← Back
Zoned commercial or Manhattan residential
WILLETS POINT BLVD
QUEENS · BIN 4624797
💬 Discuss this project
0Year Built
—Stories
V1Building Class
C4-4Zoning
0 sfGross Floor Area
0Units
3 Open Violations 0 unresolved · 3 paperwork only ▸
Zoned commercial or Manhattan residential · Owner of record: NYC HOUSING PRESERVATION AND DEVELOPMENT · 38,152 sf lot · 0 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RELATED COMPANIES503/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIUMPH CONSTRUCTION CORPGeneral Contractor907/03/2026
ECD NY INCGeneral Contractor307/08/2026
L.L.G. PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LANGAN ENG, ENV, SURVEYIN1265308/15/2023
ATLANTIC ENGINEERINGLABOR1381108/03/2023
Building Lifecycle
All (23)Filed (5)Permit Issued (6)Signed Off (3)Inspection (5)Special Inspection (4)
08/29/2025
Permit issued — General Construction
Q00905352-I1-GC
11/20/2024
Signed off — Alteration
Q00905352-S1
10/24/2024
Signed off — Alteration
Q00902196-I1
10/01/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/19/2024
Permit issued — General Construction
Q00905352-I1-GC
04/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/28/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/11/2023
Permit issued — Plumbing
Q00905352-S1-PL
12/07/2023
Signed off — Alteration
Q00902001-I1
09/22/2023
Permit issued — General Construction
Q00905352-I1-GC
08/28/2023
Permit issued — Structural
Q00902196-I1-GC-CX
08/16/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Alan Poeppel
08/15/2023
Filed — Alteration
Q00902001-P1
08/03/2023
Filed — Alteration
Q00902196-I1
07/27/2023
Filed — Alteration
Q00905352-S1
07/27/2023
Filed — Alteration
Q00905352-I1
07/27/2023
Permit issued — Support of Excavation
Q00902001-I1-SE
07/17/2023
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Alan Poeppel
07/17/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ANASTASIOS PAPATHANASIOU
07/17/2023
Special inspection requirement — Final
Alan Poeppel
07/13/2023
Filed — Alteration
Q00902001-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTRIUMPH CONSTRUCTION CORP08/29/2025
DOB NOWGeneral ConstructionPermit IssuedTRIUMPH CONSTRUCTION CORP09/19/2024
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC12/11/2023
DOB NOWGeneral ConstructionPermit IssuedTRIUMPH CONSTRUCTION CORP09/22/2023
DOB NOWStructuralSigned-offECD NY INC08/28/2023
DOB NOWSupport of ExcavationSigned-offECD NY INC07/27/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/01/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/28/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/16/2023Excavations - Sheeting, Shoring, and BracingAlan Poeppelspecial
07/17/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Alan Poeppelspecial
07/17/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationANASTASIOS PAPATHANASIOUspecial
07/17/2023FinalAlan Poeppelprogress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026Q00905352-I1Request digital key ↗
08/24/2026Q00905352-S1Request digital key ↗
08/24/2026Q00902196-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026Q00905352-S1Open ↗
08/24/2026Q00905352-I1Open ↗
08/24/2026Q00902196-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026Q00905352-I1Open ↗
09/02/2026Q00905352-I1Open ↗
08/27/2026Q00902001-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026Q00905352-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWOER: Notice of Satisfaction7
08/24/2026Q00902001-I1Open ↗
08/13/2026Q00902196-I1Open ↗
08/13/2026Q00902196-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed7
08/24/2026Q00902001-I1Open ↗
08/13/2026Q00902001-P1Open ↗
08/13/2026Q00902196-I1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports1
▸DOB NOWTR5 Test Report1
08/13/2026Q00902196-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/24/2026Q00905352-I1Open ↗
08/24/2026Q00905352-S1Open ↗
08/24/2026Q00902196-I1Open ↗
Showing 3 of 5 on file for this type