← Back
Bungalow colony - cooperatively owned land
SILVER BEACH
BRONX · BIN 2101116
💬 Discuss this project
1921Year Built
3Stories
A8Building Class
R4AZoning
265,860 sfGross Floor Area
208Units
13 Open Violations 3 unresolved · 10 paperwork only ▸
Bungalow colony - cooperatively owned land · Owner of record: SILVER BEACH GARDENS CORP · 2,407,000 sf lot · 0.11 FAR built
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/29/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor108/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/29/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
08/03/2026
Permit issued — Solar
X01436857-I1-SL
07/29/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01436857-I1
07/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/29/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/27/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC08/03/2026
1 project · most recent 07/29/2026
FiledStatusContractorScope
07/29/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
1 project · most recent 07/29/2026
FiledStatusContractorScope
07/29/2026Permit IssuedSUNRUN INSTALLATION SVC57 panels, 25.65 kw, 399.43 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/29/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/29/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/27/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/27/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/27/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026X01436857-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/19/2026X01436857-I1Open ↗
09/19/2026X01436857-I1Open ↗
09/19/2026X01436857-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/19/2026X01436857-I1Open ↗
09/19/2026X01436857-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026X01436857-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026X01436857-I1Open ↗