ECB12/03/2025WORK WITHOUT A PERMIT. OBSERVED NEWLY/RECENTLY INSTALLED SECOND FLOOR ADDITION AT REAR OF HOUSE, NEWLY/RECENTLY INSTALLED WOOD FRAME AT EXPOSURE#2,3,AND 4. NO PERMITS ON FILE, OBTAIN PERMIT; OBTAIN ALL PERMITS$2K due
ECB12/03/2025WORK WITHOUT A PERMIT. OBSERVED NEWLY/RECENTLY INSTALLED BLOCK FOUNDATION AT EXPOSURE#2,3 AND 4. NO PERMITS ON FILE., OBTAIN PERMIT; OBTAIN ALL PERMITS$2K due
DOB07/21/2025BASED ON LIC # 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB #X00281955 IMMEDIATELY.
ECB01/11/2005FAILURE TO PROVIDE 8 FOOT HIGH FENCE WHERE REQUIRED DURING EXCAVATION OPERATIONS.REMEDY:"STOP ALL WORK" IMMEDIATELY EXCEPT TO INSTALL PROTECTIVE FENCE AROUND ENTIRE SITE W/CONSTRUCTION GATE.$-10 due
ECB11/27/2023AT THE TIME OF INSPECTION I OBSERVED OUTSIDE THE LEFT SIDE OF THE HOUSE EXPOSED ELECTRICAL SERVICE WIRES NOT SAFELY SECURED HANGING OFF A METAL SCAFFOLD WHICH CAN BE ENERGIZED BY THE WIRE IF DAMAGED, COMPLY WITNothing owed — awaiting certificate of correction
ECB11/27/2023AT THE TIME OF INSPECTION I OBSERVED REMOVAL/DEMO OF ALL LIGHT FIXTURES, OUTLETS, SWITCHES, AND BRANCH WIRING THROUGHOUT THE ENTIRE HOUSE. ALSO NEW INSTALLATION OF TEMPORARY WIRING OUTLETS AND SWITCH. NO APPLICNothing owed — awaiting certificate of correction
ECB01/24/2005WORK WITHOUT PERMIT DEMOLISHED ENTIRE HOUSE AT SIDE INCLUDING FOUNDATION "STOP ALL WORK" REMEDY:OBTAIN ALL NECESSARY PERMITS.Nothing owed — awaiting certificate of correction
ECB01/24/2005FAILURE TO PROVIDE 8 HIGH FENCE WERE REQUIRED DURING EXCAVATION OPERATIONS 2'BY 4' & BLUE TARP ARE NOT DEPT STANDARDS. "STOP ALL WORK" REMEDY:STOP ALL WORK IMMEDIATELY EXCEPT TO PROVIDE FENCE.Nothing owed — awaiting certificate of correction
ECB01/24/2005FAILURE TO POST CONSTRUCTION SIGN REMEDY:PROVIDE CONSTRUCTION SIGNNothing owed — awaiting certificate of correction
ECB01/11/2005WORK WITHOUT PERMIT.REMOVED ENTIRE BUILDING & FOUNDATION WITHOUT A DEMOLITION PERMIT."STOP ALL WORK".REMEDY:OBTAIN PERMITS IF FEASIBLE.Nothing owed — awaiting certificate of correction
ECB01/11/2005FAILURE TO POST CONTRACTORS SIGN. REMEDY:PROVIDE CONTRACTORS SIGN.Nothing owed — awaiting certificate of correction
ECB06/12/2000WORK DOES NOT CONFORM TO APPROVED PLANS. NON-CONFORMING WORK NOTED: ENTIRE BUIDING DEMOLISHED CONTRARY TO ALTERATION NUMBER 200607129. REMEDY: STOP ALL WORK EXCEPT FOR WORK NECESSARY TO MAKE SITE SAFE ,AMEND PLNothing owed — awaiting certificate of correction
ECB04/21/2000NO JOB SITE FENCE. BUILDING DEMOLISHED APPROX 6,400 CUBIC HOLE REMAINSREMEDY: IMMEDIATELY PROVIDE FENCE.Nothing owed — awaiting certificate of correction
ECB04/21/2000WORK DOES NOT CONFORM TO APPROVED PLNS. NONCONFORMING WORK NOTED DEMOLISHED ENTIRE BUILDING CONTRARY TO ALTERATION NUMBER 200607129. REMEDY:AMEND PLANS AND PERMIT.Nothing owed — awaiting certificate of correction