection (24)
11/13/2025
Signed off — Alteration
INSTALLATION OF FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01194171-I1
11/10/2025
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01158921-S2
11/07/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/30/2025
Permit issued — Curb Cut
S01158921-S2-CC
10/29/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01158921-S2
10/01/2025
Signed off — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01158921-S1
09/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/05/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
09/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/03/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
09/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/27/2025
Filed — Alteration
INSTALLATION OF FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01194171-P1
07/10/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/01/2025
Permit issued — Plumbing
S96479157-S1-PL
05/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/28/2025
Permit issued — Plumbing
S01194171-I1-PL
04/08/2025
Filed — Alteration
INSTALLATION OF FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01194171-I1
03/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/21/2025
Permit issued — Plumbing
S01158921-S1-PL
02/20/2025
Permit issued — General Construction
S01158921-I1-GC
02/20/2025
Permit issued — General Construction
S01158921-I1-FO
02/20/2025
Permit issued — Earth Work
S01158921-I1-EA
02/20/2025
Permit issued — Earth Work
S01158921-I1-ST
02/19/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01158921-S1
01/30/2025
Objection resolved — Addressed
01/24/2025
Objection raised — Scope
01/15/2025
Filed — New Building
INSTALLATION OF NEW STORM PIPING, WATER/SANITARY PLUMBING WORK SUBSEQUENT FILING TO GENERAL CONSTRUCTION (GC) FILING.
S01158921-I1
01/07/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
12/23/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
12/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/23/2024
Special inspection requirement — Subgrade Inspections
anthony santoro
12/23/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
12/23/2024
Special inspection requirement — Structural Wood Frame
anthony santoro
12/23/2024
Special inspection requirement — Permanent certificate
anthony santoro
12/23/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
12/23/2024
Special inspection requirement — Structural Steel - Details
anthony santoro
12/23/2024
Special inspection requirement — Lighting controls
anthony santoro
12/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
12/23/2024
Special inspection requirement — Air barrier — testing
anthony santoro
12/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
12/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
12/23/2024
Special inspection requirement — Lighting in dwelling units
anthony santoro
12/23/2024
Special inspection requirement — Fenestration areas
anthony santoro
12/23/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
12/23/2024
Special inspection requirement — Insulation placement and R values
anthony santoro
12/23/2024
Special inspection requirement — Maintenance information
anthony santoro
12/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
12/23/2024
Special inspection requirement — Metering
anthony santoro
12/20/2024
Special inspection requirement — Final
anthony santoro
12/20/2024
Special inspection requirement — Footing and Foundation
anthony santoro
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMADONIA DEVELOPMENT CORP10/30/2025
DOB NOWPlumbingSigned-offR&M PIPING & HTG INC07/01/2025
DOB NOWPlumbingSigned-offDONATO, INC04/28/2025
DOB NOWPlumbingSigned-offDONATO, INC03/21/2025
DOB NOWGeneral ConstructionPermit IssuedMADONIA DEVELOPMENT CORP02/20/2025
DOB NOWGeneral ConstructionSigned-offMADONIA DEVELOPMENT CORP02/20/2025
DOB NOWEarth WorkSigned-offMADONIA DEVELOPMENT CORP02/20/2025
DOB NOWEarth WorkSigned-offMADONIA DEVELOPMENT CORP02/20/2025
1 project · most recent 10/29/2025
Storm Water/Sanitary
FiledStatusContractorScope
10/29/2025Signed-offDONATO, INCStorm, Water/Sanitary
2 projects · most recent 09/09/2025
General Wiring
FiledStatusContractorScope
09/09/2025CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
03/20/2025CompleteCATELLO ELEC'L CONT., INC1 meters, 1 new_meters
1 project · most recent 10/29/2025
Steel Concrete Wood
FiledStatusContractorScope
10/29/2025Signed-offMADONIA DEVELOPMENT CORPSteel, Concrete, Wood
1 project · most recent 10/29/2025
Earthwork
FiledStatusContractorScope
10/29/2025Signed-offMADONIA DEVELOPMENT CORPEarthwork
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/07/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/05/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/03/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
09/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
01/07/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
12/23/2024Concrete - Cast-In-Placeanthony santorospecial
12/23/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
12/23/2024Subgrade Inspectionsanthony santorospecial
12/23/2024Energy Code Compliance Inspectionsanthony santoroprogress
12/23/2024Fire-Resistance Rated Constructionanthony santoroprogress
12/23/2024Structural Wood Frameanthony santoroprogress
12/23/2024Permanent certificateanthony santoroenergy_progress
12/23/2024Fenestration air leakageanthony santoroenergy_progress
12/23/2024Structural Steel - Detailsanthony santorospecial
12/23/2024Lighting controlsanthony santoroenergy_progress
12/23/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/23/2024Air barrier — testing anthony santoroenergy_progress
12/23/2024Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
12/23/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
12/23/2024Lighting in dwelling unitsanthony santoroenergy_progress
12/23/2024Fenestration areasanthony santoroenergy_progress
12/23/2024Air barrier - visual inspectionanthony santoroenergy_progress
12/23/2024Insulation placement and R valuesanthony santoroenergy_progress
12/23/2024Maintenance informationanthony santoroenergy_progress
12/23/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/23/2024Meteringanthony santoroenergy_progress
12/20/2024Finalanthony santoroprogress
12/20/2024Footing and Foundationanthony santoroprogress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026S01158921-S2Request digital key ↗
08/20/2026S01158921-I1Request digital key ↗
08/20/2026S01158921-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
01/03/2025540265648Open ↗
12/03/2024540265648Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/03/2024540265648Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/03/2025540265648Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01158921-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01158921-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01158921-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026S01194171-I1Open ↗
08/13/2026S01194171-P1Open ↗
08/13/2026S01158921-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S01158921-I1Open ↗
09/01/2026S01158921-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/03/2024540265648Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/03/2024540265648Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026S01158921-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01158921-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01158921-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S01158921-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01158921-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01158921-I1Open ↗
▸Inspections & Test Reports2
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
12/03/2024540265648Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/03/2024540265648Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
01/03/2025540265648Open ↗
01/03/2025540265648Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
12/03/2024540265648Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/03/2024540265648Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION2
01/03/2025540265648Open ↗
12/03/2024540265648Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
12/03/2024540265648Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/03/2025540265648Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
12/03/2024540265648Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01158921-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01158921-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01158921-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01158921-I1Open ↗