← Back
Elevator apt, fireproof without stores
SHORE FRONT PARKWAY
QUEENS · Rockaway Beach-Arverne-Edgemere · BIN 4590624
💬 Discuss this project
1974Year Built
19Stories
D3Building Class
R6Zoning
1,085,148 sfGross Floor Area
1,091Units
LL97 CoveredRent Stabilized559 Open Violations 554 unresolved · 5 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: HP ARVERNE PRESERVATION HOUSING COMPANY · 589,394 sf lot · 1.84 FAR built · Flood zone AE
Locations of Work
ArchitectureStructural
Floor 22p · 1 filing · 6 docs
Floor 11p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
C+C MANAGEMENT303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAND ENGINEERING & ARCHITECTURE DPC110/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JULIAN A. GOMEZ203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE RESTORATION INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266110/28/2024
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
02/09/2026
Signed off — Alteration
Q01070307-I1
02/19/2025
Permit issued — General Construction
Q01070307-I1-GC-CX
10/28/2024
Filed — Alteration
Q01070307-I1
09/13/2024
Special inspection requirement — Concrete - Cast-In-Place
James Vignola
09/13/2024
Special inspection requirement — Masonry
James Vignola
09/13/2024
Special inspection requirement — Post-installed Anchors
James Vignola
09/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Vignola
06/21/2024
Special inspection requirement — Final
James Vignola
12/19/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/19/2023
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC02/19/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/13/2024Concrete - Cast-In-PlaceJames Vignolaspecial
09/13/2024MasonryJames Vignolaspecial
09/13/2024Post-installed AnchorsJames Vignolaspecial
09/13/2024Structural Stability – Alterations of existing buildingsJames Vignolaspecial
06/21/2024FinalJames Vignolaprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01070307-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01070307-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q01070307-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01070307-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01070307-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q01070307-I1Open ↗