← Back
Walk-up apt, over six families with stores
55 CLINTON STREET
MANHATTAN · BIN 1004227
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R7AZoning
8,311 sfGross Floor Area
18Units
Rent Stabilized31 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 55 CLINTON ST LLC · 2,500 sf lot · 3.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 11/28/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/28/2025Permit IssuedJUAHOL CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NLHZ-U1 (outdoor) & PVFY-P54NAMU-E1 (indoor) 5 tons · Split System ×1
Building Lifecycle
All (58)Filed (1)Permit Issued (1)Violation (45)Special Inspection (11)
12/16/2025
Permit issued — Mechanical Systems
M01322509-I1-GC-CX
11/28/2025
Filed — Alteration
Minor interior renovation in existing mixed-use building: first-floor tenant space for tailor/alterations shop. Work includes limited non-bearing partitions, new flooring, lighting, HVAC, and general finishes. No change in use, egress, or occupancy.
M01322509-I1
11/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
11/20/2025
Special inspection requirement — Mechanical Systems
Luis Pichardo
11/20/2025
Special inspection requirement — Final
Juan Ramos
11/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Luis Pichardo
11/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Luis Pichardo
11/20/2025
Special inspection requirement — Shutoff dampers
Luis Pichardo
11/20/2025
Special inspection requirement — Interior lighting power
Luis Pichardo
11/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Luis Pichardo
11/20/2025
Special inspection requirement — Heating Systems
Luis Pichardo
11/20/2025
Special inspection requirement — Lighting controls
Luis Pichardo
11/17/2025
Violation issued (HPD, closed)
I
11/07/2024
Violation issued (HPD, closed)
C
11/07/2024
Violation issued (HPD, open)
C
11/07/2024
Violation issued (HPD, closed)
B
11/07/2024
Violation issued (HPD, closed)
C
11/07/2024
Violation issued (HPD, closed)
C
11/07/2024
Violation issued (HPD, closed)
B
11/07/2024
Violation issued (HPD, open)
C
03/15/2023
Violation issued (HPD, closed)
A
05/23/2021
Violation issued (HPD, open)
B
05/23/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
01/14/2018
Violation issued (HPD, open)
C
01/14/2018
Violation issued (HPD, open)
A
01/14/2018
Violation issued (HPD, open)
A
10/24/2016
Violation issued (HPD, closed)
I
07/09/2015
Violation issued (HPD, open)
A
10/09/2014
Violation issued (HPD, closed)
B
10/09/2014
Violation issued (HPD, closed)
B
09/29/2014
Violation issued (HPD, open)
C
09/29/2014
Violation issued (HPD, open)
C
09/29/2014
Violation issued (HPD, open)
C
08/13/2010
Violation issued (HPD, open)
C
08/13/2010
Violation issued (HPD, open)
A
08/13/2010
Violation issued (HPD, open)
A
08/13/2010
Violation issued (HPD, open)
B
08/13/2010
Violation issued (HPD, open)
A
08/13/2010
Violation issued (HPD, open)
A
08/13/2010
Violation issued (HPD, open)
B
07/21/2010
Violation issued (HPD, open)
C
07/21/2010
Violation issued (HPD, open)
B
07/21/2010
Violation issued (HPD, open)
B
07/21/2010
Violation issued (HPD, open)
B
07/14/2010
Violation issued (HPD, open)
A
07/14/2010
Violation issued (HPD, open)
A
07/14/2010
Violation issued (HPD, open)
A
05/10/2010
Violation issued (HPD, open)
B
05/10/2010
Violation issued (HPD, open)
C
05/10/2010
Violation issued (HPD, open)
A
05/10/2010
Violation issued (HPD, open)
A
05/10/2010
Violation issued (HPD, open)
C
05/10/2010
Violation issued (HPD, open)
B
05/04/2010
Violation issued (HPD, open)
C
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
55 CLINTON ST LLC103/22/2026
TERM EQUITIES103/21/2026
113 WEST 106 STREET803/21/2026
2461 EIGHT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGE ENGINEERING, LLC111/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCOMETRIC DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUNCAN, JAMESElectrical103/21/2026
ROBINSON, PHILIPElectrical103/21/2026
JUAHOL CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369111/28/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJUAHOL CONSTRUCTION INC12/16/2025
BISOTISSUEDGREENWICH VILLAGE CONSTRU06/10/2016
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/28/2025Tenant Protection Plan ComplianceLuis Pichardospecial
11/20/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
11/20/2025Mechanical SystemsLuis Pichardospecial
11/20/2025FinalJuan Ramosprogress
11/20/2025HVAC-R and service water piping design and insulationLuis Pichardoenergy_progress
11/20/2025HVAC-R and service water heating system controlsLuis Pichardoenergy_progress
11/20/2025Shutoff dampersLuis Pichardoenergy_progress
11/20/2025Interior lighting powerLuis Pichardoenergy_progress
11/20/2025HVAC-R and service water heating equipmentLuis Pichardoenergy_progress
11/20/2025Heating SystemsLuis Pichardospecial
11/20/2025Lighting controlsLuis Pichardoenergy_progress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026M01322509-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
06/06/2017140637933Open ↗
06/16/2016122656330Open ↗
▸BISWORK PERMIT APPLICATION1
06/14/2016122656330Open ↗
▸Seals & Professional Certifications11
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/06/2017140637933Open ↗
06/16/2016122656330Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/26/2017122656330Open ↗
06/16/2016122656330Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M01322509-I1Open ↗
09/01/2026M01322509-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/16/2016122656330Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/06/2017140637933Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/06/2017140637933Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026M01322509-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026M01322509-I1Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
06/06/2017140637933Open ↗
06/16/2016122656330Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/06/2017140637933Open ↗
06/16/2016122656330Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026M01322509-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/26/2017122656330Open ↗
06/14/2016122656330Open ↗
▸BISNYCECC ANALYSIS1
06/06/2017140637933Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/26/2017122656330Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/06/2017140637933Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/06/2017140637933Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/26/2017122656330Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
06/06/2017140637933Open ↗
01/26/2017122656330Open ↗
06/16/2016122656330Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
06/16/2016122656330Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/06/2017140637933Open ↗