← Back
Walk-up apt, over six families with stores
191 EAST 3 STREET
MANHATTAN · BIN 1005002
💬 Discuss this project
1900Year Built
6Stories
C7Building Class
R8BZoning
18,598 sfGross Floor Area
15Units
Rent Stabilized18 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 191 EAST 3RD ST HSNGETC · 4,616 sf lot · 4.03 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Floor 13p · 1 filing · 20 docs
CellarUnder Construction1p · 1 filing · 4 docs
2 jobs · most recent 02/17/2021
General Wiring
FiledStatusContractorScope
02/17/2021CompleteINTELOGIC ELECTRIC, INC.General Wiring
05/20/2019CompleteINTELOGIC ELECTRIC, INC.General Wiring
Building Lifecycle
All (90)Filed (5)Permit Issued (4)Signed Off (1)Violation (60)Inspection (2)Objection (2)Special Inspection (16)
09/04/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
YING HAO LI
08/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
YING HAO LI
08/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YING HAO LI
08/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/24/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
08/14/2026
Permit issued — Boiler Equipment
M01219195-I1-BE
04/29/2026
Violation issued (HPD, closed)
A
06/06/2025
Violation issued (HPD, closed)
C
06/06/2025
Violation issued (HPD, closed)
C
06/04/2025
Violation issued (HPD, closed)
A
05/23/2025
Permit issued — Boiler Equipment
M01219195-I1-BE
05/12/2025
Filed — Alteration
Replace one boiler at the cellar. No change in use, egress or occupancy under this application.
M01219195-I1
03/26/2025
Violation issued (HPD, closed)
C
03/26/2025
Violation issued (HPD, closed)
B
03/26/2025
Violation issued (HPD, open)
C
03/26/2025
Violation issued (HPD, closed)
B
03/26/2025
Violation issued (HPD, closed)
C
03/26/2025
Violation issued (HPD, closed)
C
04/01/2024
Violation issued (HPD, closed)
A
03/15/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
02/11/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/11/2022
Violation issued (ECB, closed)
Construction
10/13/2021
Signed off — Alteration
PLUMBING WORK AT 1ST FLOOR ONLY OF EXISTING 6 STORY BUILDING IN CONJUNCTION OF JOB#101159023.TO REMOVE VIOLATION#34088306N AND #34835837Z. NO CHANGE IN USE, EGRESS AND CERTIFICATE OF OCCUPANCY.
M00430902-I1
09/16/2021
Objection resolved — Addressed
09/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ROSS
09/16/2021
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM ROSS
09/16/2021
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM ROSS
09/16/2021
Special inspection requirement — Maintenance information
WILLIAM ROSS
09/14/2021
Objection raised — Other
09/07/2021
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR ONLY OF EXISTING 6 STORY BUILDING IN CONJUNCTION OF JOB#101159023.TO REMOVE VIOLATION#34088306N AND #34835837Z. NO CHANGE IN USE, EGRESS AND CERTIFICATE OF OCCUPANCY.
M00430902-P3
09/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ROSS
09/07/2021
Special inspection requirement — Maintenance information
WILLIAM ROSS
09/07/2021
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM ROSS
09/07/2021
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM ROSS
06/03/2021
Permit issued — Plumbing
M00430902-I1-PL
04/13/2021
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR ONLY OF EXISTING 6 STORY BUILDING IN CONJUNCTION OF JOB#101159023.TO REMOVE VIOLATION#34088306N AND #34835837Z. NO CHANGE IN USE, EGRESS AND CERTIFICATE OF OCCUPANCY.
M00430902-P2
04/01/2021
Violation issued (HPD, closed)
A
02/08/2021
Permit issued — Plumbing
M00430902-I1-PL
01/19/2021
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR ONLY OF EXISTING 6 STORY BUILDING IN CONJUNCTION OF JOB#101159023.TO REMOVE VIOLATION#34088306N AND #34835837Z. NO CHANGE IN USE, EGRESS AND CERTIFICATE OF OCCUPANCY.
M00430902-P1
01/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ROSS
01/18/2021
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM ROSS
01/18/2021
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM ROSS
01/18/2021
Special inspection requirement — Maintenance information
WILLIAM ROSS
11/23/2020
Filed — Alteration
PLUMBING WORK AT 1ST FLOOR ONLY OF EXISTING 6 STORY BUILDING IN CONJUNCTION OF JOB#101159023.TO REMOVE VIOLATION#34088306N AND #34835837Z. NO CHANGE IN USE, EGRESS AND CERTIFICATE OF OCCUPANCY.
M00430902-I1
04/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/15/2019
Violation issued (ECB, closed)
Construction
01/15/2019
Violation issued (ECB, closed)
Zoning
01/15/2019
Violation issued (ECB, closed)
Construction
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2016
Violation issued (HPD, closed)
I
07/13/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/12/2016
Violation issued (ECB, closed)
Construction
03/23/2016
Violation issued (HPD, closed)
C
03/23/2016
Violation issued (HPD, closed)
B
02/02/2015
Violation issued (HPD, closed)
I
Latest 60 of 90 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
191 EAST 3RD STREET HDFC608/16/2026
191 EAST 3RD ST HSNGETC1603/22/2026
191 EAST 3 ST HOUSING103/22/2026
NLS INC ESCRON DEPT103/22/2026
191 EAST THRID STREET HDF103/22/2026
HDF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITY BUILDING NY ARCHITECT P.C.105/12/2025
W.D.ROSS, R.A., P.C409/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AAA TOTAL PLUMBING, INCPlumbing208/16/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
W.D.ROSS, R.A., P.C3758409/07/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedAAA TOTAL PLUMBING, INC08/14/2026
DOB NOWBoiler EquipmentPermit IssuedAAA TOTAL PLUMBING, INC05/23/2025
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP06/03/2021
DOB NOWPlumbingSigned-offNICHOLAS SUIDA02/08/2021
BIS—ISSUEDSPLEN CONSTRUCTION INC04/05/2021
BIS—ISSUEDYILIN CONSTRUCTION INC02/04/2021
BISPLISSUEDCROSSFIELD PLBG.&HTG04/17/2019
BISOTISSUEDBWT CONSTRUCTION CORP04/03/2019
BIS—ISSUEDAMERICAN SCAFFOLDG.PRTS.CORP05/09/1997
BISOTISSUEDUNITED ALUMINUM DOOR INC03/06/1992
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/04/2026Pass-Final Boiler Equipment InspectionPassView ↗
08/24/2026Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/31/2026HVAC-R and service water heating equipmentYING HAO LIenergy_progress
08/31/2026HVAC-R and service water heating system controlsYING HAO LIenergy_progress
08/31/2026HVAC-R and service water piping design and insulationYING HAO LIenergy_progress
08/31/2026Tenant Protection Plan Compliance—special
09/16/2021Fire-Resistant Penetrations and JointsWILLIAM ROSSspecial
09/16/2021Energy Code Compliance InspectionsWILLIAM ROSSprogress
09/16/2021Fire-Resistance Rated ConstructionWILLIAM ROSSprogress
09/16/2021Maintenance informationWILLIAM ROSSenergy_progress
09/07/2021Fire-Resistant Penetrations and JointsWILLIAM ROSSspecial
09/07/2021Maintenance informationWILLIAM ROSSenergy_progress
09/07/2021Fire-Resistance Rated ConstructionWILLIAM ROSSprogress
09/07/2021Energy Code Compliance InspectionsWILLIAM ROSSprogress
01/18/2021Fire-Resistant Penetrations and JointsWILLIAM ROSSspecial
01/18/2021Energy Code Compliance InspectionsWILLIAM ROSSprogress
01/18/2021Fire-Resistance Rated ConstructionWILLIAM ROSSprogress
01/18/2021Maintenance informationWILLIAM ROSSenergy_progress
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00430902-P1Request digital key ↗
09/04/2026M00430902-P2Request digital key ↗
09/04/2026M00430902-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch1
08/23/2026M01219195-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION20
10/04/2022101159023Open ↗
08/30/2022101159023Open ↗
08/29/2022101159023Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION7
04/20/2021101159023Open ↗
02/05/2021101159023Open ↗
12/23/2020101159023Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/25/2021101159023Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/08/2021101159023Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026M01219195-I1Open ↗
08/29/2026M00430902-P3Open ↗
08/29/2026M00430902-P3Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
12/03/2020101159023Open ↗
11/25/2020101159023Open ↗
12/04/2019101159023Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/04/2026M00430902-P3Open ↗
09/04/2026M00430902-P2Open ↗
09/04/2026M00430902-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026M00430902-P3Open ↗
08/29/2026M00430902-I1Open ↗
08/28/2026M00430902-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/03/2019123835608Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/03/2019123835608Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/03/2019123835608Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan4
09/04/2026M00430902-P2Open ↗
09/04/2026M00430902-P1Open ↗
09/04/2026M00430902-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes1
04/03/2019123835608Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/04/2026M00430902-P2Open ↗
09/04/2026M00430902-P1Open ↗
09/04/2026M00430902-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/03/2019123835608Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/03/2020101159023Open ↗
11/25/2020101159023Open ↗
06/17/2019123835608Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
06/17/2019123835608Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/19/2022101159023Open ↗
01/05/2022101159023Open ↗
08/16/2021101159023Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE2
11/09/2020101159023Open ↗
10/28/2020101159023Open ↗
▸BISSUPERSEDING LETTER1
04/20/2021101159023Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/17/2019123835608Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/17/2019123835608Open ↗
04/03/2019123835608Open ↗
▸Filing & Intake Forms13
▸BISBOROUGH INTAKE FORM7
12/27/2019101159023Open ↗
12/04/2019101159023Open ↗
10/22/2019101159023Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
02/23/2022101159023Open ↗
01/20/2022101159023Open ↗
03/25/2021101159023Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET1
04/03/2019123835608Open ↗