← Back
Bungalow colony - cooperatively owned land
SILVER BEACH
BRONX · Throgs Neck-Schuylerville · BIN 2100605
💬 Discuss this project
1921Year Built
2.5Stories
A8Building Class
R4AZoning
38,167 sfGross Floor Area
35Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Bungalow colony - cooperatively owned land · Owner of record: SILVER BEACH GARDENS CORPORATION · 117,720 sf lot · 0.32 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/30/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/30/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/13/2026
Signed off — Alteration
X01394772-I1
05/06/2026
Permit issued — Solar
X01394772-I1-SL
04/30/2026
Filed — Alteration
X01394772-I1
04/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/30/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/29/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/06/2026
1 project · most recent 06/17/2026
FiledStatusContractorScope
06/17/2026CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/30/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/30/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/29/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/29/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/29/2026FinalWalid Abdullaprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026X01394772-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026X01394772-I1Open ↗
08/22/2026X01394772-I1Open ↗
08/22/2026X01394772-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026X01394772-I1Open ↗
08/22/2026X01394772-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026X01394772-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026X01394772-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026X01394772-I1Open ↗