← Back
Predominantly retail with other uses
47 EAST BROADWAY
MANHATTAN · BIN 1003420
💬 Discuss this project
1915Year Built
5Stories
K4Building Class
C6-1GZoning
9,000 sfGross Floor Area
8Units
11 Open Violations 3 unresolved · 8 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 47 EAST BROADWAY RLTY CP · 1,875 sf lot · 4.8 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 5Under Construction13p · 1 filing · 20 docs
Floor 4Under Construction12p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1
1 job · most recent 11/08/2024
General Wiring Lighting
FiledStatusContractorScope
11/08/2024Permit IssuedEMP ELECTRIC CORPGeneral Wiring, Lighting
1 job · most recent 12/03/2024
Sidewalk Shed
FiledStatusContractorScope
12/03/2024——Sidewalk Shed
Building Lifecycle
All (60)Filed (7)Permit Issued (4)Signed Off (1)Violation (22)Objection (15)Special Inspection (11)
05/25/2026
Objection raised — Scope
05/06/2026
Filed — Alteration
LEGALIZATION OF INTERIOR PARTITION WORK IN THE EXISTING COMMERCIAL SPACES AS PER THE PLANS FILED HEREWITH TO REMOVE WWP VIOLATION #34181014H & #344228525P. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01303315-I1
04/22/2026
Filed — Alteration CO
CHANGE USE FROM FACTORY TO RESIDENTIAL APARTMENTS ON 4TH & 5TH FLOOR.
M00587414-P2
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
02/19/2026
Permit issued — Plumbing
M00587414-S1-PL
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
02/18/2026
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
02/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
02/18/2026
Special inspection requirement — Lighting in dwelling units
MEHDI GHAZI
02/18/2026
Special inspection requirement — Interior lighting power
MEHDI GHAZI
08/20/2025
Filed — Alteration CO
CHANGE USE FROM FACTORY TO RESIDENTIAL APARTMENTS ON 4TH & 5TH FLOOR.
M00587414-P1
08/13/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
08/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
08/13/2025
Special inspection requirement — Lighting in dwelling units
MEHDI GHAZI
08/13/2025
Special inspection requirement — Interior lighting power
MEHDI GHAZI
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
05/19/2025
Signed off — Alteration
M00410188-I1
04/21/2025
Permit issued — Mechanical Systems
M00410188-I1-MS
12/18/2024
Permit issued — Plumbing
M00587414-S1-PL
12/03/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01108995-I1
06/13/2024
Filed — Alteration CO
CHANGE USE FROM FACTORY TO RESIDENTIAL APARTMENTS ON 4TH & 5TH FLOOR.
M00587414-S1
05/28/2024
Permit issued — General Construction
M00587414-I1-GC
04/29/2024
Violation issued (FDNY_NOV, closed)
06/29/2022
Objection raised — Admin
06/29/2022
Objection resolved — Addressed
01/20/2022
Objection raised — Scope
01/20/2022
Objection resolved — Addressed
01/20/2022
Objection raised — Scope
01/20/2022
Objection resolved — Addressed
01/20/2022
Objection raised — Scope
01/20/2022
Objection resolved — Addressed
01/20/2022
Objection raised — Other
01/20/2022
Objection resolved — Addressed
01/20/2022
Objection raised — Other
01/20/2022
Objection resolved — Addressed
01/20/2022
Objection raised — Scope
01/20/2022
Objection resolved — Addressed
01/03/2022
Filed — Alteration CO
CHANGE USE FROM FACTORY TO RESIDENTIAL APARTMENTS ON 4TH & 5TH FLOOR.
M00587414-I1
10/08/2020
Filed — Alteration
M00410188-I1
03/12/2020
Violation issued (FDNY_NOV, closed)
09/03/2019
Violation issued (FDNY_NOV, closed)
10/26/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/07/2010
Violation issued (ECB, closed)
Construction
02/22/2010
Violation issued (ECB, open)
Construction
02/22/2010
Violation issued (ECB, open)
Construction
02/22/2010
Violation issued (ECB, open)
Construction
02/03/2010
Violation issued (FDNY_NOV, closed)
02/03/2010
Violation issued (FDNY_NOV, closed)
12/11/2009
Violation issued (ECB, open)
Construction
12/11/2009
Violation issued (ECB, open)
Construction
12/11/2009
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
04/06/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/16/2006
Violation issued (ECB, closed)
Construction
06/16/2006
Violation issued (ECB, open)
Construction
09/23/2002
Violation issued (FDNY_NOV, closed)
11/08/1999
Violation issued (ECB, open)
Construction
11/08/1999
Violation issued (ECB, open)
Construction
07/22/1998
Violation issued (ECB, open)
Construction
01/04/1996
Violation issued (FDNY_NOV, closed)
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
183-185 COLUMBIA ST1207/08/2026
47 EAST BROADWAY REALTY C403/22/2026
47 EAST BROADWAY103/22/2026
OWNER OF 47 EAST BROADWAY203/22/2026
47 E BROADWAY RLTY COR103/22/2026
47 E BROADWAY RLTY CP203/22/2026
JASCO203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HSU & ASSOCIATES505/06/2026
MJE PROFESSIONAL SERVICES112/03/2024
ARC CONSULTING ENGINEERS110/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
JRK CREATIVE203/21/2026
G PLAN BUILDING CONSULTING403/21/2026
IBUILD CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIRST STAR CONSTRUCTION *General Contractor303/21/2026
TRI STATE PLBG & HTG INCPlumbing207/08/2026
L2 CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129404/22/2026
ARC CONSULTING ENGINEERS,4083110/08/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedDW PLUMBING INC02/19/2026
DOB NOWMechanical SystemsSigned-offFIRST STAR CONSTRUCTION *04/21/2025
DOB NOWPlumbingPermit IssuedDW PLUMBING INC12/18/2024
DOB NOWGeneral ConstructionPermit IssuedL2 CONSTRUCTION INC05/28/2024
BISFPISSUEDNY FIRE LLC11/03/2011
BISOTISSUEDWKL CONSTRUCTION05/26/2000
BISFPISSUEDMASTER FIRE PREVTION SYTEMS01/19/1996
BISPLISSUEDPLUMBING & HTG DOCTOR INC10/19/1995
BISOTISSUEDWKL CONSTRUCTION INC.09/21/1995
BISFPISSUEDMASTER FIRE PREV. SYSTEM INC05/16/1995
BIS—ISSUEDBERGER SIGN FABRICATION INC10/15/1991
BISPLISSUEDN/A04/09/1991
BISPLISSUEDN/A04/09/1991
BIS—ISSUEDFONG KEE CONSTRUCTION CORP03/12/1991
BISFPISSUEDMASTER FIRE PREVENTIONS SYSTEMS02/26/1991
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
04/01/2026Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
02/18/2026Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
02/18/2026Energy Code Compliance InspectionsMEHDI GHAZIprogress
02/18/2026Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
02/18/2026Lighting in dwelling unitsMEHDI GHAZIenergy_progress
02/18/2026Interior lighting powerMEHDI GHAZIenergy_progress
08/13/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
08/13/2025Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
08/13/2025Lighting in dwelling unitsMEHDI GHAZIenergy_progress
08/13/2025Interior lighting powerMEHDI GHAZIenergy_progress
08/13/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/25/2026M01108995-I1Request digital key ↗
08/17/2026M00587414-P2Request digital key ↗
08/17/2026M00587414-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00410188-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
04/13/2015110363357Open ↗
04/17/2014110363357Open ↗
09/20/2011120811069Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
11/04/2011120811069Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/04/2026M00410188-I1Open ↗
08/17/2026M00587414-P2Open ↗
08/17/2026M00587414-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026M00587414-I1Open ↗
08/25/2026M00587414-I1Open ↗
08/24/2026M00587414-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026M00587414-I1Open ↗
08/24/2026M00587414-P1Open ↗
08/22/2026M00587414-P2Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/22/2008110363357Open ↗
09/13/2011120811069Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
09/20/2011120811069Open ↗
10/22/2008110363357Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/17/2026M00587414-I1Open ↗
08/13/2026M00587414-P1Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/22/2008110363357Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE3
01/31/2013110363357Open ↗
10/22/2008110363357Open ↗
10/22/2008110363357Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/13/2011120811069Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
09/20/2011120811069Open ↗
09/13/2011120811069Open ↗
10/22/2008110363357Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
09/20/2011120811069Open ↗
10/22/2008110363357Open ↗
▸BISeFiling Job Application Cover Sheet1
09/13/2011120811069Open ↗
▸Other Documents8
▸DOB NOWLoft Board Certificate6
08/17/2026M00587414-I1Open ↗
08/17/2026M00587414-P2Open ↗
08/13/2026M00410188-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification2
08/17/2026M00587414-I1Open ↗
08/13/2026M00587414-P1Open ↗