← Back
Predominantly retail with other uses
28 WATER STREET
MANHATTAN · BIN 1000009
💬 Discuss this project
1828Year Built
4.5Stories
K4Building Class
C5-5Zoning
4,104 sfGross Floor Area
3Units
16 Open Violations 13 unresolved · 3 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: MAYIM MGMT LLC · 769 sf lot · 5.34 FAR built · Flood zone AE
Locations of Work
Architecture
Roof1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEBSTER 204307/08/2026
TOPLINE NYC CONTRACTING607/08/2026
MAYIM MANAGEMENT703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MK ARCHITECTURE103/12/2025
NEW YORK ENGINEERING ASSOC., P.C.511/18/2022
SYED ENGINEERING, P.C.209/04/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
NEW YORK ENGINEERING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor207/08/2026
CLEAN TECH MECHANICAL INCPlumbing207/08/2026
M&L SIGNS INCElectrical203/21/2026
EVANS, DWAYNEElectrical203/21/2026
HERNANDEZ, LElectrical203/21/2026
RICHARD NEUElectrical103/22/2026
SHAM CONSTRUCTION GROUPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616103/12/2025
NEW YORK ENGINEERING ASSO851210/06/2022
Building Lifecycle
All (89)Filed (8)Permit Issued (5)Signed Off (5)Violation (40)Inspection (4)Special Inspection (27)
07/07/2026
Violation issued (ECB, open)
Construction
07/07/2026
Violation issued (ECB, open)
Construction
07/07/2026
Violation issued (ECB, open)
Construction
07/07/2026
Violation issued (ECB, open)
Construction
04/21/2026
Signed off — Alteration
The scope of work consists of refinishing the interior walls and flooring and installing new equipment, no changes to the building footprint, height, egress or use.
M01188646-I1
03/25/2025
Permit issued — General Construction
M01188646-I1-GC
03/12/2025
Filed — Alteration
The scope of work consists of refinishing the interior walls and flooring and installing new equipment, no changes to the building footprint, height, egress or use.
M01188646-I1
03/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
03/02/2025
Special inspection requirement — Final
Mourad Kicha
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/16/2022
Signed off — Alteration
REGISTER GAS BOILER AND HOT WATER HEATERS.
M08008314-I1
12/16/2022
Signed off — Alteration
REGISTER GAS WATER HEATERS. INSTALL NEW GAS METERS AND PIPING ON EXISITNG GAS SERVICE.
M08008829-I1
11/18/2022
Filed — Alteration
REGISTER GAS WATER HEATERS. INSTALL NEW GAS METERS AND PIPING ON EXISITNG GAS SERVICE.
M08008829-P2
11/18/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/18/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
11/18/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
11/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
11/18/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
11/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
11/17/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
11/17/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
11/17/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
11/17/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
11/17/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
11/09/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/01/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/26/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/07/2022
Permit issued — Plumbing
M08008829-I1-PL
10/07/2022
Permit issued — Boiler Equipment
M08008314-I1-BE
10/06/2022
Filed — Alteration
REGISTER GAS WATER HEATERS. INSTALL NEW GAS METERS AND PIPING ON EXISITNG GAS SERVICE.
M08008829-P1
10/06/2022
Filed — Alteration
REGISTER GAS BOILER AND HOT WATER HEATERS.
M08008314-P1
10/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
10/06/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
10/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
10/06/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
10/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
10/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
10/06/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
10/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
10/06/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
10/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
10/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
10/06/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
10/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
10/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
10/06/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
10/04/2022
Filed — Alteration
REGISTER GAS BOILER AND HOT WATER HEATERS.
M08008314-I1
10/04/2022
Filed — Alteration
REGISTER GAS WATER HEATERS. INSTALL NEW GAS METERS AND PIPING ON EXISITNG GAS SERVICE.
M08008829-I1
04/23/2021
Signed off — Alteration
M00385793-I1
04/23/2021
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDINSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00394934-I1
10/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/06/2020
Violation issued (ECB, closed)
Construction
09/04/2020
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDINSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00394934-I1
09/04/2020
Permit issued — Supported Scaffold
M00394934-I1-SF
08/20/2020
Permit issued — Sidewalk Shed
M00385793-I1-SH
08/17/2020
Filed — Alteration
M00385793-I1
07/30/2020
Violation issued (ECB, closed)
Construction
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSHAM CONSTRUCTION GROUP03/25/2025
DOB NOWPlumbingSigned-offCLEAN TECH MECHANICAL INC10/07/2022
DOB NOWBoiler EquipmentSigned-offCLEAN TECH MECHANICAL INC10/07/2022
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING09/04/2020
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING08/20/2020
BISOTISSUEDUNITECH DESIGN INC05/30/2007
BISMHISSUEDMICHELLE KUO CORP01/08/2007
2 projects · most recent 04/21/2025
General Wiring
FiledStatusContractorScope
04/21/2025Permit IssuedBOROWIDE ELECT'L CONTR'SGeneral Wiring
08/17/2020Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/09/2022Pass-Final Boiler Equipment InspectionPassView ↗
11/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/26/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
03/05/2025Tenant Protection Plan ComplianceFAHAD FATEHspecial
03/02/2025FinalMourad Kichaprogress
11/18/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/18/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
11/18/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
11/18/2022Maintenance informationLOUIS ARENAenergy_progress
11/18/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
11/17/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
11/17/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/17/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
11/17/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
11/17/2022Maintenance informationLOUIS ARENAenergy_progress
10/06/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/06/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
10/06/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/06/2022Maintenance informationLOUIS ARENAenergy_progress
10/06/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/06/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/06/2022Maintenance informationLOUIS ARENAenergy_progress
10/06/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/06/2022Heating SystemsLOUIS ARENAspecial
10/06/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/06/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/06/2022Maintenance informationLOUIS ARENAenergy_progress
10/06/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
Latest 25 of 27.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
09/01/2026M08008314-I1Request digital key ↗
09/01/2026M08008314-P1Request digital key ↗
09/01/2026M08008829-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00385793-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00394934-I1Request digital key ↗
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026M08008829-I1Open ↗
08/13/2026M08008829-P1Open ↗
08/13/2026M01188646-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M08008314-I1Open ↗
09/01/2026M08008829-I1Open ↗
09/01/2026M08008829-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/04/2026M00385793-I1Open ↗
09/01/2026M08008314-P1Open ↗
09/01/2026M08008314-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026M08008314-I1Open ↗
09/01/2026M08008314-P1Open ↗
08/22/2026M01188646-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026M08008314-P1Open ↗
09/01/2026M08008314-I1Open ↗
09/01/2026M08008829-P1Open ↗
Showing 3 of 5 on file for this type