← Back
Old law tenement
531 EAST 5 STREET
MANHATTAN · BIN 1005068
💬 Discuss this project
1900Year Built
5Stories
C4Building Class
R7BZoning
6,800 sfGross Floor Area
9Units
Rent Stabilized38 Open Violations ▸
Old law tenement · Owner of record: FARIBA ENTERPRISES,INC. · 2,426 sf lot · 2.8 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW AMERICAN CONSTRUCTION INC503/22/2026
FARIBE ENTERPRISES INC1403/22/2026
ZARIBA ENTERPRISES INC103/22/2026
OWNER OF 531 EAST 5TH ST.103/22/2026
SASSON REALTY MGT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAMAYO ARCHITECTS, P.C.101/10/2022
STEEL CORE ENGINEERING PLLC107/05/2021
GREEN DESIGN104/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ATLANTIC BUILDING SUPPLY INC.203/21/2026
S M EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW AMERICAN CONSTRUCTION INCGeneral Contractor303/21/2026
SUPER COOL HVAC, LLCGeneral Contractor303/21/2026
PINNACLE ENVIRONMENTAL COElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JCT DEVELOPMENT NY, INC5030101/10/2022
STEEL CORE ENGINEERING PL1098107/05/2021
Building Lifecycle
All (88)Filed (3)Permit Issued (2)Signed Off (2)Violation (60)Objection (10)Special Inspection (11)
04/29/2026
Violation issued (HPD, closed)
A
11/16/2025
Violation issued (HPD, closed)
C
11/16/2025
Violation issued (HPD, open)
C
11/16/2025
Violation issued (HPD, open)
C
11/16/2025
Violation issued (HPD, open)
C
11/16/2025
Violation issued (HPD, closed)
B
11/13/2025
Violation issued (HPD, closed)
C
11/13/2025
Violation issued (HPD, open)
B
11/13/2025
Violation issued (HPD, closed)
C
11/13/2025
Violation issued (HPD, open)
B
11/13/2025
Violation issued (HPD, open)
B
11/13/2025
Violation issued (HPD, closed)
C
06/04/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, open)
C
11/25/2024
Violation issued (HPD, open)
C
04/01/2024
Violation issued (HPD, closed)
A
12/02/2023
Violation issued (HPD, open)
B
12/02/2023
Violation issued (HPD, closed)
C
12/02/2023
Violation issued (HPD, open)
C
11/25/2023
Violation issued (HPD, open)
C
11/25/2023
Violation issued (HPD, open)
C
11/18/2023
Violation issued (HPD, open)
C
11/18/2023
Violation issued (HPD, open)
C
10/12/2022
Violation issued (HPD, closed)
C
10/12/2022
Violation issued (HPD, closed)
B
10/12/2022
Violation issued (HPD, open)
C
10/12/2022
Violation issued (HPD, closed)
B
08/05/2022
Violation issued (HPD, closed)
C
08/05/2022
Violation issued (HPD, closed)
B
08/05/2022
Violation issued (HPD, open)
C
08/05/2022
Violation issued (HPD, closed)
A
08/05/2022
Violation issued (HPD, closed)
B
08/05/2022
Violation issued (HPD, closed)
A
08/04/2022
Violation issued (HPD, closed)
C
08/04/2022
Violation issued (HPD, closed)
C
08/04/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
A
01/13/2022
Objection raised — Other
01/13/2022
Objection resolved — Addressed
01/13/2022
Objection raised — Energy
01/13/2022
Objection resolved — Addressed
01/10/2022
Filed — Alteration
AT THE FIFTH FLOOR APART.#4B REMOVE PATITION AND DOOR TO CORRECT VIOLATION # 39047568Y
M00637847-I1
11/26/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MABROUK
11/26/2021
Special inspection requirement — Final
MOHAMED MABROUK
10/12/2021
Violation issued (HPD, open)
B
10/12/2021
Violation issued (HPD, closed)
C
10/12/2021
Violation issued (HPD, open)
B
10/12/2021
Violation issued (HPD, open)
B
10/12/2021
Violation issued (HPD, open)
B
09/16/2021
Violation issued (ECB, open)
Construction
09/16/2021
Violation issued (ECB, open)
Construction
08/02/2021
Signed off — Alteration
NEW VRF SYSTEM AND DIRECT REPLACEMENT OF EXISTING HVAC ROOFTOP UNIT LOCATED ON THE LOWER ROOF OF THE BUILDING ON EXISTING DUNNAGE STEEL AND RECONNECT UTILITIES. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M00547940-I1
07/27/2021
Permit issued — Mechanical Systems
M00547940-I1-MS
07/13/2021
Objection raised — Other
07/13/2021
Objection resolved — Addressed
07/08/2021
Objection raised — Other
07/08/2021
Objection resolved — Addressed
07/08/2021
Objection raised — Other
07/08/2021
Objection resolved — Addressed
07/05/2021
Filed — Alteration
NEW VRF SYSTEM AND DIRECT REPLACEMENT OF EXISTING HVAC ROOFTOP UNIT LOCATED ON THE LOWER ROOF OF THE BUILDING ON EXISTING DUNNAGE STEEL AND RECONNECT UTILITIES. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M00547940-I1
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSUPER COOL HVAC, LLC07/27/2021
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION04/24/2019
BISOTISSUEDNURUL AMIN05/09/2019
BISOTISSUEDGREEN ARMY MEN LLC09/11/2014
BIS—ISSUEDRICH DESIGN AND CONSTRUCTION CO05/07/2002
BISMHISSUEDAIRTOWN PROJECTS11/09/2001
BISOTISSUEDSALAMAT ULLAH CONTRACTINGS12/04/1996
1 project · most recent 04/20/2019
FiledStatusContractorScope
04/20/2019CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/26/2021Structural Stability – Alterations of existing buildingsMOHAMED MABROUKspecial
11/26/2021FinalMOHAMED MABROUKprogress
07/02/2021HVAC-R and service water heating equipmentAlexander Sheymanenergy_progress
07/02/2021HVAC-R and service water piping design and insulationAlexander Sheymanenergy_progress
07/02/2021Heating SystemsAlexander Sheymanspecial
07/02/2021Maintenance informationAlexander Sheymanenergy_progress
07/02/2021Shutoff dampersAlexander Sheymanenergy_progress
07/02/2021HVAC-R and service water heating system controlsAlexander Sheymanenergy_progress
06/27/2021Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
06/27/2021Mechanical SystemsAlexander Sheymanspecial
06/27/2021FinalAlexander Sheymanprogress
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/15/2026M00547940-I1Request digital key ↗
08/14/2026M00637847-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00157350-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION2
05/07/2019140846592Open ↗
12/24/2013140143609Open ↗
▸BISWORK PERMIT APPLICATION2
05/07/2019140846592Open ↗
09/11/2014140143609Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
10/30/2014120608850Open ↗
▸BISPLACE OF ASSEMBLY1
06/13/2011120608850Open ↗
▸Seals & Professional Certifications17
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/20/2019140846592Open ↗
09/25/2014140143609Open ↗
06/13/2011120608850Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00547940-I1Open ↗
09/01/2026M00547940-I1Open ↗
08/26/2026M00637847-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/03/2026M00547940-I1Open ↗
08/13/2026M00157350-I1Open ↗
08/13/2026M00637847-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00547940-I1Open ↗
08/26/2026M00637847-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/07/2019140846592Open ↗
▸BISApplicant / Owner Signature1
12/24/2013140143609Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/07/2019140846592Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/07/2019140846592Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
05/07/2019140846592Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026M00547940-I1Open ↗
08/13/2026M00637847-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/07/2019140846592Open ↗
▸Energy Compliance8
▸BISAS-BUILT ENERGY ANALYSIS2
08/20/2019140846592Open ↗
09/25/2014140143609Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/20/2019140846592Open ↗
09/25/2014140143609Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/07/2019140846592Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/24/2013140143609Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/07/2019140846592Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026M00547940-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/07/2019140846592Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/20/2019140846592Open ↗
09/25/2014140143609Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/15/2014120608850Open ↗
10/15/2014120608850Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/13/2011120608850Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/20/2019140846592Open ↗
05/07/2019140846592Open ↗
09/25/2014140143609Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
05/07/2019140846592Open ↗
12/24/2013140143609Open ↗
▸BISBOROUGH INTAKE FORM1
08/20/2019140846592Open ↗
▸Other Documents5
▸DOB NOWHPD4: CONH Pilot Program2
08/15/2026M00547940-I1Open ↗
08/13/2026M00637847-I1Open ↗
▸DOB NOWDHCR Document2
08/15/2026M00547940-I1Open ↗
08/13/2026M00637847-I1Open ↗
▸BISHPD: CONH PILOT1
05/07/2019140846592Open ↗