← Back
Bungalow colony - cooperatively owned land
SILVER BEACH
BRONX · BIN 2103057
💬 Discuss this project
1921Year Built
3Stories
A8Building Class
R4AZoning
265,860 sfGross Floor Area
208Units
13 Open Violations 3 unresolved · 10 paperwork only ▸
Bungalow colony - cooperatively owned land · Owner of record: SILVER BEACH GARDENS CORP · 2,407,000 sf lot · 0.11 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC105/07/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272105/07/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/17/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01398248-I1
05/15/2026
Permit issued — Solar
X01398248-I1-SL
05/07/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01398248-I1
05/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/07/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/06/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/15/2026
1 project · most recent 05/07/2026
FiledStatusContractorScope
05/07/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 05/07/2026
FiledStatusContractorScope
05/07/2026Signed-offSUNRUN INSTALLATION SVC17 panels, 7.65 kw, 357 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/07/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/07/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
05/06/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/06/2026Energy Code Compliance InspectionsWalid Abdullaprogress
05/06/2026FinalWalid Abdullaprogress
▾Documents — 5 on file (BIS + DOB NOW)
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026X01398248-I1Open ↗
08/23/2026X01398248-I1Open ↗
08/23/2026X01398248-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026X01398248-I1Open ↗
08/23/2026X01398248-I1Open ↗