← Back
MANHATTAN
42 NORTH MOORE STREET
MANHATTAN · BIN 1002141
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
18 Open Violations 14 unresolved · 4 paperwork only ▸FDNY Report ↗
Flood zone X500
Locations of Work
ArchitectureStructuralFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction5p · 1 filing · 20 docs
MezzanineUnder Construction7p · 1 filing · 20 docs
CellarUnder Construction8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MOORE STREET BLDG CO303/22/2026
MOORE STREET BLDG CO ABBO403/22/2026
P & Z ELECTRIC CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MONTALBA ARCHITECTS INC408/04/2026
ANZ CONSULTING ENGINEERING, PLLC104/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PH CUSTOM HOME IMPROVEMENGeneral Contractor207/08/2026
P & Z ELECTRIC CORPElectrical103/22/2026
FLUID MECHANICS CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MOORE ENG. OF NY, DPC9134508/04/2026
ANZ CONSULTING ENGINEERIN3946104/28/2026
Building Lifecycle
All (69)Filed (5)Permit Issued (3)Signed Off (1)Violation (60)
08/25/2026
Signed off — Alteration
PROVIDE AN ALTERATION TO EXITING SPRINKLER SYSTEM WITH COMPLETE COVERAGE TO ALL FLOORS OF THE BUILDING WITHINTENANT SPACE/SCOPE OF WORK IN COMPLIANCE WITH THE 2022 NYC BUILDING CODES & NFPA 13. THE WORK WILL INCLUDE FOR A NEWSPRINKLER PIPING DISTRIBUTION.
M01309905-S1
08/24/2026
Violation issued (ECB, open)
Construction
08/24/2026
Violation issued (ECB, open)
Construction
08/04/2026
Filed — Alteration
PROVIDE AN ALTERATION TO EXITING SPRINKLER SYSTEM WITH COMPLETE COVERAGE TO ALL FLOORS OF THE BUILDING WITHINTENANT SPACE/SCOPE OF WORK IN COMPLIANCE WITH THE 2022 NYC BUILDING CODES & NFPA 13. THE WORK WILL INCLUDE FOR A NEWSPRINKLER PIPING DISTRIBUTION.
M01309905-P2
07/30/2026
Filed — Alteration
PROVIDE AN ALTERATION TO EXITING SPRINKLER SYSTEM WITH COMPLETE COVERAGE TO ALL FLOORS OF THE BUILDING WITHINTENANT SPACE/SCOPE OF WORK IN COMPLIANCE WITH THE 2022 NYC BUILDING CODES & NFPA 13. THE WORK WILL INCLUDE FOR A NEWSPRINKLER PIPING DISTRIBUTION.
M01309905-P1
05/21/2026
Permit issued — Structural
M01309905-S1-ST
05/21/2026
Permit issued — Sprinklers
M01309905-S2-EW-SP
05/04/2026
Permit issued — General Construction
M01309905-I1-GC
04/28/2026
Filed — Alteration
PROVIDE AN ALTERATION TO EXITING SPRINKLER SYSTEM WITH COMPLETE COVERAGE TO ALL FLOORS OF THE BUILDING WITHINTENANT SPACE/SCOPE OF WORK IN COMPLIANCE WITH THE 2022 NYC BUILDING CODES & NFPA 13. THE WORK WILL INCLUDE FOR A NEWSPRINKLER PIPING DISTRIBUTION.
M01309905-S2
02/02/2026
Filed — Alteration
PROVIDE AN ALTERATION TO EXITING SPRINKLER SYSTEM WITH COMPLETE COVERAGE TO ALL FLOORS OF THE BUILDING WITHINTENANT SPACE/SCOPE OF WORK IN COMPLIANCE WITH THE 2022 NYC BUILDING CODES & NFPA 13. THE WORK WILL INCLUDE FOR A NEWSPRINKLER PIPING DISTRIBUTION.
M01309905-S1
01/30/2026
Filed — Alteration
PROVIDE AN ALTERATION TO EXITING SPRINKLER SYSTEM WITH COMPLETE COVERAGE TO ALL FLOORS OF THE BUILDING WITHINTENANT SPACE/SCOPE OF WORK IN COMPLIANCE WITH THE 2022 NYC BUILDING CODES & NFPA 13. THE WORK WILL INCLUDE FOR A NEWSPRINKLER PIPING DISTRIBUTION.
M01309905-I1
01/13/2026
Violation issued (ECB, closed)
Construction
07/28/2025
Violation issued (ECB, open)
Construction
07/28/2025
Violation issued (ECB, open)
Construction
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, open)
B
01/17/2025
Violation issued (HPD, open)
C
01/17/2025
Violation issued (HPD, open)
A
01/17/2025
Violation issued (HPD, open)
B
01/17/2025
Violation issued (HPD, closed)
C
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, closed)
C
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, closed)
A
01/17/2025
Violation issued (HPD, open)
B
01/17/2025
Violation issued (HPD, open)
B
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, closed)
B
01/17/2025
Violation issued (HPD, open)
C
01/17/2025
Violation issued (HPD, open)
C
01/17/2025
Violation issued (HPD, open)
B
11/03/2024
Violation issued (ECB, open)
Construction
10/01/2024
Violation issued (HPD, closed)
B
10/01/2024
Violation issued (HPD, closed)
C
10/01/2024
Violation issued (HPD, closed)
C
10/01/2024
Violation issued (HPD, closed)
B
10/01/2024
Violation issued (HPD, closed)
B
10/01/2024
Violation issued (HPD, closed)
B
10/01/2024
Violation issued (HPD, closed)
B
10/01/2024
Violation issued (HPD, closed)
B
10/01/2024
Violation issued (HPD, open)
A
10/01/2024
Violation issued (HPD, open)
A
08/01/2023
Violation issued (FDNY_NOV, closed)
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/18/2023
Violation issued (ECB, open)
Construction
02/18/2022
Violation issued (FDNY_NOV, closed)
02/18/2022
Violation issued (FDNY_NOV, closed)
09/03/2021
Violation issued (FDNY_NOV, closed)
12/29/2020
Violation issued (FDNY_NOV, closed)
05/06/2014
Violation issued (FDNY_NOV, closed)
08/30/2011
Violation issued (FDNY_NOV, closed)
08/03/2010
Violation issued (FDNY_NOV, closed)
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPH CUSTOM HOME IMPROVEMEN05/21/2026
DOB NOWSprinklersPermit IssuedFLUID MECHANICS CORP05/21/2026
DOB NOWGeneral ConstructionPermit IssuedPH CUSTOM HOME IMPROVEMEN05/04/2026
BISBLISSUEDAMOK INC11/06/1991
BISPLISSUEDAMOK INC11/06/1991
BISMHISSUEDALMERICO10/15/1991
BISOTISSUEDGUTTMAN SILVERSTEIN09/20/1991
1 project · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026Permit IssuedFLUID MECHANICS CORP27 heads
1 project · most recent 12/12/2025
General Wiring
FiledStatusContractorScope
12/12/2025Permit IssuedP & Z ELECTRIC CORPGeneral Wiring
1 project · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026Permit IssuedFLUID MECHANICS CORP1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/31/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/31/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/07/2026FinalChristine Hobsonprogress
08/07/2026Structural Stability – Alterations of existing buildingsChristine Hobsonspecial
08/07/2026Tenant Protection Plan ComplianceChristine Hobsonspecial
08/03/2026Tenant Protection Plan ComplianceChristine Hobsonspecial
08/03/2026Fire-Resistant Penetrations and JointsChristine Hobsonspecial
08/03/2026FinalDAVID MONTALBAprogress
07/21/2026FinalDAVID MONTALBAprogress
07/21/2026Fire-Resistant Penetrations and JointsChristine Hobsonspecial
07/21/2026Tenant Protection Plan Compliance—special
04/24/2026Fire-Resistant Penetrations and JointsChristine Hobsonspecial
04/24/2026Post-installed AnchorsChristine Hobsonspecial
04/22/2026Sprinkler SystemsALBERT ZIRINOspecial
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/19/2026M01309905-S1Request digital key ↗
08/19/2026M01309905-I1Request digital key ↗
08/19/2026M01309905-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/19/2026M01309905-P2Open ↗
08/19/2026M01309905-P1Open ↗
08/13/2026M01309905-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M01309905-I1Open ↗
09/01/2026M01309905-I1Open ↗
08/28/2026M01309905-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026M01309905-S1Open ↗
08/19/2026M01309905-I1Open ↗
08/19/2026M01309905-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M01309905-I1Open ↗
08/28/2026M01309905-S1Open ↗
08/26/2026M01309905-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026M01309905-S1Open ↗
08/19/2026M01309905-I1Open ↗
08/19/2026M01309905-P2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸DOB NOWLoft Board Certificate2
08/19/2026M01309905-P1Open ↗
08/13/2026M01309905-I1Open ↗