← Back
Walk-up apt, over six families with stores
Button Factory
270 WATER STREET · BIN 1001360
💬 Discuss this project
1840Year Built
5Stories
C7Building Class
C6-2AZoning
—Gross Floor Area
9Units
14 Open Violations 8 unresolved · 6 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: BUTTON FACTORY TENANTS CORP. · 4.17 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BUTTON FACTORY - COOP PRESIDENT707/08/2026
BUTTOM FACTORY TEMAMIS CO303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JONATHAN WOLFE ARCHITECTURE +DESIGN312/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN LIGHT EXPEDITING LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RITE-FLO P.H.& COOLING INPlumbing207/08/2026
JOSEPH LA POINTEElectrical103/21/2026
KET ELECTRIC LLCElectrical103/22/2026
MARIO SCANDURAElectrical103/21/2026
LEKAJ & JUBAJ INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RHL ENGINEERING, LLC712212/04/2024
Building Lifecycle
All (42)Filed (3)Permit Issued (3)Signed Off (2)Violation (20)Inspection (3)Objection (4)Special Inspection (7)
08/13/2025
Signed off — Alteration
Filing interior renovation at 4th floor Apt with partitions, doors, and finish work as per plans. No change in use, egress, or occupancy under this application.
M01063458-S1
07/23/2025
Signed off — Alteration
Filing interior renovation at 4th floor Apt with partitions, doors, and finish work as per plans. No change in use, egress, or occupancy under this application.
M01063458-I1
06/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2025
Permit issued — Plumbing
M01063458-S1-PL
04/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/02/2025
Objection resolved — Addressed
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Gentile
12/17/2024
Objection raised — Accessibility
12/04/2024
Filed — Alteration
Filing interior renovation at 4th floor Apt with partitions, doors, and finish work as per plans. No change in use, egress, or occupancy under this application.
M01063458-P1
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Gentile
11/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/30/2024
Permit issued — Plumbing
M01063458-S1-PL
10/15/2024
Permit issued — General Construction
M01063458-I1-GC
09/27/2024
Filed — Alteration
Filing interior renovation at 4th floor Apt with partitions, doors, and finish work as per plans. No change in use, egress, or occupancy under this application.
M01063458-S1
09/27/2024
Objection resolved — Addressed
08/08/2024
Objection raised — Other
06/26/2024
Filed — Alteration
Filing interior renovation at 4th floor Apt with partitions, doors, and finish work as per plans. No change in use, egress, or occupancy under this application.
M01063458-I1
06/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Jonathan Wolfe
06/13/2024
Special inspection requirement — Interior lighting power
Jonathan Wolfe
06/13/2024
Special inspection requirement — Lighting in dwelling units
Jonathan Wolfe
06/13/2024
Special inspection requirement — Lighting controls
Jonathan Wolfe
06/13/2024
Special inspection requirement — Final
Jonathan Wolfe
02/16/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2021
Violation issued (ECB, open)
Construction
11/10/2021
Violation issued (FDNY_NOV, closed)
11/10/2021
Violation issued (ECB, open)
Construction
11/10/2021
Violation issued (ECB, open)
Construction
11/10/2021
Violation issued (ECB, open)
Construction
11/10/2021
Violation issued (ECB, open)
Construction
05/23/2018
Violation issued (HPD, open)
C
05/23/2018
Violation issued (HPD, open)
C
01/08/2009
Violation issued (ECB, open)
Construction
07/24/2008
Violation issued (ECB, open)
Construction
08/29/2007
Violation issued (ECB, closed)
Construction
11/13/1990
Violation issued (FDNY_NOV, closed)
08/07/1990
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/03/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDJ PLUMBING & HEATING COR05/28/2025
DOB NOWPlumbingSigned-offDJ PLUMBING & HEATING COR10/30/2024
DOB NOWGeneral ConstructionSigned-offLEKAJ & JUBAJ INC10/15/2024
BIS—ISSUEDCOOPER WORKS INC09/19/2024
BIS—ISSUEDCOOPER WORKS INC02/17/2017
BIS—ISSUEDI.M.P. PLG & HTG CORP04/04/2011
BIS—ISSUEDI.M.P. PLG & HTG CORP08/16/2010
BIS—ISSUEDJD INTERIORS INC06/12/2007
BISEQISSUEDM.B.R. CONTRACTIG INC.01/11/2007
BIS—ISSUEDJD INTERIORS INC06/01/2006
BIS—ISSUEDJD INTERIORS INC02/23/2006
1 project · most recent 10/28/2024
General Wiring
FiledStatusContractorScope
10/28/2024CompleteKET ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
04/02/2025Fire-Resistant Penetrations and JointsVincent Gentilespecial
11/22/2024Fire-Resistant Penetrations and JointsVincent Gentilespecial
06/13/2024Energy Code Compliance InspectionsJonathan Wolfeprogress
06/13/2024Interior lighting powerJonathan Wolfeenergy_progress
06/13/2024Lighting in dwelling unitsJonathan Wolfeenergy_progress
06/13/2024Lighting controlsJonathan Wolfeenergy_progress
06/13/2024FinalJonathan Wolfeprogress
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026M01063458-I1Request digital key ↗
08/27/2026M01063458-S1Request digital key ↗
08/27/2026M01063458-P1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
09/03/2024100495233Open ↗
09/28/2017100495233Open ↗
02/04/2016120198829Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLPC Approval/Permit3
08/27/2026M01063458-S1Open ↗
08/13/2026M01063458-I1Open ↗
08/13/2026M01063458-P1Open ↗
▸BISWORK PERMIT APPLICATION1
09/20/2024100495233Open ↗
▸Seals & Professional Certifications20
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
02/04/2016120198829Open ↗
02/04/2016120419733Open ↗
08/04/2010120419733Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026M01063458-I1Open ↗
08/24/2026M01063458-I1Open ↗
08/24/2026M01063458-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026M01063458-S1Open ↗
08/13/2026M01063458-P1Open ↗
08/13/2026M01063458-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/04/2010120419733Open ↗
12/03/2009120198829Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/04/2010120419733Open ↗
12/03/2009120198829Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M01063458-S1Open ↗
08/28/2026M01063458-P1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
08/04/2010120419733Open ↗
12/03/2009120198829Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026M01063458-S1Open ↗
08/13/2026M01063458-P1Open ↗
08/13/2026M01063458-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
08/04/2010120419733Open ↗
12/03/2009120198829Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)2
08/04/2010120419733Open ↗
08/04/2010120419733Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
08/04/2010120419733Open ↗
07/26/2010120419733Open ↗
▸BISLANDMARKS APPROVAL1
12/03/2009120198829Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/04/2010120419733Open ↗
12/03/2009120198829Open ↗
▸Filing & Intake Forms2
▸BISeFiling Job Application Cover Sheet1
07/26/2010120419733Open ↗
▸BISEFILING COVER SHEET1
12/03/2009120198829Open ↗
▸Other Documents3
▸DOB NOWLoft Board Certificate3
08/27/2026M01063458-S1Open ↗
08/13/2026M01063458-P1Open ↗
08/13/2026M01063458-I1Open ↗