Bungalow colony - cooperatively owned land
SILVER BEACH
BRONX · BIN 2103074
💬 Discuss this project
1921Year Built
3Stories
A8Building Class
R4AZoning
265,860 sfGross Floor Area
208Units
13 Open Violations 3 unresolved · 10 paperwork only ▸
Bungalow colony - cooperatively owned land · Owner of record: SILVER BEACH GARDENS CORP · 2,407,000 sf lot · 0.11 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC102/25/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272102/25/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/08/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01363588-I1
03/03/2026
Permit issued — Solar
X01363588-I1-SL
02/25/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01363588-I1
02/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
02/25/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
02/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
02/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
02/24/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC03/03/2026
2 projects · most recent 04/15/2026
General Wiring
FiledStatusContractorScope
04/15/2026Permit IssuedSUNRUN SOLAR ELECTL CORPGeneral Wiring
02/24/2026CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/25/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
02/25/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
02/24/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
02/24/2026Energy Code Compliance InspectionsWalid Abdullaprogress
02/24/2026FinalWalid Abdullaprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026X01363588-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026X01363588-I1Open ↗
08/29/2026X01363588-I1Open ↗
08/29/2026X01363588-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026X01363588-I1Open ↗
08/29/2026X01363588-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026X01363588-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026X01363588-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026X01363588-I1Open ↗