← Back
Elevator apt, miscellaneous
278 EAST 3 STREET
MANHATTAN · East Village · BIN 1004356
💬 Discuss this project
1900Year Built
6Stories
D9Building Class
R8BZoning
26,780 sfGross Floor Area
18Units
LL97 CoveredRent Stabilized5 Open Violations ▸FDNY Report ↗
Elevator apt, miscellaneous · Owner of record: TWO BUILDINGS TENANTS UNITED HDFC, INC. · 5,095 sf lot · 5.26 FAR built · Flood zone X500
Locations of Work
ArchitectureGeneral
Roof4p · 1 filing · 16 docs
Cellar2p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TWO BUILDINGS TENANTS UNITED HDFC509/01/2026
PEOPLES MUTUAL HOUSING ASSOC503/22/2026
CHEEVER DEVELOPMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OLD STRUCTURES ENGINEERING106/28/2026
L. NAOUM, P.E., P. C.303/26/2026
ESKW/A112/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BETRO DESIGN GROUP103/21/2026
Building Lifecycle
All (109)Filed (5)Violation (60)Objection (14)Special Inspection (30)
08/24/2026
Objection resolved — Addressed
08/03/2026
Violation issued (HPD, open)
A
08/03/2026
Violation issued (HPD, open)
A
07/14/2026
Objection raised — Scope
06/28/2026
Filed — Alteration
REPLACE EXISTING GAS BOILER WITH NEW AS PER PLANS FILED.
M01319257-S4
06/26/2026
Objection resolved — Resolved
06/26/2026
Objection resolved — Resolved
06/26/2026
Objection resolved — Resolved
06/26/2026
Objection resolved — Resolved
04/24/2026
Objection raised — Scope
04/24/2026
Objection raised — Other
04/23/2026
Objection raised — Cost
04/23/2026
Objection raised — Other
03/26/2026
Filed — Alteration
REPLACE EXISTING GAS BOILER WITH NEW AS PER PLANS FILED.
M01319257-S2
03/26/2026
Filed — Alteration
REPLACE EXISTING GAS BOILER WITH NEW AS PER PLANS FILED.
M01319257-S1
03/26/2026
Filed — Alteration
REPLACE EXISTING GAS BOILER WITH NEW AS PER PLANS FILED.
M01319257-S3
03/24/2026
Special inspection requirement — Wood – Seismic Resistance
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/23/2026
Special inspection requirement — Heating Systems
03/23/2026
Special inspection requirement — Post-installed Anchors
03/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/23/2026
Special inspection requirement — Final
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/23/2026
Special inspection requirement — Maintenance information
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/23/2026
Special inspection requirement — Shutoff dampers
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/23/2026
Special inspection requirement — Final
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/23/2026
Special inspection requirement — Masonry
03/23/2026
Special inspection requirement — Post-installed Anchors
03/23/2026
Special inspection requirement — Structural Steel - Details
03/23/2026
Special inspection requirement — Structural Steel - Welding
03/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/23/2026
Special inspection requirement — Mechanical Systems
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/23/2026
Special inspection requirement — Heating Systems
12/26/2025
Filed — Alteration
REPLACE EXISTING GAS BOILER WITH NEW AS PER PLANS FILED.
M01319257-I1
12/26/2025
Objection raised — Scope
12/26/2025
Objection raised — Scope
12/26/2025
Objection raised — Scope
12/26/2025
Objection raised — Structural
11/17/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2024
Violation issued (HPD, closed)
C
10/16/2024
Violation issued (HPD, closed)
C
10/16/2024
Violation issued (HPD, closed)
C
10/04/2024
Violation issued (HPD, closed)
C
09/21/2024
Violation issued (HPD, closed)
C
09/21/2024
Violation issued (HPD, closed)
C
04/01/2024
Violation issued (HPD, closed)
A
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDCHEEVER DEVELOPMENT CORP04/19/1993
BIS—ISSUEDCHEEVER DEVELOPMENT CORP03/17/1993
BISEQISSUEDCHEEVER DEVELOPMENT CORP03/26/1992
BIS—ISSUEDCHEEVER DEVELOPMENT CORP03/16/1992
BISEQISSUEDCHEEVER DEVELOPMENT CORP11/14/1991
BIS—ISSUEDCHEEVER DEVELOPMENT CORP08/19/1991
1 project · most recent 06/28/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/28/2026——Ventilation Systems
Ventilation
Greenheck G-097-VG 80 CFM · Exhaust Fan ×1
1 project · most recent 06/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/28/2026——Gas, Storm, Water/Sanitary
1 project · most recent 08/28/2026
FiledStatusContractorScope
08/28/2026Permit IssuedSOLAS ELECTRICAL CORP—
1 project · most recent 06/28/2026
Steel Masonry Wood
FiledStatusContractorScope
06/28/2026——Steel, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
03/24/2026Wood – Seismic Resistance—special
03/23/2026Fire-Resistant Penetrations and Joints—special
03/23/2026Heating Systems—special
03/23/2026Post-installed Anchors—special
03/23/2026Tenant Protection Plan Compliance—special
03/23/2026Final—progress
03/23/2026Energy Code Compliance Inspections—progress
03/23/2026HVAC-R and service water heating equipment—energy_progress
03/23/2026Maintenance information—energy_progress
03/23/2026HVAC-R and service water piping design and insulation—energy_progress
03/23/2026Shutoff dampers—energy_progress
03/23/2026HVAC-R and service water heating system controls—energy_progress
03/23/2026Final—progress
03/23/2026HVAC-R and service water heating equipment—energy_progress
03/23/2026HVAC-R and service water heating system controls—energy_progress
03/23/2026Masonry—special
03/23/2026Post-installed Anchors—special
03/23/2026Structural Steel - Details—special
03/23/2026Structural Steel - Welding—special
03/23/2026Tenant Protection Plan Compliance—special
03/23/2026Structural Stability – Alterations of existing buildings—special
03/23/2026Mechanical Systems—special
03/23/2026Fire-Resistant Penetrations and Joints—special
03/23/2026Tenant Protection Plan Compliance—special
03/23/2026Energy Code Compliance Inspections—progress
Latest 25 of 42.
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026M01319257-S2Request digital key ↗
08/20/2026M01319257-S3Request digital key ↗
08/14/2026M01319257-S4Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026M01319257-S3Open ↗
08/20/2026M01319257-S2Open ↗
08/20/2026M01319257-S1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/20/2026M01319257-S3Open ↗
08/20/2026M01319257-S2Open ↗
08/14/2026M01319257-S4Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026M01319257-I1Open ↗