← Back
Walk-up apt, over six families with stores
125 ALLEN STREET
MANHATTAN · BIN 1005493
💬 Discuss this project
1900Year Built
6Stories
C7Building Class
C4-4AZoning
10,254 sfGross Floor Area
26Units
Rent Stabilized167 Open Violations 166 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: 125-127 ALLEN ST ASSOC · 2,204 sf lot · 4.65 FAR built · Flood zone X
Locations of Work
Architecture
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CRJ177 YAHOO COM2007/08/2026
125-127 ALLEN ST ASSOC1803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PETER NYIAM708/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANKLYN ESTRELLA ARCHITECT PLLC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DPH PLUMBING & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252508/26/2025
Building Lifecycle
All (84)Filed (7)Permit Issued (3)Signed Off (3)Violation (60)Inspection (3)Special Inspection (8)
04/29/2026
Violation issued (HPD, open)
A
10/08/2025
Signed off — Alteration
APPLICATION FILED TO REPLACE FUEL BURNER WITH NEW DUAL FUEL BURNER IN CONJUNCTION WITH PLUMBING APPLICATION #M01116158-I1. ALL AS PER PLANS FILED HEREWITH.
M01116158-S2
10/08/2025
Signed off — Alteration
APPLICATION FILED TO REPLACE FUEL BURNER WITH NEW DUAL FUEL BURNER IN CONJUNCTION WITH PLUMBING APPLICATION #M01116158-I1. ALL AS PER PLANS FILED HEREWITH.
M01116158-I1
10/08/2025
Signed off — Alteration
APPLICATION FILED TO REPLACE FUEL BURNER WITH NEW DUAL FUEL BURNER IN CONJUNCTION WITH PLUMBING APPLICATION #M01116158-I1. ALL AS PER PLANS FILED HEREWITH.
M01116158-S1
09/04/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/26/2025
Filed — Alteration
APPLICATION FILED TO REPLACE FUEL BURNER WITH NEW DUAL FUEL BURNER IN CONJUNCTION WITH PLUMBING APPLICATION #M01116158-I1. ALL AS PER PLANS FILED HEREWITH.
M01116158-P4
08/26/2025
Filed — Alteration
APPLICATION FILED TO REPLACE FUEL BURNER WITH NEW DUAL FUEL BURNER IN CONJUNCTION WITH PLUMBING APPLICATION #M01116158-I1. ALL AS PER PLANS FILED HEREWITH.
M01116158-P3
08/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
08/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/11/2025
Permit issued — Boiler Equipment
M01116158-S2-BE
07/23/2025
Filed — Alteration
APPLICATION FILED TO REPLACE FUEL BURNER WITH NEW DUAL FUEL BURNER IN CONJUNCTION WITH PLUMBING APPLICATION #M01116158-I1. ALL AS PER PLANS FILED HEREWITH.
M01116158-S2
07/18/2025
Violation issued (HPD, open)
C
07/18/2025
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
A
05/16/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
05/08/2025
Special inspection requirement — Heating Systems
INDARDEO PARBHUNATH
05/06/2025
Filed — Alteration
APPLICATION FILED TO REPLACE FUEL BURNER WITH NEW DUAL FUEL BURNER IN CONJUNCTION WITH PLUMBING APPLICATION #M01116158-I1. ALL AS PER PLANS FILED HEREWITH.
M01116158-P1
05/06/2025
Filed — Alteration
APPLICATION FILED TO REPLACE FUEL BURNER WITH NEW DUAL FUEL BURNER IN CONJUNCTION WITH PLUMBING APPLICATION #M01116158-I1. ALL AS PER PLANS FILED HEREWITH.
M01116158-P2
05/06/2025
Special inspection requirement — Heating Systems
INDARDEO PARBHUNATH
05/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
05/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/26/2024
Permit issued — Boiler Equipment
M01116158-S1-BE
11/26/2024
Permit issued — Plumbing
M01116158-I1-PL
11/20/2024
Violation issued (HPD, closed)
C
11/20/2024
Violation issued (HPD, open)
B
11/13/2024
Violation issued (HPD, closed)
C
11/13/2024
Violation issued (HPD, closed)
C
10/29/2024
Violation issued (HPD, open)
A
10/29/2024
Violation issued (HPD, open)
C
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
C
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
C
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
C
10/21/2024
Filed — Alteration
APPLICATION FILED TO REPLACE FUEL BURNER WITH NEW DUAL FUEL BURNER IN CONJUNCTION WITH PLUMBING APPLICATION #M01116158-I1. ALL AS PER PLANS FILED HEREWITH.
M01116158-S1
09/25/2024
Filed — Alteration
APPLICATION FILED TO REPLACE FUEL BURNER WITH NEW DUAL FUEL BURNER IN CONJUNCTION WITH PLUMBING APPLICATION #M01116158-I1. ALL AS PER PLANS FILED HEREWITH.
M01116158-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2024
Violation issued (HPD, open)
A
03/05/2024
Violation issued (HPD, closed)
C
03/05/2024
Violation issued (HPD, open)
C
03/05/2024
Violation issued (HPD, closed)
C
03/05/2024
Violation issued (HPD, open)
B
03/05/2024
Violation issued (HPD, closed)
C
11/21/2023
Violation issued (HPD, open)
C
11/21/2023
Violation issued (HPD, open)
C
10/26/2023
Violation issued (HPD, open)
B
10/26/2023
Violation issued (HPD, open)
B
10/26/2023
Violation issued (HPD, open)
A
10/26/2023
Violation issued (HPD, open)
C
10/26/2023
Violation issued (HPD, open)
A
10/26/2023
Violation issued (HPD, closed)
C
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offMVC HEATING CORP08/11/2025
DOB NOWBoiler EquipmentSigned-offDPH PLUMBING & HTG CORP11/26/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP11/26/2024
BISOTISSUEDN/A09/25/2007
2 projects · most recent 06/15/2018
General Wiring
FiledStatusContractorScope
06/15/2018CompleteDELTEX ELECTRICAL CONT. I—
06/11/2018Permit IssuedECS ELEC'L CONTG SERV INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/04/2025Pass-Final Boiler Equipment InspectionPassView ↗
05/16/2025Pass-Final Boiler Equipment InspectionPassView ↗
05/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/26/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
08/26/2025Tenant Protection Plan Compliance—special
05/08/2025Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
05/08/2025Heating SystemsINDARDEO PARBHUNATHspecial
05/06/2025Heating SystemsINDARDEO PARBHUNATHspecial
05/06/2025Tenant Protection Plan Compliance—special
05/06/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
05/06/2025Tenant Protection Plan Compliance—special
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026M01116158-P2Request digital key ↗
08/21/2026M01116158-I1Request digital key ↗
08/21/2026M01116158-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026M01116158-P1Open ↗
08/13/2026M01116158-P2Open ↗
08/13/2026M01116158-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026M01116158-S1Open ↗
09/23/2026M01116158-S1Open ↗
09/01/2026M01116158-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026M01116158-I1Open ↗
08/13/2026M01116158-P4Open ↗
08/13/2026M01116158-P3Open ↗
Showing 3 of 7 on file for this type