Adult care facility
Casa Celina
THIERIOT AVENUE · BIN 2130473
💬 Discuss this project
2022Year Built
16Stories
I7Building Class
R5Zoning
136,032 sfGross Floor Area
205Units
LL97 CoveredRent Stabilized5 Open Violations ▸
Adult care facility · Owner of record: NYC HOUSING AUTHORITY · 12,613 sf lot · 10.79 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof1p · 1 filing · 15 docs
Bulkhead5p · 4 filings · 20 docs
Floor 165p · 4 filings · 20 docs
Floor 156p · 4 filings · 20 docs
Floor 145p · 3 filings · 20 docs
Floor 135p · 3 filings · 20 docs
Floor 125p · 3 filings · 20 docs
Floor 115p · 3 filings · 20 docs
Floor 105p · 3 filings · 20 docs
Floor 95p · 3 filings · 20 docs
Floor 85p · 3 filings · 20 docs
Floor 75p · 3 filings · 20 docs
Floor 64p · 3 filings · 20 docs
Floor 54p · 3 filings · 20 docs
Floor 44p · 3 filings · 20 docs
Floor 34p · 3 filings · 20 docs
Floor 24p · 3 filings · 20 docs
Floor 13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELH CONSTRUCTION7507/08/2026
OWNERS REP1707/08/2026
NYC HOUSING AUTHORITY103/22/2026
MOUNTCO CONSTRUCTION & DE103/22/2026
NYC HOUSING AUTHORITY 9103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAGHER ENGINEERING PLLC1510/10/2024
PAUL PERDEK, PROF. ENG. PLLC605/18/2023
KN3 ENGINEERING LLC101/31/2022
LONG ISLAND CONCRETE101/28/2022
DE NARDIS ENGINEERING, LLC207/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1403/21/2026
CORE CONSULTANTS NYC1103/21/2026
RPO203/21/2026
RIGGING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor1907/08/2026
BLETSAS PLBNG & HTG CORPFire Protection1207/08/2026
BLETSAS PLBNG & HTG CORPPlumbing407/08/2026
AURA PLUMBING INCFire Protection207/08/2026
AURA PLUMBINGGeneral Contractor203/22/2026
KING FREEZE MECHANICAL COGeneral Contractor207/08/2026
PANILI PLUMBING & HTG LLCPlumbing107/08/2026
LONG ISLAND CONCRETE INCGeneral Contractor107/08/2026
MOUNTCO CONST. & DEV.CORPGeneral Contractor103/22/2026
GRID CITY ELECTRIC, CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS ENGINEERING3745110/16/2024
PSI AGENCY INC.2542210/10/2024
LEO Y LEE ASSOCIATES2481108/24/2022
Building Lifecycle
All (186)Filed (26)Permit Issued (32)Signed Off (10)Violation (17)Inspection (11)Objection (60)Special Inspection (30)
06/22/2026
Violation issued (HPD, open)
B
06/22/2026
Violation issued (HPD, open)
B
06/22/2026
Violation issued (HPD, open)
B
11/18/2025
Violation issued (HPD, closed)
I
05/19/2025
Signed off — Alteration
SPRINKLER/STANDPIPE IN CONJUNCTION WITH NEW BUILDING JOB NUMBER 210181079
X00367541-I1
05/15/2025
Signed off — Alteration
PLUMBING IS IN CONJUNCTION WITH NEW BUILDING JOB NUMBER# 210181079
X00367515-I1
04/28/2025
Violation issued (HPD, closed)
B
04/28/2025
Violation issued (HPD, closed)
B
04/04/2025
Inspection — Pass-Final SD - More than 10 Requested Floors
Pass
View inspection ↗
04/04/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2025
Signed off — Alteration
MECHANICAL IS IN CONJUNCTION WITH NEW BUILDING JOB NUMBER# 210181079
X00367497-I1
03/26/2025
Permit issued — Sprinklers
X00367541-I1-EW-SD
03/24/2025
Violation issued (ECB, closed)
Construction
02/19/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2025
Permit issued — Plumbing
X00367515-I1-PL
01/30/2025
Permit issued — Sprinklers
X00367541-I1-EW-SP
12/16/2024
Violation issued (HPD, closed)
B
12/11/2024
Signed off — Alteration
X01116379-I1
12/08/2024
Violation issued (HPD, closed)
A
11/04/2024
Permit issued — Suspended Scaffold
X01116379-I1-SC
10/18/2024
Violation issued (HPD, closed)
A
10/18/2024
Violation issued (HPD, closed)
A
10/16/2024
Filed — Alteration
X01116379-I1
10/10/2024
Filed — Alteration
SPRINKLER/STANDPIPE IN CONJUNCTION WITH NEW BUILDING JOB NUMBER 210181079
X00367541-P5
09/30/2024
Violation issued (HPD, closed)
B
09/09/2024
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
09/09/2024
Special inspection requirement — Standpipe Systems
MAURICIO ANDRADE
09/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
08/13/2024
Violation issued (HPD, closed)
C
05/17/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MAURICIO ANDRADE
05/17/2024
Special inspection requirement — HVAC and service water heating equipment
MAURICIO ANDRADE
05/17/2024
Special inspection requirement — HVAC and service water heating system controls
MAURICIO ANDRADE
05/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/17/2024
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
05/17/2024
Special inspection requirement — HVAC insulation and sealing
MAURICIO ANDRADE
05/17/2024
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
05/17/2024
Special inspection requirement — Electrical motors
MAURICIO ANDRADE
05/14/2024
Filed — Alteration
PLUMBING IS IN CONJUNCTION WITH NEW BUILDING JOB NUMBER# 210181079
X00367515-P5
05/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/09/2024
Special inspection requirement — Electrical motors
MAURICIO ANDRADE
05/09/2024
Special inspection requirement — HVAC insulation and sealing
MAURICIO ANDRADE
05/09/2024
Special inspection requirement — HVAC and service water heating equipment
MAURICIO ANDRADE
05/09/2024
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
05/09/2024
Special inspection requirement — HVAC and service water heating system controls
MAURICIO ANDRADE
05/09/2024
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
05/09/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MAURICIO ANDRADE
02/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00543186-I1
02/26/2024
Signed off — Alteration
X00543382-I1
02/26/2024
Signed off — Alteration
X00796608-I1
02/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00543088-I1
11/03/2023
Signed off — Alteration
TEMPORARY STANDPIPE IN CONJUNCTION WITH NEW BUILDING application job number 210181079
X00367558-I1
10/20/2023
Special inspection requirement — Electrical motors
MAURICIO ANDRADE
10/20/2023
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
10/20/2023
Special inspection requirement — Emergency and Standby Power Systems (Generator)
MAURICIO ANDRADE
10/20/2023
Special inspection requirement — Electrical energy consumption
MAURICIO ANDRADE
10/20/2023
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
10/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
10/20/2023
Special inspection requirement — Final
MAURICIO ANDRADE
10/18/2023
Filed — Alteration
SPRINKLER/STANDPIPE IN CONJUNCTION WITH NEW BUILDING JOB NUMBER 210181079
X00367541-P4
10/18/2023
Filed — Alteration
MECHANICAL IS IN CONJUNCTION WITH NEW BUILDING JOB NUMBER# 210181079
X00367497-P3
Latest 60 of 186 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAURA PLUMBING INC03/26/2025
DOB NOWPlumbingSigned-offPANILI PLUMBING & HTG LLC01/30/2025
DOB NOWSprinklersSigned-offAURA PLUMBING INC01/30/2025
DOB NOWSuspended ScaffoldSigned-offEASI CAULKING INC11/04/2024
DOB NOWSprinklersSigned-offBLETSAS PLBNG & HTG CORP10/06/2023
DOB NOWPlumbingSigned-offBLETSAS PLBNG & HTG CORP10/06/2023
DOB NOWStandpipeSigned-offBLETSAS PLBNG & HTG CORP10/06/2023
DOB NOWSprinklersSigned-offBLETSAS PLBNG & HTG CORP10/06/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/17/2023
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC06/14/2023
DOB NOWMechanical SystemsSigned-offKING FREEZE MECHANICAL CO04/19/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC01/31/2023
DOB NOWSprinklersSigned-offBLETSAS PLBNG & HTG CORP10/06/2022
DOB NOWPlumbingSigned-offBLETSAS PLBNG & HTG CORP10/06/2022
DOB NOWStandpipeSigned-offBLETSAS PLBNG & HTG CORP10/06/2022
DOB NOWSprinklersSigned-offBLETSAS PLBNG & HTG CORP10/06/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC09/19/2022
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC06/21/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/21/2022
DOB NOWMechanical SystemsSigned-offKING FREEZE MECHANICAL CO06/03/2022
DOB NOWSupport of ExcavationSigned-offLONG ISLAND CONCRETE INC02/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC01/31/2022
DOB NOWStandpipeSigned-offBLETSAS PLBNG & HTG CORP10/18/2021
DOB NOWPlumbingSigned-offBLETSAS PLBNG & HTG CORP10/15/2021
DOB NOWStandpipeSigned-offBLETSAS PLBNG & HTG CORP10/13/2021
DOB NOWStandpipeSigned-offBLETSAS PLBNG & HTG CORP10/13/2021
DOB NOWSprinklersSigned-offBLETSAS PLBNG & HTG CORP08/20/2021
DOB NOWStandpipeSigned-offBLETSAS PLBNG & HTG CORP08/20/2021
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC06/24/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/24/2021
DOB NOWStandpipeSigned-offBLETSAS PLBNG & HTG CORP06/23/2021
DOB NOWPlumbingSigned-offBLETSAS PLBNG & HTG CORP06/21/2021
BISOTISSUEDMOUNTCO CONST. & DEV.CORP04/16/2024
BISOTISSUED770 ELECTRIC CORP03/29/2024
BIS—ISSUEDMOUNTCO CONST. & DEV.CORP03/26/2024
BIS—ISSUEDMOUNTCO CONST. & DEV.CORP03/22/2023
BIS—ISSUEDMOUNTCO CONST. & DEV.CORP05/12/2022
BIS—ISSUEDMOUNTCO CONST. & DEV.CORP06/25/2021
BIS—ISSUEDMOUNTCO CONST. & DEV.CORP06/25/2021
13 projects · most recent 06/02/2026
General Wiring
FiledStatusContractorScope
06/02/2026CompleteS. J. ELECTRIC INC.General Wiring
06/21/2024CompleteS. J. ELECTRIC INC.General Wiring
10/27/2023CompleteCORPORATE ELEC. GROUP INC—
07/25/2023CompleteGRID CITY ELECTRIC, CORP141 meters, 1 new_meters
03/30/2023CancelledGRID CITY ELECTRIC, CORP141 meters, 1 new_meters
09/21/2022CompleteCORPORATE ELEC. GROUP INC—
05/04/2022CompleteS. J. ELECTRIC INC.—
05/02/2022CompleteS. J. ELECTRIC INC.—
05/02/2022CompleteS. J. ELECTRIC INC.—
05/02/2022CompleteS. J. ELECTRIC INC.—
03/16/2022CompleteS. J. ELECTRIC INC.1 meters, 1 new_meters
01/19/2022CompleteV. VASS ELECTRIC CORP—
06/18/2021CompleteV. VASS ELECTRIC CORP—
1 project · most recent 07/23/2021
Steel Concrete
FiledStatusContractorScope
07/23/2021——Steel, Concrete
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/04/2025Pass-Final SD - More than 10 Requested FloorsPassView ↗
04/04/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/19/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/02/2023Pass-Final SD - More than 10 Requested FloorsPassView ↗
10/02/2023Pass-Final SP - More than 10 Requested FloorsPassView ↗
09/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/26/2023Pass-Final SD - Fire PumpPassView ↗
07/21/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/29/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/29/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/31/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
09/09/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/09/2024Sprinkler SystemsMAURICIO ANDRADEspecial
09/09/2024Standpipe SystemsMAURICIO ANDRADEspecial
05/17/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMAURICIO ANDRADEspecial
05/17/2024HVAC and service water heating system controls MAURICIO ANDRADEenergy_progress
05/17/2024Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
05/17/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/17/2024HVAC insulation and sealing MAURICIO ANDRADEenergy_progress
05/17/2024Maintenance informationMAURICIO ANDRADEenergy_progress
05/17/2024HVAC and service water heating equipment MAURICIO ANDRADEenergy_progress
05/17/2024Electrical motorsMAURICIO ANDRADEenergy_progress
05/09/2024HVAC and service water heating equipment MAURICIO ANDRADEenergy_progress
05/09/2024HVAC insulation and sealing MAURICIO ANDRADEenergy_progress
05/09/2024Electrical motorsMAURICIO ANDRADEenergy_progress
05/09/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/09/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMAURICIO ANDRADEspecial
05/09/2024Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
05/09/2024HVAC and service water heating system controls MAURICIO ANDRADEenergy_progress
05/09/2024Maintenance informationMAURICIO ANDRADEenergy_progress
10/20/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
10/20/2023Emergency and Standby Power Systems (Generator)MAURICIO ANDRADEspecial
10/20/2023Mechanical SystemsMAURICIO ANDRADEspecial
10/20/2023Electrical motorsMAURICIO ANDRADEenergy_progress
10/20/2023Electrical energy consumptionMAURICIO ANDRADEenergy_progress
10/20/2023Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
Latest 25 of 62.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Casa Celina Senior HousingResidentialFloors 1–16
Project X00367497 Alteration · LOC Issued · 07/30/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 364 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch9
08/25/2026X00543088-I1Request digital key ↗
08/25/2026X00543088-P2Request digital key ↗
08/25/2026X00543088-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Standpipe6
08/26/2026X00367541-P1Request digital key ↗
08/26/2026X00367541-P4Request digital key ↗
08/26/2026X00367541-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/26/2026X00367541-P4Request digital key ↗
08/15/2026X00367541-P1Request digital key ↗
08/15/2026X00367541-P5Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/26/2026X00367515-P5Request digital key ↗
08/26/2026X00367515-I1Request digital key ↗
08/26/2026X00367515-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/22/2026X00367497-P2Request digital key ↗
08/22/2026X00367497-P3Request digital key ↗
08/14/2026X00367497-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/15/2026X00367532-I1Request digital key ↗
08/15/2026X00367532-P1Request digital key ↗
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION27
02/26/2024210181079Open ↗
02/15/2024210181079Open ↗
10/10/2023240356002Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION8
04/26/2024240356002Open ↗
03/29/2024240356002Open ↗
03/27/2024210181079Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/16/2021210181079Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
01/13/2022210181079Open ↗
05/06/2021210181079Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/04/2021210181079Open ↗
▸BISVERIFY TAX LOT1
04/01/2025210181079Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/31/2023210181079Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/04/2021210181079Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
04/01/2025210181079Open ↗
▸Seals & Professional Certifications94
▸DOB NOWProgress Inspector Seal & Signature33
09/02/2026X00367497-P2Open ↗
09/02/2026X00367497-P2Open ↗
09/02/2026X00367497-P2Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/02/2026X00367497-P2Open ↗
09/02/2026X00367497-P2Open ↗
09/01/2026X00367541-P5Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/26/2026X00367558-I1Open ↗
08/26/2026X00367541-P2Open ↗
08/26/2026X00367541-P5Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/10/2023240356404Open ↗
09/19/2023240354200Open ↗
10/01/2020240277455Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/10/2023240356404Open ↗
09/19/2023240354200Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
10/13/2023240356002Open ↗
10/01/2020240277455Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/10/2023240356404Open ↗
09/19/2023240354200Open ↗
▸Trade Schedules & Equipment4
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
07/23/2024210181079Open ↗
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
03/10/2021210181079Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/28/2023210181079Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
08/28/2023210181079Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
05/04/2021210181079Open ↗
05/04/2021210181079Open ↗
03/09/2021240277455Open ↗
▸BISSTREET TREE SIGNOFF3
04/01/2025240277455Open ↗
04/01/2025240277455Open ↗
04/01/2025210181079Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/22/2021210181079Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/09/2021240277455Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
03/29/2024240356002Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
04/17/2024240356002Open ↗
03/29/2024240356002Open ↗
10/13/2023240356002Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/29/2025210181079Open ↗
04/17/2024240356002Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00367497-I1Open ↗
08/13/2026X00367515-I1Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
06/19/2023210181079Open ↗
▸BISFENESTRATION AREAS1
06/19/2023210181079Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
06/19/2023210181079Open ↗
▸BISLIGHTING IN DWELLING UNITS1
09/19/2023210181079Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/19/2023210181079Open ↗
▸BISLIGHTING CONTROLS1
10/16/2023210181079Open ↗
▸Inspections & Test Reports33
▸BISTECHNICAL REPORT: RESPONSIBILITY19
04/17/2024240356002Open ↗
03/29/2024240356002Open ↗
10/13/2023240356002Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
04/28/2021210181079Open ↗
03/24/2021210181079Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
06/17/2021210181079Open ↗
06/17/2021210181079Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
06/19/2023210181079Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/19/2023210181079Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/19/2023210181079Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
06/19/2023210181079Open ↗
▸BISMASONRY1
06/19/2023210181079Open ↗
▸BISPOST-INSTALLED ANCHORS1
06/19/2023210181079Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
06/19/2023210181079Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
06/19/2023210181079Open ↗
▸BISSOIL REPORT1
03/24/2021210181079Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/17/2021210181079Open ↗
▸Approvals, Objections & Sign-offs60
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
08/26/2026X00367515-I1Open ↗
08/26/2026X00367515-P5Open ↗
08/26/2026X00367515-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)16
08/22/2026X00367497-P2Open ↗
08/14/2026X00367497-I1Open ↗
08/13/2026X00367541-P5Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
03/27/2024210181079Open ↗
03/27/2024210181079Open ↗
03/27/2024210181079Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
07/10/2023210181079Open ↗
06/23/2023210181079Open ↗
05/05/2021210181079Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER3
04/25/2024240356002Open ↗
03/24/2023210181079Open ↗
05/13/2022210181079Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
04/01/2025210181079Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
03/10/2021210181079Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
04/01/2025210181079Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00367558-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE3
03/24/2023210181079Open ↗
06/25/2021210181079Open ↗
06/25/2021210181079Open ↗
▸BISCOST AFFIDAVIT3
10/13/2023240356002Open ↗
10/10/2023240356404Open ↗
09/19/2023240354200Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/17/2024240356002Open ↗
▸Filing & Intake Forms30
▸BISADDITIONAL INFORMATION24
10/13/2023240356002Open ↗
10/13/2023240356002Open ↗
08/04/2023210181079Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/13/2023240356002Open ↗
10/10/2023240356404Open ↗
09/19/2023240354200Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
10/19/2021210181079Open ↗
04/28/2021210181079Open ↗
03/10/2021210181079Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
05/24/2021240277455Open ↗
03/09/2021240277455Open ↗
▸BISPLOT DIAGRAM2
03/24/2021210181079Open ↗
06/22/2020210181079Open ↗
▸BISVESTIBULES1
06/19/2023210181079Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
06/19/2023210181079Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01116379-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00666939-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01116379-I1Open ↗