DOB10/08/2010V-DOB VIOLATION - ACTIVE
ECB12/11/2009RESIDENCE ALTERED OR OCCUPANCY AS A DWELLING FROM FACTORY FAMILIES TO 4 OR MORE FAMILIES. NOTED- 5FL CONVERTED TO 2 SEPARATE SPACES WITH 5 SRO'S IN THE FRONT WITH A SHAME KITCHEN AND BATH AND SRO'S @ REAR WITH$30K due
DOB12/11/2009WORK W/OUT PERMIT
ECB02/22/2010FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY AT 2 FLOOR OF O 343738STATES STOCK ROOM NOW AT 2 FLOOR THERE ARE 8 INDIVIDUAL OFFICES WHICH WHEN LOCKED OBSTRUCT EGRESS FROM FIRE ESCAPE UNABLE TO DISCHARGE OFFICNothing owed — awaiting certificate of correction
ECB02/22/2010OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY NOTED 1ST FLOOR 8 INDIVIDUALS OFFICES 3 FLOOR 3 MARJONS PARLORS 4TH FLR ONE DOOR POSSIBLE APT 5TH FLR 2 BEDROOMS KITCHEN LIVING RM BATHRM APT CNothing owed — awaiting certificate of correction
ECB02/22/2010WORK W/O A PERMIT: NOTED: AT 4TH - 5TH FLRS 5TH FL,FULL HEIGHT PARTITIONS CREATING 2 BEDROOM APT,KITCHEN,LIVING RM,3PC BATHROOM GAS,PLUMBINGELECTRICAL WORK. WORK IS 100% COMPLETE & OCCUPIED. UNDER APPLICATION #Nothing owed — awaiting certificate of correction
ECB12/11/2009WORK WITHOUT A PERMIT. NOTED- 5TH FL A FACTORY HAS BEEN CONVENTED TO 2SEPARATE APTS WITH 5 SRO'S IN THE FRONT APT WITH A FULL KITCHEN AND BATH AND THE REAR APT HAS 4 SRO'S WITH A FULL KITCHEN AND BATH @ TIME OFNothing owed — awaiting certificate of correction
ECB06/16/2006EXIT LIGHTING DEFECTIVE. NOTED:EXIT LIGHT AT DOOR AT STAIR AT BASEMENT& CELLAR NOT FUNCTIONING DOES NOT LIGHT UP. REMEDY:REPAIR / REPLACE EXIT LIGHTS.Nothing owed — awaiting certificate of correction
ECB11/08/1999OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O NUMBER 100149 ALTERED2/27/92 NOTED FIRST FLOOR OCCUPIED AS RESTRURANT AND DINNING CONTRARY TO C OF O WHICH ALLOWS STORE USE ONLY. SECOND AND THRID FLOOR NOW ILLNothing owed — awaiting certificate of correction
ECB11/08/1999WORK WITHOUT A PERMIT. ALL WORK COMPLETED. NOTED SECOND FLOOR SUBDIVIDED MAKING APPROX 7 OFFICES CONSTRUCTED OF PARTITION WALLS WHICH WAS ORIGNALLY AND LEGALLY TWO OFFICE SPACES. THIRD FLOOR SUBDIVIDED WITHNothing owed — awaiting certificate of correction
ECB07/22/1998WORK WITHOUT A PERMIT. NOTED; AT 2ND AND 3RD FLOOR LEVELS PARTITIONS ERECTED W/DOORS SUBDWIDING SPACE INTO MANY COMMERCIAL SPACES OFFICES REMEDY; OBTAIN ALL NECESSARY PERMITS AND APPROVALS OR RESTORE BLDGNothing owed — awaiting certificate of correction