← Back
Gas or electric utility
VIRGINIA AVENUE
STATEN ISLAND · BIN 5155405
💬 Discuss this project
0Year Built
—Stories
U2Building Class
R3-2Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Gas or electric utility · 11,250 sf lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 05/25/2022
FiledStatusContractorScope
05/25/2022Permit IssuedFUSIONTECH COMM DBA1 meters, 1 new_meters
2 jobs · most recent 08/10/2023
Concrete
FiledStatusContractorScope
08/10/2023Permit IssuedEBERHART CONSTRUCTION COConcrete
02/24/2023Permit IssuedEBERHART CONSTRUCTION COConcrete
Building Lifecycle
All (73)Filed (10)Permit Issued (17)Signed Off (5)Violation (4)Inspection (5)Objection (2)Special Inspection (30)
08/01/2025
Signed off — Alteration
INSTALLATION OF EQUIPMENT PADS FOR THE PURPOSES OF PROVIDING AN EXTENSION FOR THE EXISTING BATTERY STORAGE AND CONTROL ROOM ENCLOSURE. MORE SPECIFIC AREA OF WORK AS SHOWN ON BLOWN UP PORTION OF TITLE PAGE, T-453.00.
S00973943-I1
03/24/2025
Signed off — Alteration
Contsruct fire protection deluge spray around new TESLA Megapack Energy Storage System. Construction & nozzle count to be depicted by drawings submitted with the permit application: T-135.00, M-136.00, M-137.00 and M-138.00. PAA initiated, see comments.
S00649421-I1
03/07/2025
Filed — Alteration
Contsruct fire protection deluge spray around new TESLA Megapack Energy Storage System. Construction & nozzle count to be depicted by drawings submitted with the permit application: T-135.00, M-136.00, M-137.00 and M-138.00. PAA initiated, see comments.
S00649421-P1
03/03/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
03/03/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
11/07/2024
Permit issued — Structural
S00973943-I1-GC-CX
03/19/2024
Permit issued — Foundation
S00822304-I1-GC-CX
01/26/2024
Filed — Alteration
INSTALLATION OF EQUIPMENT PADS FOR THE PURPOSES OF PROVIDING AN EXTENSION FOR THE EXISTING BATTERY STORAGE AND CONTROL ROOM ENCLOSURE. MORE SPECIFIC AREA OF WORK AS SHOWN ON BLOWN UP PORTION OF TITLE PAGE, T-453.00.
S00973943-I1
12/12/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
MARK STIER
12/12/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
12/08/2023
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
12/08/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
09/07/2023
Signed off — Alteration
Construct foundations for electrical equipment and equipment enclosures.
S00715187-I1
08/21/2023
Permit issued — Structural
S00822251-I1-ST
08/21/2023
Permit issued — Foundation
S00822251-I1-FO
08/21/2023
Permit issued — Foundation
S00822251-I1-GC
08/17/2023
Permit issued — Foundation
S00715187-I1-ST
08/10/2023
Filed — Alteration
Construct equipment foundations for electrical equipment and enclosure at Con Edison's Fox Hills Substation, + GRATINGS (phase II) THIS PAA APPLICATION IS BEING SUBMITTED FOR THE PURPOSES OF REMOVING THE EXCAVATION INSPECTION THAT WAS ORIGINALLY REQUESTE
S00822251-P1
08/10/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
MARK STIER
08/10/2023
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
08/10/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
08/10/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
08/10/2023
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
08/10/2023
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
08/10/2023
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/10/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
08/02/2023
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
08/02/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
08/02/2023
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/02/2023
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
08/02/2023
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
08/02/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
08/02/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
MARK STIER
08/02/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
05/02/2023
Filed — Alteration
Construct foundations for electrical equipment and equipment enclosures.
S00715187-P1
05/01/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
04/28/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/28/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/25/2023
Signed off — Alteration
Regrade area of work;, construct paved driveway to provide access to battery storage area; install security fence around perimeter of battery megapack structure; and construct concrete equipment pads for battery megapack structure and associated equipment
S00651401-I1
03/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Underground
Certified
View inspection ↗
03/06/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
02/27/2023
Filed — Alteration
Construct equipment foundations for electrical equipment and enclosure at Con Edison's Fox Hills Substation, + GRATINGS (phase II) THIS PAA APPLICATION IS BEING SUBMITTED FOR THE PURPOSES OF REMOVING THE EXCAVATION INSPECTION THAT WAS ORIGINALLY REQUESTE
S00822251-I1
02/24/2023
Filed — Alteration
Construct equipment foundations for electrical equipment and enclosure at Con Edison's Fox Hills Substation, PHASE III
S00822304-I1
02/04/2023
Violation issued (FDNY_NOV, closed)
12/06/2022
Permit issued — Structural
S00715187-I1-FO
12/02/2022
Permit issued — Structural
S00715187-I1-GC
09/28/2022
Permit issued — Sprinklers
S00649421-I1-EW-SP
08/05/2022
Violation issued (FDNY_NOV, closed)
07/08/2022
Permit issued — Foundation
S00715187-I1-FO
07/08/2022
Permit issued — General Construction
S00715187-I1-ST
07/08/2022
Permit issued — General Construction
S00715187-I1-GC
06/22/2022
Permit issued — General Construction
S00651401-I1-GC
Latest 60 of 73 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSOLIDATED EDISON COMPANY6107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSOLIDATED EDISON203/07/2025
CON EDISON701/26/2024
LANGAN ENGINEERING105/06/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSOLIDATED EDISON903/21/2026
RPO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EBERHART CONSTRUCTION COGeneral Contractor2107/08/2026
GIANFIA CORPGeneral Contractor603/21/2026
POSILLICO CIVIL INCGeneral Contractor403/21/2026
JCC CONSTRUCTION CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061103/07/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offEBERHART CONSTRUCTION CO11/07/2024
DOB NOWFoundationPermit IssuedEBERHART CONSTRUCTION CO03/19/2024
DOB NOWStructuralPermit IssuedEBERHART CONSTRUCTION CO08/21/2023
DOB NOWFoundationPermit IssuedEBERHART CONSTRUCTION CO08/21/2023
DOB NOWFoundationPermit IssuedEBERHART CONSTRUCTION CO08/21/2023
DOB NOWFoundationSigned-offEBERHART CONSTRUCTION CO08/17/2023
DOB NOWStructuralSigned-offEBERHART CONSTRUCTION CO12/06/2022
DOB NOWStructuralSigned-offEBERHART CONSTRUCTION CO12/02/2022
DOB NOWSprinklersSigned-offJCC CONSTRUCTION CORP09/28/2022
DOB NOWFoundationSigned-offEBERHART CONSTRUCTION CO07/08/2022
DOB NOWGeneral ConstructionSigned-offEBERHART CONSTRUCTION CO07/08/2022
DOB NOWGeneral ConstructionSigned-offEBERHART CONSTRUCTION CO07/08/2022
DOB NOWGeneral ConstructionSigned-offGIANFIA CORP06/22/2022
DOB NOWGeneral ConstructionSigned-offGIANFIA CORP06/22/2022
DOB NOWFoundationSigned-offGIANFIA CORP06/22/2022
DOB NOWStructuralSigned-offPOSILLICO CIVIL INC03/29/2021
DOB NOWStructuralSigned-offPOSILLICO CIVIL INC05/15/2020
BISOTISSUEDPOSILLICO CIVIL INC10/15/2020
BISOTISSUEDPOSILLICO CIVIL INC07/20/2020
BISOTISSUEDPOSILLICO CIVIL INC07/16/2020
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/28/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/06/2023Certified Sprinkler-SP-Piping Dry/Wet-UndergroundCertifiedView ↗
03/06/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
03/03/2025Sprinkler SystemsGEORGE GHEBRYALspecial
03/03/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
12/12/2023Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
12/12/2023Subsurface Investigations (Borings/Test Pits)MARK STIERspecial
12/12/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
12/12/2023Post-installed AnchorsGEORGE GHEBRYALspecial
12/12/2023Structural Steel - DetailsGEORGE GHEBRYALspecial
12/12/2023Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
12/12/2023Structural Steel - WeldingGEORGE GHEBRYALspecial
12/12/2023Subgrade InspectionsGEORGE GHEBRYALspecial
12/12/2023Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
12/08/2023Footing and FoundationGEORGE GHEBRYALprogress
12/08/2023FinalGEORGE GHEBRYALprogress
08/10/2023Subsurface Investigations (Borings/Test Pits)MARK STIERspecial
08/10/2023Subgrade InspectionsGEORGE GHEBRYALspecial
08/10/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
08/10/2023Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
08/10/2023Structural Steel - DetailsGEORGE GHEBRYALspecial
08/10/2023Footing and FoundationGEORGE GHEBRYALprogress
08/10/2023Post-installed AnchorsGEORGE GHEBRYALspecial
08/10/2023FinalGEORGE GHEBRYALprogress
08/02/2023Footing and FoundationGEORGE GHEBRYALprogress
08/02/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
08/02/2023Post-installed AnchorsGEORGE GHEBRYALspecial
08/02/2023Structural Steel - DetailsGEORGE GHEBRYALspecial
Latest 25 of 37.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/24/2026S00715187-I1Request digital key ↗
08/24/2026S00715187-P1Request digital key ↗
08/23/2026S00822304-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Structural1
08/26/2026S00333143-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
06/23/2020540176183Open ↗
04/24/2019520379796Open ↗
04/24/2019520379803Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
07/20/2020540176183Open ↗
07/16/2020540176183Open ↗
▸Seals & Professional Certifications42
▸DOB NOWSpecial Inspector Seal & Signature20
08/31/2026S00973943-I1Open ↗
08/31/2026S00973943-I1Open ↗
08/29/2026S00649421-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026S00651401-I1Open ↗
08/24/2026S00715187-P1Open ↗
08/24/2026S00715187-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/31/2026S00973943-I1Open ↗
08/29/2026S00649421-P1Open ↗
08/26/2026S00715187-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/23/2020540176183Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/23/2020540176183Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/23/2020540176183Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/24/2026S00715187-P1Open ↗
08/24/2026S00715187-I1Open ↗
08/23/2026S00822304-I1Open ↗
Showing 3 of 9 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/23/2020540176183Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026S00333143-I1Open ↗
▸Inspections & Test Reports14
▸DOB NOWSOIL REPORT5
08/13/2026S00822304-I1Open ↗
08/13/2026S00822251-P1Open ↗
08/13/2026S00651401-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram4
08/13/2026S00822251-I1Open ↗
08/13/2026S00973943-I1Open ↗
08/13/2026S00651401-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/22/2021540176183Open ↗
02/22/2021540176183Open ↗
06/23/2020540176183Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026S00651401-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00651401-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISFINAL1
06/24/2020540176183Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/24/2019520379796Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/22/2021540176183Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
02/22/2021540176183Open ↗
06/23/2020540176183Open ↗
04/24/2019520379796Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
04/24/2019520379796Open ↗
04/24/2019520379803Open ↗
04/26/2016520224659Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
06/23/2020540176183Open ↗
▸BISBOROUGH INTAKE FORM1