| Owner | Filings | Most Recent |
|---|---|---|
| PLATTELAND | 8 | 09/13/2026 |
| SULLIVAN | 6 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/18/2023 | $5.3M | — | SULLIVAN LLC → PLATTELAND LLC | $2,123/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| DAVIES TOEWS ARCHITECTURE | 3 | 08/07/2026 |
| ROBERT SILMAN ASSOCIATES | 2 | 08/05/2026 |
| P.A. COLLINS PE | 3 | 07/14/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| DEVITO, ANTHONY | Electrical | 1 | 03/21/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| BIS | OT | ISSUED | RICHARD C. MUGLER CO. INC | 03/18/2010 |
| BIS | OT | ISSUED | RICHARD C. MUGLER CO. INC | 01/29/2010 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/05/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Ventilation Daikin FXTA24ABVJUA 27,000 BTU · Vrf Indoor ×4 FXSA18AAVJU 20,000 BTU · Vrf Indoor ×2 FXTA12ABVJUA 13,500 BTU · Vrf Indoor ×2 FXTA18ABVJUA 20,000 BTU · Vrf Indoor ×2 FXTA54ABVJUA 60,000 BTU · Vrf Indoor ×2 FXAA18AAVJU 20,000 BTU · Vrf Indoor ×1 FXAA24AAVJU 27,000 BTU · Vrf Indoor ×1 FXSA24AAVJU 27,000 BTU · Vrf Indoor ×1 FXSA36AAVJU 40,000 BTU · Vrf Indoor ×1 FXTA36ABVJUA 40,000 BTU · Vrf Indoor ×1 FXTA48ABVJUA 54,000 BTU · Vrf Indoor ×1 Desertaire LV05RNNN2 76,000 BTU · Ahu ×1 Renewaire HE 10IN 1,000 CFM · Erv ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | — | — | Steel, Concrete, Masonry |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/27/2026 | Final | — | progress |
| 06/23/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 06/23/2026 | Concrete - Cast-In-Place | — | special |
| 06/23/2026 | Post-installed Anchors | — | special |
| 06/23/2026 | Structural Steel - High Strength Bolting | — | special |
| 06/23/2026 | Structural Steel - Welding | — | special |
| 06/23/2026 | Masonry | — | special |
| 06/23/2026 | Structural Cold-Formed Steel | — | special |
| 06/23/2026 | Structural Steel - Details | — | special |
| 06/23/2026 | Subgrade Inspections | — | special |
| 06/23/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/23/2026 | Concrete - Cast-In-Place | — | special |
| 06/23/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 06/23/2026 | Masonry | — | special |
| 06/23/2026 | Post-installed Anchors | — | special |
| 06/23/2026 | Structural Cold-Formed Steel | — | special |
| 06/23/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/23/2026 | Structural Steel - Details | — | special |
| 06/23/2026 | Structural Steel - High Strength Bolting | — | special |
| 06/23/2026 | Structural Steel - Welding | — | special |
| 06/23/2026 | Subgrade Inspections | — | special |
| 06/23/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/23/2026 | Energy Code Compliance Inspections | — | progress |
| 06/05/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/02/2026 | Final | — | progress |