← Back
Three families
YOUNG AVENUE
BRONX · BIN 2130484
💬 Discuss this project
2022Year Built
3Stories
C0Building Class
R4Zoning
3,276 sfGross Floor Area
3Units
Rent Stabilized6 Open Violations ▸
Three families · Owner of record: YOUNG AVE DEVELOPMENT LLC · 2,100 sf lot · 1.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof4p · 2 filings · 20 docs
Cellar3p · 1 filing · 20 docs
Basement2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SR EQUITIES1307/08/2026
SBR EQUITIES803/22/2026
YOUNG AVE DEVELOPMENT603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.1208/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEREBUZZA CONSTRUCTION INGeneral Contractor707/08/2026
J&J DESIGNS INCGeneral Contractor303/21/2026
VMC PLUMBING & HEATING INPlumbing307/08/2026
MARIO CASTROElectrical203/21/2026
POWER SURGE ELECTRIC INC 004009General Contractor203/22/2026
PLBG P HPlumbing103/22/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
W.R. PLBG AND HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781808/18/2023
GTA ENGINEERING SERVICES2940408/18/2023
Building Lifecycle
All (146)Filed (12)Permit Issued (7)Signed Off (7)Violation (2)Inspection (8)Objection (80)Special Inspection (30)
08/14/2026
Violation issued (HPD, open)
C
05/11/2026
Violation issued (HPD, closed)
A
10/24/2023
Signed off — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/BIS NB JOB #240296309 & DOB NOW JOB #X00484254-I1 . INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
X00484254-S5
10/24/2023
Signed off — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/BIS NB JOB #240296309 & DOB NOW JOB #X00484254-I1 . INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
X00484254-I1
10/20/2023
Signed off — Alteration
Curb cut application filed in conjunction with NB building application # 240296309. Propose 10'-0" curb cut with 1'-6" splay on YOUNG AVENUE 61.90' From ALLERTON AVENUE.
X00563953-I1
10/19/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/21/2023
Signed off — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/BIS NB JOB #240296309 & DOB NOW JOB #X00484254-I1 . INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
X00484254-S4
09/21/2023
Signed off — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/BIS NB JOB #240296309 & DOB NOW JOB #X00484254-I1 . INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
X00484254-S2
09/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/08/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/05/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/01/2023
Signed off — Alteration
Structural work in conjunction with NB DOB Job #240296309.
X00674600-I1
09/01/2023
Permit issued — Mechanical Systems
X00484254-S2-MS
08/31/2023
Permit issued — Sprinklers
X00484254-S4-EW-SP
08/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ROBERT DYKSTRA
08/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTIAN LOZADA
08/22/2023
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
08/18/2023
Filed — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/BIS NB JOB #240296309 & DOB NOW JOB #X00484254-I1 . INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
X00484254-P5
08/18/2023
Filed — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/BIS NB JOB #240296309 & DOB NOW JOB #X00484254-I1 . INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
X00484254-P4
08/15/2023
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
08/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/15/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
08/15/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ROBERT DYKSTRA
08/15/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
08/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
08/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
08/14/2023
Signed off — Alteration
Structural work in conjunction with NB DOB Job #240296309.
X00674600-S1
07/26/2023
Permit issued — Curb Cut
X00563953-I1-CC
07/17/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/17/2023
Permit issued — Plumbing
X00484254-S5-PL
05/12/2023
Filed — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/BIS NB JOB #240296309 & DOB NOW JOB #X00484254-I1 . INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
X00484254-S5
05/12/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ROBERT DYKSTRA
05/12/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
05/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/02/2023
Filed — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/BIS NB JOB #240296309 & DOB NOW JOB #X00484254-I1 . INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
X00484254-P1
03/01/2023
Filed — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/BIS NB JOB #240296309 & DOB NOW JOB #X00484254-I1 . INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
X00484254-P3
02/28/2023
Filed — Alteration
FILING SPRINKLER APPLICATION IN CONJUNCTION W/BIS NB JOB #240296309 & DOB NOW JOB #X00484254-I1 . INSTALLATION OF A NEW WET PIPE SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
X00484254-P2
12/30/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/15/2022
Permit issued — Plumbing
X00484254-I1-PL
09/02/2022
Permit issued — Support of Excavation
X00674600-S1-SE
08/26/2022
Permit issued — Structural
X00674600-I1-ST
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGEREBUZZA CONSTRUCTION IN09/01/2023
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC08/31/2023
DOB NOWCurb CutSigned-offJ&J DESIGNS INC07/26/2023
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP05/17/2023
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC12/15/2022
DOB NOWSupport of ExcavationSigned-offGEREBUZZA CONSTRUCTION IN09/02/2022
DOB NOWStructuralSigned-offGEREBUZZA CONSTRUCTION IN08/26/2022
BIS—ISSUEDGEREBUZZA CONSTRUCTION IN01/12/2023
BIS—ISSUEDGEREBUZZA CONSTRUCTION IN08/18/2022
BIS—ISSUEDGEREBUZZA CONSTRUCTION IN08/18/2022
1 project · most recent 09/19/2023
General Wiring
FiledStatusContractorScope
09/19/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/19/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
09/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/17/2023Pass-Final PL - UndergroundPassView ↗
12/30/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
08/22/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
08/22/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
08/22/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
08/22/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
08/22/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
08/22/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/22/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
08/22/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesROBERT DYKSTRAspecial
08/22/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/22/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
08/22/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
08/22/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
08/22/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/22/2023Mechanical SystemsCHRISTIAN LOZADAspecial
08/22/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/22/2023FinalCHRISTIAN LOZADAprogress
08/22/2023Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
08/22/2023Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
08/15/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
08/15/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/15/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
08/15/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesROBERT DYKSTRAspecial
08/15/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/15/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
08/15/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
Latest 25 of 41.
▾Documents — 166 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/24/2026X00484254-P3Request digital key ↗
08/24/2026X00484254-P5Request digital key ↗
08/24/2026X00484254-P4Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION16
09/21/2023240296309Open ↗
09/20/2023240296309Open ↗
09/12/2023240296309Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION3
08/22/2022240296309Open ↗
08/22/2022240296309Open ↗
08/22/2022240296309Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/05/2023240296309Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/12/2023240296309Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
04/08/2022240296309Open ↗
04/04/2022240296309Open ↗
▸BISREVISED PD1 TO REFLECT THE ZONING LOT1
09/28/2023240296309Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/08/2022240296309Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/03/2022240296309Open ↗
▸BISREVISED ZONING EXHIBIT III TO REFLECT THE ZONING LOT1
09/28/2023240296309Open ↗
▸BISVERIFY TAX LOT1
09/29/2023240296309Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
10/29/2021240296309Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/29/2023240296309Open ↗
▸BISZONING DIAGRAM1
07/06/2022240296309Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/24/2026X00484254-P5Open ↗
08/24/2026X00484254-P4Open ↗
08/24/2026X00484254-S5Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/07/2026X00484254-S4Open ↗
09/01/2026X00484254-P4Open ↗
09/01/2026X00484254-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026X00484254-P4Open ↗
09/01/2026X00484254-P4Open ↗
08/27/2026X00484254-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/22/2022240296309Open ↗
08/16/2022240296309Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/13/2021240296309Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/13/2021240296309Open ↗
▸Trade Schedules & Equipment6
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
04/08/2022240296309Open ↗
04/08/2022240296309Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/11/2023240296309Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/11/2023240296309Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
04/08/2022240296309Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/29/2023240296309Open ↗
▸Safety & Tenant Protection4
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
09/11/2023240296309Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/16/2022240296309Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/16/2022240296309Open ↗
▸BISSTREET TREE CHECKLIST1
04/13/2021240296309Open ↗
▸Energy Compliance11
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00484254-I1Open ↗
08/13/2026X00484254-S2Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/11/2023240296309Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
04/08/2022240296309Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/11/2023240296309Open ↗
▸BISFENESTRATION AREAS1
09/11/2023240296309Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
09/11/2023240296309Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/08/2022240296309Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/11/2023240296309Open ↗
▸BISLIGHTING IN DWELLING UNITS1
09/11/2023240296309Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/11/2023240296309Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
11/24/2023240296309Open ↗
10/18/2023240296309Open ↗
08/16/2022240296309Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/13/2021240296309Open ↗
04/13/2021240296309Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
09/11/2023240296309Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
09/29/2023240296309Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/11/2023240296309Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/24/2023240296309Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
04/08/2022240296309Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/11/2023240296309Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/11/2023240296309Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/11/2023240296309Open ↗
▸BISMASONRY1
09/11/2023240296309Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/11/2023240296309Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00674600-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026X00674600-S1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00674600-S1Open ↗
▸Approvals, Objections & Sign-offs16
▸BISSCHEDULE A - OCCUPANCY / USE13
09/21/2023240296309Open ↗
09/20/2023240296309Open ↗
09/12/2023240296309Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/31/2023240296309Open ↗
01/07/2022240296309Open ↗
01/07/2022240296309Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/16/2022240296309Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION5
10/18/2023240296309Open ↗
09/28/2023240296309Open ↗
08/31/2023240296309Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
08/22/2022240296309Open ↗
▸BISEFILING COVER SHEET1
04/07/2022240296309Open ↗
▸Other Documents9
▸BISPLOT DIAGRAM2
06/03/2022240296309Open ↗
04/08/2022240296309Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
01/07/2022240296309Open ↗
▸BISLOWEST FLOOR ELEVATION1
04/08/2022240296309Open ↗
▸BISRE-DESIGN FEE OF $ 225.541
06/03/2022240296309Open ↗
▸BISMAINTENANCE INFORMATION1
09/11/2023240296309Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
09/11/2023240296309Open ↗
▸BISPERMANENT CERTIFICATE1
09/11/2023240296309Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00674600-S1Open ↗