Primarily 2 family with 1 store or office
162 CHAMBERS STREET
MANHATTAN · BIN 1001491
💬 Discuss this project
1915Year Built
5Stories
S2Building Class
C6-3AZoning
10,020 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 162 CHAMBERS STREET, LLC · 2,180 sf lot · 4.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscape
Permit Issued — active, not yet Signed-off
RoofUnder Construction19p · 3 filings · 20 docs
Penthouse11p · 1 filing · 11 docs
Floor 5Under Construction25p · 4 filings · 20 docs
Floor 4Under Construction32p · 5 filings · 20 docs
Floor 3Under Construction35p · 5 filings · 20 docs
Floor 2Under Construction33p · 5 filings · 20 docs
Floor 1Under Construction14p · 2 filings · 13 docs
CellarUnder Construction34p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
162 CHAMBERS STREET2208/16/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/14/2018$11.7M—— → —$1,168/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PINTO ENGINEERING CONSULTANT, DPC805/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PINTO STUDIO1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LM CREATIVE CONSTRUCTIONGeneral Contractor208/16/2026
REDGRAVE ELECTL MAINTNCEElectrical103/22/2026
DOVAL PLBG & HTG CORPFire Protection107/08/2026
DORNEVIL, DAVIDElectrical103/21/2026
RIKE ASSOCIATES INCGeneral Contractor107/08/2026
HT PLUMBING & HEATING CORPlumbing106/27/2026
CL DESIGN AND BUILD CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PINTO ENGINEERING CONSULT9110805/28/2026
Building Lifecycle
All (133)Filed (8)Permit Issued (6)Violation (36)Inspection (9)Objection (44)Special Inspection (30)
08/14/2026
Permit issued — General Construction
M01304766-I1-GC
08/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/03/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rene Navarrete
07/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2026
Objection resolved — Addressed
06/15/2026
Objection raised — Cost
05/28/2026
Filed — Alteration
LIMITED TO EXISTING TWO DUPLEX RESIDENTIAL DWELLINGS AT 2ND, 3RD, 4TH AND 5TH FLOOR, KITCHENS, BATHROOMS AND LAUNDRY AREAS. REMOVAL OF RESIDENTIAL PLUMBING AS STOVES, GAS PIPING, GAS METERS BOILER ANG HWH.
M01237831-P1
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rene Navarrete
05/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/24/2026
Permit issued — General Construction
M01182016-I1-GC
04/22/2026
Objection raised — Admin
04/22/2026
Objection resolved — Resolved
04/22/2026
Objection raised — Plumbing
04/22/2026
Objection resolved — Resolved
04/22/2026
Objection resolved — Resolved
03/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2026
Objection resolved — Resolved
03/05/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
03/04/2026
Objection resolved — Addressed
03/03/2026
Objection raised — Cost
03/03/2026
Objection raised — Plumbing
03/03/2026
Objection raised — Plumbing
03/03/2026
Objection raised — Mechanical
03/03/2026
Objection resolved — Addressed
02/27/2026
Objection resolved — Addressed
02/10/2026
Permit issued — Sprinklers
M01270555-I1-EW-SP
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
12/29/2025
Objection raised — Fire_Protection
12/29/2025
Objection raised — Fire_Protection
12/29/2025
Objection raised — Admin
12/29/2025
Objection raised — Scope
12/29/2025
Objection raised — Admin
12/29/2025
Objection raised — Plumbing
12/29/2025
Objection raised — Structural
12/29/2025
Objection raised — Zoning
12/29/2025
Objection raised — Cost
12/29/2025
Objection raised — Zoning
12/29/2025
Objection raised — Admin
12/26/2025
Objection resolved — Addressed
12/22/2025
Permit issued — Mechanical Systems
M01284633-I1-MS
12/11/2025
Filed — Alteration CO
Alteration CO to convert exist. mix-use Residential/Commercial two dwelling to four dweeling and Commercial; minor interior renovation on first floor, Second, third and Fourth and Fifth Floors. New Certificate of occupancy to obtain.
M01304766-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/21/2025
Filed — Alteration
Selective partial removals and interior renovation at residential apartment units located on 2nd, 3rd, 4th and 5th floors. including kitchen, bathrooms, laundry, and common area.
M01182016-P2
10/21/2025
Special inspection requirement — Lighting in dwelling units
Rene Navarrete
10/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rene Navarrete
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rene Navarrete
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Rene Navarrete
10/21/2025
Special inspection requirement — Final
Rene Navarrete
Latest 60 of 133 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLM CREATIVE CONSTRUCTION08/14/2026
DOB NOWGeneral ConstructionPermit IssuedLM CREATIVE CONSTRUCTION04/24/2026
DOB NOWSprinklersPermit IssuedDOVAL PLBG & HTG CORP02/10/2026
DOB NOWMechanical SystemsPermit IssuedRIKE ASSOCIATES INC12/22/2025
DOB NOWPlumbingPermit IssuedHT PLUMBING & HEATING COR09/12/2025
DOB NOWGeneral ConstructionPermit IssuedCL DESIGN AND BUILD CORP03/10/2025
BISOTISSUEDURBAN D.C. INC07/22/2003
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/14/2003
BISOTISSUEDURBAN D.C. INC02/19/2003
1 project · most recent 09/12/2025
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/12/2025Permit IssuedRIKE ASSOCIATES INCAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Daikin HSP CONCEALED DUCTED UNIT ; MODEL : FXMA36AAVJU 36,000 BTU · Vrf Indoor ×3
5MXS48TVJU 48,000 BTU · Heat Pump Outdoor ×1
FDMQ12RVJU 10,800 BTU · Vrf Indoor ×1
Heat / Cool
Daikin 4MXL36TVJU 34,000 BTU · Heat Pump Outdoor ×3
5MXS48TVJU 47,000 BTU · Heat Pump Outdoor ×1
RX12RMVJU9 10,800 BTU · Heat Pump Outdoor ×1
1 project · most recent 09/12/2025
FiledStatusContractorScope
09/12/2025Permit IssuedDOVAL PLBG & HTG CORP79 heads
2 projects · most recent 05/28/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/28/2026Permit IssuedHT PLUMBING & HEATING CORGas, Water/Sanitary
09/12/2025———
1 project · most recent 05/21/2026
General Wiring
FiledStatusContractorScope
05/21/2026Permit IssuedREDGRAVE ELECTL MAINTNCEGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/03/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
08/03/2026Fire-Resistant Penetrations and JointsRene Navarretespecial
05/28/2026Fire-Resistant Penetrations and JointsRene Navarretespecial
10/21/2025Lighting in dwelling unitsRene Navarreteenergy_progress
10/21/2025Structural Stability – Alterations of existing buildingsRene Navarretespecial
10/21/2025Fire-Resistant Penetrations and JointsRene Navarretespecial
10/21/2025Energy Code Compliance InspectionsRene Navarreteprogress
10/21/2025FinalRene Navarreteprogress
10/21/2025Lighting controlsRene Navarreteenergy_progress
10/21/2025Air barrier - visual inspectionRene Navarreteenergy_progress
10/21/2025Fenestration air leakageRene Navarreteenergy_progress
10/21/2025Fenestration areasRene Navarreteenergy_progress
10/16/2025Fenestration areas—energy_progress
10/16/2025Fire-Resistant Penetrations and Joints—special
10/16/2025Structural Stability – Alterations of existing buildingsRene Navarretespecial
10/16/2025Energy Code Compliance Inspections—progress
10/16/2025FinalRene Navarreteprogress
10/16/2025Lighting controls—energy_progress
10/16/2025Fenestration air leakage—energy_progress
10/16/2025Lighting in dwelling units—energy_progress
10/16/2025Air barrier - visual inspection—energy_progress
09/12/2025Fire-Resistant Penetrations and JointsRene Navarretespecial
09/12/2025Post-installed AnchorsRene Navarretespecial
09/11/2025Shutoff dampersRene Navarreteenergy_progress
09/11/2025Fire-Resistant Penetrations and JointsRene Navarretespecial
09/11/2025Ventilation and air distribution systemRene Navarreteenergy_progress
Latest 25 of 37.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026M01237831-P2Request digital key ↗
08/21/2026M01270555-I1Request digital key ↗
08/21/2026M01284633-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M01304766-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026M01284633-I1Open ↗
09/23/2026M01284633-I1Open ↗
09/23/2026M01284633-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026M01237831-P2Open ↗
08/21/2026M01270555-I1Open ↗
08/21/2026M01284633-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026M01284633-I1Open ↗
09/23/2026M01270555-I1Open ↗
09/23/2026M01284633-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/20/2026M01304766-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01304766-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026M01237831-P2Open ↗
08/21/2026M01270555-I1Open ↗
08/21/2026M01284633-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026M01182016-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/20/2026M01304766-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M01304766-I1Open ↗